HomeMy WebLinkAboutMCCLAY 5-4A - Well Abandonment Report - Kerr McGee - 1/14/2019Casing History
Subsequent Report of Abandonment
Details:
If yes, explain details below
If yes, explain details below
Yes NoWellbore has Uncemented Casing leaks:
NoYesFish in Hole:
Estimated Depth:NoYesCasing to be pulled:
Other
Mechanical ProblemsProduction Sub-economicDryReason for Abandonment:
-104.90209540.168691 Longitude:
GPS Data:
Only Complete the Following Background Information for Intent to Abandon
Chris Fisher2.102/01/2013 GPS Instrument Operator's Name:PDOP Reading:Date of Measurement:
Latitude:
90750Field Number:Field Name:WATTENBERG
Federal, Indian or State Lease Number:
Meridian:667W Range:Township:2N 4 Section:QtrQtr:
5-4A Well Number:
SWNW
County:WELD
Location:
MCCLAYWell Name:
05-123-21001-00API Number
This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the abandonment is complete, this
form shall again be submitted as a Subsequent Report of the actual work completed. The approved intent shall be valid for six months after the approval
date, after that period, a new intent will be required. Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration
and the proposed configuration with plugs set.
A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent Report are a wellbore
diagram showing plugs that were set and casing remaining in the hole, the job summaries from all plugging contractors used, including wireline and
cementing (third party verification) and any logs that may have been run during abandonment.
State of Colorado
Oil and Gas Conservation Commission
1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109
WELL ABANDONMENT REPORT
FORM
6
Rev
05/18
Notice of Intent to Abandon
cheryl.light@anadarko.comEmail:
(720) 929-7461Fax:
(720) 929-6461Phone:
Zip:80217-
3779
COState:DENVER
P O BOX 173779
Contact Name:
City:
CHERYL LIGHT
Address:
KERR MCGEE OIL & GAS ONSHORE LPName of Operator:
47120OGCC Operator Number:
jason.gomez@state.co.usEmail:
Tel:(970) 573-1277Name:Gomez, Jason For "Intent" 24 hour notice required,
COGCC contact:
01/14/2019
Date Received:
Document Number:
DE ET OE ES
401903944
Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth
CODELL 7396 7416
J SAND 7834 7887
NIOBRARA 7142 7260
Total: 3 zone(s)
Current and Previously Abandoned Zones
Page 1 of 3Date Run: 3/22/2019 Doc [#401903944] Well Name: MCCLAY 5-4A
*ATTACH JOB SUMMARY
Technical Detail/Comments:
9/21/2019Expiration Date:
NoYesFlowline/Pipeline has been abandoned per Rule 1105
Type of Cement and Additives Used:
*Cementing Contractor: *Wireline Contractor:
Plugging Date:inch casingft.
of
Additional Plugging Information for Subsequent Report Only
Casing Recovered:
Plug Tagged: Plug Type:
Plug Tagged: Plug Type:
Plug Tagged: Plug Type:
Plug Tagged:CASINGPlug Type:
Plug Tagged:CASING
Plug Tagged:
(Cast Iron Cement Retainer Depth)
CICR Depth
CICR Depth
CICR Depth
sacks cmt on top.withCIBP #5: Depth
sacks cmt on top.80 with 7sacks cmt on top. CIPB #4: Depth2with4050CIBP #3: Depth
Set sacks in mouse holeSetsacks in rat hole
NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate
7Set sacks at surface
ft.608ft. to985sacks half in. half out surface casing fromSet50
sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at
sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at
sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at
ft. ft. tosks cmt fromSet
ft. ft. tosks cmt fromSet
ft. ft. tosks cmt fromSet
ft. 2300ft. to2500sks cmt fromSet15
ft. 6670ft. to7070sks cmt from25Set
sacks cmt on top.7070 with 25sacks cmt on top. CIPB #2: Depth2with7750CIBP #1: Depth
Plug Type:
NOTE: Two(2) sacks cement
required on all CIBPs.
Plugging Procedure for Intent and Subsequent Report
Status
VISU0658SURF 12+1/4 8+5/8 24 658 460
CBL6,5007,9531ST 7+7/8 4+1/2 11.6 7,953 220
CBL3,6833,890S.C. 1.1 3,890 15
CBL903,752S.C. 1.2 3,752 1,000
CBL3,8005,133Stage Tool 5,091 300
Casing Type Size of Hole Size of Casing Weight Per Foot Setting Depth Sacks Cement Cement TopCement Bot
Jacobson, Eric
Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable
orders and is hereby approved.
COGCC Approved:Date:3/22/2019
I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete.
Signed:Print Name:CHERYL LIGHT
Title:Staff Regulatory Analyst Date:1/14/2019 Email:DJREGULATORY@ANADARKO.COM
CONDITIONS OF APPROVAL, IF ANY:
Page 2 of 3Date Run: 3/22/2019 Doc [#401903944] Well Name: MCCLAY 5-4A
COA Type Description
Operator to submit Gyro survey dated 11/16/2013 as indicated on the submitted
plugging procedure with the Form 6 SROA.
If there has not been a reported Bradenhead test within 60 days of plugging this well,
prior to starting plugging operations, a Bradenhead test shall be performed.
1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25
psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during
the test, sampling is required.
3) If sampling is required contact COGCC engineering for a confirmation of plugging
requirements prior to placing any plugs.
Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting
Instructions.
The Form 17 shall be submitted within 10 days of the test.
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Prior to placing the 985' plug: verify that all fluid migration (liquid or gas) has been
eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer
for an update to plugging orders.
3) After isolation has been verified, pump plug and displace. If cement is not circulated
to surface, shut-in, WOC 4 hours then tag plug – must be at 608' or shallower and
provide 10 sack plug at surface.
4) Leave at least 100’ of cement in the wellbore for each plug.
5) Properly abandon on-location flowlines as per Rule 1105. File electronic Form 42
once abandonment is complete. Within 30 days of an operator completing
abandonment requirements for an off-location flowline or crude oil transfer line, the
operator must submit a Flowline Report, Form 44.
Operator shall implement measures to control venting, to protect health and safety, and
to ensure that vapors and odors from well plugging operations do not constitute a
nuisance or hazard to public welfare.
Attachment Check List
Att Doc Num Name
401903944 WELL ABANDONMENT REPORT (INTENT)
401904154 PROPOSED PLUGGING PROCEDURE
401904155 WELLBORE DIAGRAM
401982246 FORM 6 INTENT SUBMITTED
Total Attach: 4 Files
User Group Comment Comment Date
Engineer Deepest Water Well within 1 Mile – 390'
SB5 Base of Fox Hills - 307'
Added 15 sack plug at 2500'. Operator in agreement.
03/21/2019
Well File
Verification
Pass 01/22/2019
Permit Pass 01/14/2019
Total: 3 comment(s)
General Comments
Page 3 of 3Date Run: 3/22/2019 Doc [#401903944] Well Name: MCCLAY 5-4A