Off-Location Flowline
FORM
44
Rev
03/18
Document Number:
OGCC RECEPTION
Receive Date:
02/22/2019
The Flowline Report, Form 44, shall be submitted to register, report realignment, report removal from service, or report
abandonment of Off-Location Flowlines , Produced Water Transfer Systems, Domestic Taps, or Crude Oil Transfer Lines as
required by the 1100 Series Rules. The Form shall also be submitted to report Grade 1 Gas Leaks from Flowlines per Rule
1104.k.
401948781
OFF LOCATION FLOWLINE
FLOWLINE ENDPOINT LOCATION IDENTIFICATION
Location ID:318971 Location Type:Production Facilities
Name:LISA-62N67W Number:18NESW
County:WELD
Qtr Qtr:NESW Section:18 Township:2N Range:67W Meridian:6
Latitude:40.136856 Longitude:-104.935711
FLOWLINE FACILITY INFORMATION
Flowline Facility ID:462216 Flowline Type:Wellhead Line Action Type:Abandonment
OFF LOCATION FLOWLINE REGISTRATION
Flowline End Point Riser
Latitude:40.136639 Longitude:-104.935900 PDOP:1.6 Measurement Date:08/12/2017
Equipment at End Point Riser:Separator
Flowline Start Point Location Identification
Location ID:318971 Location Type:Well Site
Name:LISA-62N67W Number:18NESW
County:WELD
Qtr Qtr:NESW Section:18 Township:2N Range:67W Meridian:6
Latitude:40.136856 Longitude:-104.935711
Flowline Start Point Riser
Latitude:40.136861 Longitude
:
-104.935713 PDOP:1.3 Measurement Date:08/12/2017
Equipment at Start Point Riser:Well
No Location ID
OGCC Operator Number:
City:
Company Name:
Address:
47120
KERR MCGEE OIL & GAS ONSHORE LP
P O BOX 173779
DENVER Zip:State:80217-3779
Contact Person:Mike Holle
Phone:(720) 9296639
CO
Email:mike.holle@anadarko.com
Is the Operator a Tier One member of the Utility Notification Center of Colorado (UNCC) that participates in Colorado's
One Call notification system?Yes No
Operator Information
Date Run: 2/22/2019 Doc [#401948781]Page 1 of 3
Flowline Description and Testing
Type of Fluid Transferred:Pipe Material:Max Outer Diameter:(Inches)
Bedding Material:Date Construction Completed:10/24/1981
Maximum Anticipated Operating Pressure (PSI):Testing PSI:
Test Date:
OFF LOCATION FLOWLINE ABANDONMENT
Date:12/13/2018
Description of Abandonment
The Lisa # 1 P&A is complete. The well head was cut and capped on 12/17/2018. The entire flow line was removed
on 12/13/2018. The entire tank battery and sales line only were removed on 12/13/2018.
FLOWLINE FACILITY INFORMATION
Flowline Facility ID:462217 Flowline Type:Wellhead Line Action Type:Abandonment
OFF LOCATION FLOWLINE REGISTRATION
Flowline End Point Riser
Latitude:40.136637 Longitude:-104.935913 PDOP:1.5 Measurement Date:08/18/2017
Equipment at End Point Riser:Separator
Flowline Start Point Location Identification
Location ID:319427 Location Type:Well Site
Name:LISA-62N67W Number:18SESW
County:WELD
Qtr Qtr:SESW Section:18 Township:2N Range:67W Meridian:6
Latitude:40.133631 Longitude:-104.935667
Flowline Start Point Riser
Latitude:40.133639 Longitude
:
-104.935695 PDOP:1.4 Measurement Date:08/14/2017
Equipment at Start Point Riser:Well
Flowline Description and Testing
Type of Fluid Transferred:Pipe Material:Max Outer Diameter:(Inches)
Bedding Material:Date Construction Completed:08/30/1983
Maximum Anticipated Operating Pressure (PSI):Testing PSI:
Test Date:
OFF LOCATION FLOWLINE ABANDONMENT
Date:12/13/2018
Description of Abandonment
The Lisa 2 P&A is complete. The well head was cut and capped on 12/7/2018. The entire flow line was removed on
12/13/2018.
No Location ID
Comments
OPERATOR COMMENTS AND SUBMITTAL
Date Run: 2/22/2019 Doc [#401948781]Page 2 of 3
mike.holle@anadarko.com
SDA
02/22/2019
Mike Holle
COGCC Approved:Director of COGCC Date:
Based on the information provided herein, this Flowline Report complies with COGCC Rules and applicable orders and is hereby
approved.
Title:
Email:Date:
Print Name:
Signed:
I hereby certify that the statements made in this form are, to the best of my knowledge, true, correct and complete.
The Lisa # 1 P&A is complete. The well head was cut and capped on 12/17/2018. The entire flow line was removed on
12/13/2018. The entire tank battery and sales line only were removed on 12/13/2018.
LISA 1 05-123-10408 LISA #1 FLOWLINE
The Lisa 2 P&A is complete. The well head was cut and capped on 12/7/2018. The entire flow line was removed on
12/13/2018.
LISA 2 05-123-11244 LISA #2 FLOWLINE