HomeMy WebLinkAbout25-49 Construction Contract Phase 3 of Historic Waterline & Roadway Replacement Project 2 Change Order 1 05-14-2025RESOLUTION NO. 25-49
A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE,
COLORADO, APPROVING CHANGE ORDER NO. I TO THE 2025 CONSTRUCTION
CONTRACT FOR PHASE 3 OF THE HISTORIC FIRESTONE WATERLINE AND
ROADWAY REPLACEMENT PROJECT NO.2
WHEREAS, the Town of Firestone entered into a Construction Contract ("Contract") with
EZ Excavating, Inc. to serve as the contractor for the Town's Phase 3 of the Historic Firestone
Waterline and Roadway Replacement Project No. 2 (the "Project"); and
WHEREAS, in addition to the work set forth in the Contract, the Parties agree that Phase
3 of the Project will also require additional full depth pavement replacement on Third Street where
new mains are not being planned.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
Change Order No. 1 to the 2025 Construction Contract between the Town of Firestone and
EZ Excavating Inc. is approved in substantially the same forami as the copy attached hereto and
made a part of this resolution, and the Mayor is authorized to execute the Change Order on behalf
of the Town.
PASSED AND ADOPTED this 14th day of May, 2025.
COLORADO
./
Jr.,
ATTEST:
anados Luna, CMC, Town Clerk
APP AS TO FO COL
arshall Keith actin, Town Attorney
DATE: May 7, 2025
TO: Eli Betz, PE— Town of Firestone
FROM: Jason Wooldridge, PE Ditesco
Stephen Rencher, PE — Ditesco
RE: Town of Firestone Project #2 Phase 3- Historic Firestone Waterline Replacement
Project #W2024-9561
Change Order No, 01
The information shown below summarizes items to be contained within Change Order no. 01 for the above referenced
project. The change order items are summarized in the attached log with supporting documentation for each item.
Description of Changes
This change order provides an addition of Phase 9 surface restoration scope to Phase 3 as per attached
drawings. In addition to
this, 2000 LF of sidewalk replacement work has been added to the scope of this phase.
Change in Contract Amount
There is a net INCREASE to the contract of $483,340.00. See below;
Original Contract Value $1,418,712A0
Previous Change Order(s)
$0
Previous Contract Amount
$1,418,712.00
Change Order No. I Summary
Item Description Quantity
Unit Amount
1 Mobilization 1
LS $113„000.00
2 Traffic Control 1
LS $20;,000.00
3 Erosion Control Management 1
LS $10„000.00
4 Asphalt Milling (2") 2800
SY $10,500.00
5 Excavation 800
CY $15,000.00
6 Concrete Sidewalk Removal 2680
LF $33,500.00
7 Re -conditioning 2800
SY $10,640.00
8 Subgrade Stabalzation 400
SY $32,900.00
9 Aggregate Base Course 1120
TON $33,600.00
10 Concrete Sidewalk Placement 2500
LF $187,500.00
11 Reinforced Concrete Sidewalk Placement 180
LF $18,000.00
12 HMA Grading 3-7564 22 (Bottom Lift) 2800
SY $62,300.00
13 HMA Grading SX 6422 (Top lift) 2800
SY $36,400.00
Change Order 01 Total
$483,340.00
Revised contract amount (including this change order)
$1,902,052.0
Total change orders) as a percentage of original contract amount
25.41%
Change in Contract Time: There is a 0 -day INCREASE in Contract Time.
Contract Time Summary
Contract Milestone Original Contract Date
NewContract Date
Substantial Completion June 25, 2025
June 25, 2025
Total days added by change order (substantial completion):
0 calendar days
Page 1 of 1
d
R F 0
i
Full depth restoration of 2nd and 3rd t bets een
1, tooster Ave and Jackson St, partial sidevrai 818= Cu
restoration„ per attached plans
Additional Sidewalk i t rovements a€ong Berwick 175, s<
Ave
TOTALS
Original Contract rice 1,418,712.E
Current Contract Price ad usted by previous Change }rder 1,418,712, 1
Amount of this Change Order 483, .B0
New Contract Price, including this Change Order, will be: 1,902;852,80
APPROVALS:..m W .
Project tanagers Ciate:
Cradsultanf Co tractor: Late; 3
Project Engineer: t u.:. 512. 2025
l�tay+�r: w