Loading...
HomeMy WebLinkAboutKugel V 18-3 - Well Abandonment Report - Kerr McGee - 12/13/2018Status VISU0556SURF 12+1/4 8+5/8 24 556 390 CBL6,3757,6021ST 7+7/8 3+1/2 7.7 7,602 190 CBL3,8305,112S.C. 1.1 7,602 407 CBL541,200S.C. 1.2 1,115 335 Casing Type Size of Hole Size of Casing Weight Per Foot Setting Depth Sacks Cement Cement TopCement Bot Casing History Subsequent Report of Abandonment Details: If yes, explain details below If yes, explain details below Yes NoWellbore has Uncemented Casing leaks: NoYesFish in Hole: Estimated Depth:NoYesCasing to be pulled: Other Mechanical ProblemsProduction Sub-economicDryReason for Abandonment: -104.93605040.144100 Longitude: GPS Data: Only Complete the Following Background Information for Intent to Abandon Joseph Collins1.701/22/2010 GPS Instrument Operator's Name:PDOP Reading:Date of Measurement: Latitude: 90750Field Number:Field Name:WATTENBERG Federal, Indian or State Lease Number: Meridian:667W Range:Township:2N 18Section:QtrQtr: V 18-3 Well Number: NENW County:WELD Location: KUGELWell Name: 05-123-17256-00API Number This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the abandonment is complete, this form shall again be submitted as a Subsequent Report of the actual work completed. The approved intent shall be valid for six months after the approval date, after that period, a new intent will be required. Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration and the proposed configuration with plugs set. A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent Report are a wellbore diagram showing plugs that were set and casing remaining in the hole, the job summaries from all plugging contractors used, including wireline and cementing (third party verification) and any logs that may have been run during abandonment. State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 WELL ABANDONMENT REPORT FORM 6 Rev 12/05 Notice of Intent to Abandon cheryl.light@anadarko.comEmail: (720) 929-7461Fax: (720) 929-6461Phone: Zip:80217- 3779 COState:DENVER P O BOX 173779 Contact Name: City: CHERYL LIGHT Address: KERR MCGEE OIL & GAS ONSHORE LPName of Operator: 47120OGCC Operator Number: jason.gomez@state.co.usEmail: Tel:(970) 573-1277Name:Gomez, Jason For "Intent" 24 hour notice required, COGCC contact: 02/22/2018 Date Received: Document Number: DE ET OE ES 401552643 Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth CODELL 7480 7499 Total: 1 zone(s) Current and Previously Abandoned Zones Page 1 of 3Date Run: 5/7/2018 Doc [#401552643] Well Name: KUGEL V 18-3 *ATTACH JOB SUMMARY Technical Detail/Comments: 11/6/2018Expiration Date: NoYesFlowline/Pipeline has been abandoned per Rule 1103 Type of Cement and Additives Used: *Cementing Contractor: *Wireline Contractor: Plugging Date:inch casingft. of Additional Plugging Information for Subsequent Report Only Casing Recovered: Plug Tagged: Plug Type: Plug Tagged: Plug Type: Plug Tagged: Plug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASING Plug Tagged: (Cast Iron Cement Retainer Depth) CICR Depth CICR Depth CICR Depth sacks cmt on top.withCIBP #5: Depth sacks cmt on top.80 with 4sacks cmt on top. CIPB #4: Depth2with4850CIBP #3: Depth Set sacks in mouse holeSetsacks in rat hole NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate 4Set sacks at surface ft.ft. tosacks half in. half out surface casing fromSet sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at ft. ft. tosks cmt fromSet ft. ft. tosks cmt fromSet ft. ft. tosks cmt fromSet ft. 506ft. to1010sks cmt fromSet30 ft. 6850ft. to7430sks cmt from25Set sacks cmt on top.4090 with 2sacks cmt on top. CIPB #2: Depth25with7430CIBP #1: Depth Plug Type: NOTE: Two(2) sacks cement required on all CIBPs. Plugging Procedure for Intent and Subsequent Report McCoy, Diane Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable orders and is hereby approved. COGCC Approved:Date:5/7/2018 I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete. Signed:Print Name:CHERYL LIGHT Title:SR REGULATORY ANALYST Date:2/22/2018 Email:DJREGULATORY@ANADARKO.COM CONDITIONS OF APPROVAL, IF ANY: Page 2 of 3Date Run: 5/7/2018 Doc [#401552643] Well Name: KUGEL V 18-3 COA Type Description 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon all flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 3) Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure. Attachment Check List Att Doc Num Name 401552643 WELL ABANDONMENT REPORT (INTENT) 401552685 WELLBORE DIAGRAM 401552687 PROPOSED PLUGGING PROCEDURE 401631643 FORM 6 INTENT SUBMITTED Total Attach: 4 Files User Group Comment Comment Date Public Room Pass 03/08/2018 Permit pass 02/28/2018 Total: 2 comment(s) General Comments Page 3 of 3Date Run: 5/7/2018 Doc [#401552643] Well Name: KUGEL V 18-3 THE PLUG & ABANDONMENT PROCESS When a well is no longer economically producing oil and natural gas, the well is evaluated for retirement and will undergo a process called ‘plug and abandonment,' or P&A as it is often called. To retire, or P&A, a well, the operator must submit a plug and abandonment plan to the state regulatory authority, the Colorado Oil and Gas Conservation Commission (COGCC) for approval. Once the plan is approved by the COGCC, the operator is required to inform the municipality where the well is located. Operators also communicate with surface land and mineral owners and surrounding neighbors regarding the retirement of the well. A workover rig arrives on-site. While the rig is on location, the well will be plugged per the plan approved by the COGCC. Cement is pumped into the well to cover and isolate the zones that produce oil and natural gas. 1 2 When the plugging operation is complete, the workover rig moves o the location, the well head is removed and the associated flowlines are excavated. Associated surface equipment (tanks, separators, etc.) may also be removed if it is not serving other active wells in the area. 3 The remaining portion of the well is cut a minimum of seven feet below the surface and an identifying marker is welded to the top of the plugged wellbore. 4 A final report is submitted to the COGCC to certify the wellbore has been plugged in accordance with the regulatory requirements. 5 The site is reclaimed, or restored, to match the existing landscape. Colorado Response Line: 1-866-248-9577 | anadarkocolorado@anadarko.com How a A Well is Retired