A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE
COLORADO APPROVING CHANGE ORDER NO.2 TO THE CONTRACT BETWEEN
THE TOWN OF FIRESTONE AND SUN VALLEY ELECTRIC INC FOR
CONSTRUCTIONOF
HORIZONTAL ONE PUMP STATIONUVIAL
TREATMENT
WHEREAS, by Resolution No. 22-64 the Town of Firestone ("Town") entered into a
contract with Sun Valley Electric Inc. ("Sun Valley") to construct the Firestone Alluvial Supply
Treatment ("FAST") Horizontal Well Pump Station; and
WHEREAS, by Resolution No. 23-28 the Town approved Change Order No. 1 which
extended the contract time and authorized Sun Valley to construct improvements such as additional
exterior lighting, an additional thermostat and access improvements; and
WHEREAS, Sun Valley recommends that the Town install a lightning protection system
as the silthe
ctcmain
llvjlllControl
and Acquisition on Programmable Logic Controllers Pump
hontrol the FASTAuAlluvial and
WHEREAS Staff finds that such recommendation is prudent and Sun Valley has offered
the Town a favorable price for the project's materials and installation.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
Change Order No. 2 to the FAST Horizonal Well Pump Station Contract between the
Town of Firestone and Sun Valley Electric Inc. is approved in substantially the same form as the
copy attached hereto and made a part of this resolution and the Mayor is authorized to execute
Change Order No. 2 on behalf of the Town.
INTRODUCED, READ AND ADOPTED this�*ay of _, 2023.
SI&AL
ATTEST:"
Miriai una Gonzalez, Deputy Town Clerk
TOVJT) FIRE NE, COLORADO
Drew Alan Peterson, Mayor
FORM:
William P. Hayashi, Town Attorney
SECTION 00941
CHANGE ORDER
No. 2
Date of Issuance: 0317J2023 Effective Date: 03/07/2023
Firestone FAST Pump Station ITown of Firestone
W2020-9531.02
Sun Valley
5/11/2022
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
Sun Valley is being issued a change in contract price for an increase in scope of work for additional electrical work at the Horizontal Well
Pump Station. Additional scope of work includes; Providing and installing lightning protection for the pump station building ($5,277.00). Sun
Valley is also being issued a change in time to perform the additional scope of work. Substantial completion is being moved to April 20M
based on Sun Valley's schedule with a Final Completion Date of May le.
The Following Line Items are Added to the contract:
PCO#2.1 — Provide and Install Lightning Protection on Pump Station Building $5,277.00
Attachments (list documents supporting change):
Sun Valley Proposal PCO-01 HWFPS Lightning Protection System Complete.pi f
CHANGE IN CONTRACT PRICE:
CHANGE IN CONTRACT TIMES:
Original Contract Price:
Original Contract Times: ❑ Working days ® Calendar days
Substantial completion (days or date): August 150 2022
$420 450 00
Ready for final payment (days or date): August 310 2022
[Inefease] [9eer6ee9] from previously approved Change
[Increase] [Decrease] from previously approved Change Orders
Orders No. 1 to No. 1:
No. _ to No.
Substantial completion (days): n/a
$7 725.00
Ready for final payment (days): n/a
Contract Price prior to this Change Order:
Contract Times prior to this Change Order:
Substantial completion (days or date): March 17T 2023
$428,175.00
Ready for final payment (days or date): April 1't 2023
[Increase] {Begrease) of this Change Order:
[Increase] (Becreasa) of this Change Order:
Substantial completion (days or date): April 20t 2023
$5 277.00 _
Ready for final payment (days or date): May 1' - 2023
Contract Price incorporating this Change Order:
Contract Times with all approved Change Orders:
Substantial completion (days or date): April 20"2023
$433A52.00
eady, for fiy payment (days or date): May 1" 2023
RECOMMENDER:. ACC
ACCEPTED:
a..tln IMF In RN WYGM
By: ��-� By: By:
Owner Signature) �®C
Engineer (Authorized Signature)
(Authorized �nw^xedo o�gnatura)
IS'M'I60TOP
Date: 04- U ol1293 Date:
lx!Date:
Approved by Fundin cy (if applicable):
Date: —
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
00941-1 of 2