Loading...
HomeMy WebLinkAboutPERRIN-62N67W-TANK - Off Location Flowline - Kerr McGee - 2/27/2019State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 Off-Location Flowline FORM 44 Rev 03/18 Document Number: OGCC RECEPTION Receive Date: 02/27/2019 The Flowline Report, Form 44, shall be submitted to register, report realignment, report removal from service, or report abandonment of Off-Location Flowlines , Produced Water Transfer Systems, Domestic Taps, or Crude Oil Transfer Lines as required by the 1100 Series Rules. The Form shall also be submitted to report Grade 1 Gas Leaks from Flowlines per Rule 1104.k. 401953216 OFF LOCATION FLOWLINE FLOWLINE ENDPOINT LOCATION IDENTIFICATION Location ID:462426 Location Type:Production Facilities Name:PERRIN-62N67W-TANK Number:20SWNW County:WELD Qtr Qtr:SWNW Section:20 Township:2N Range:67W Meridian:6 Latitude:40.127368 Longitude:-104.920629 FLOWLINE FACILITY INFORMATION Flowline Facility ID:462533 Flowline Type:Production Line Action Type: OFF LOCATION FLOWLINE REGISTRATION Flowline End Point Riser Latitude:40.127364 Longitude:-104.920628 PDOP:1.2 Measurement Date:08/11/2017 Equipment at End Point Riser:Separator Flowline Start Point Location Identification Location ID:330763 Location Type:Well Site Name:PERRIN V-62N67W Number:20SWNW County:WELD Qtr Qtr:SWNW Section:20 Township:2N Range:67W Meridian:6 Latitude:40.126340 Longitude:-104.922180 Flowline Start Point Riser Latitude:40.126346 Longitude : -104.922136 PDOP:1.1 Measurement Date:08/11/2017 Equipment at Start Point Riser:Well No Location ID OGCC Operator Number: City: Company Name: Address: 47120 KERR MCGEE OIL & GAS ONSHORE LP P O BOX 173779 DENVER Zip:State:80217-3779 Contact Person:Mike Holle Phone:(720) 9296639 CO Email:mike.holle@anadarko.com Is the Operator a Tier One member of the Utility Notification Center of Colorado (UNCC) that participates in Colorado's One Call notification system?Yes No Operator Information Date Run: 2/27/2019 Doc [#401953216]Page 1 of 3 Flowline Description and Testing Type of Fluid Transferred:Pipe Material:Max Outer Diameter:(Inches) Bedding Material:Date Construction Completed:07/27/2003 Maximum Anticipated Operating Pressure (PSI):Testing PSI: Test Date: OFF LOCATION FLOWLINE REMOVAL FROM SERVICE Date: Description of Removal from Service FLOWLINE FACILITY INFORMATION Flowline Facility ID:462532 Flowline Type:Wellhead Line Action Type:Abandonment OFF LOCATION FLOWLINE REGISTRATION Flowline End Point Riser Latitude:40.127368 Longitude:-104.920629 PDOP:1.2 Measurement Date:08/11/2017 Equipment at End Point Riser:Separator Flowline Start Point Location Identification Location ID:327164 Location Type:Well Site Name:PERRIN-62N67W Number:20SENW County:WELD Qtr Qtr:SENW Section:20 Township:2N Range:67W Meridian:6 Latitude:40.126580 Longitude:-104.917880 Flowline Start Point Riser Latitude:40.126558 Longitude : -104.917891 PDOP:1.3 Measurement Date:08/11/2017 Equipment at Start Point Riser:Well Flowline Description and Testing Type of Fluid Transferred:Pipe Material:Max Outer Diameter:(Inches) Bedding Material:Date Construction Completed:10/31/1992 Maximum Anticipated Operating Pressure (PSI):Testing PSI: Test Date: OFF LOCATION FLOWLINE ABANDONMENT Date:01/04/2019 Description of Abandonment The Perrin 2-20 P&A is complete. The well head was cut and capped on 12/18/2018. The entire flow line was removed on 1/4/2019, (1,476 Feet). The entire tank battery associated to this well was removed on 1/4/2019 (this location was shared with KPK, all of equipment has now been removed) No Location ID Comments OPERATOR COMMENTS AND SUBMITTAL Date Run: 2/27/2019 Doc [#401953216]Page 2 of 3 mike.holle@anadarko.com SDA 02/27/2019 Mike Holle COGCC Approved:Director of COGCC Date: Based on the information provided herein, this Flowline Report complies with COGCC Rules and applicable orders and is hereby approved. Title: Email:Date: Print Name: Signed: I hereby certify that the statements made in this form are, to the best of my knowledge, true, correct and complete. The Perrin 2-20 P&A is complete. The well head was cut and capped on 12/18/2018. The entire flow line was removed on 1/4/2019, (1,476 Feet). The entire tank battery associated to this well was removed on 1/4/2019 (this location was shared with KPK, all of equipment has now been removed) PERRIN 2-20 05-123-14248 PERRIN #2-20 FLOWLINE Attachment Check List Att Doc Num Name Total Attach: 0 Files Date Run: 2/27/2019 Doc [#401953216]Page 3 of 3