HomeMy WebLinkAbout25-49 Construction Contract Phase 3 of Historic Waterline & Roadway Replacement Project 2 Change Order 1 05-14-2025RESOLUTION NO. 25-49 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING CHANGE ORDER NO. I TO THE 2025 CONSTRUCTION CONTRACT FOR PHASE 3 OF THE HISTORIC FIRESTONE WATERLINE AND ROADWAY REPLACEMENT PROJECT NO.2 WHEREAS, the Town of Firestone entered into a Construction Contract ("Contract") with EZ Excavating, Inc. to serve as the contractor for the Town's Phase 3 of the Historic Firestone Waterline and Roadway Replacement Project No. 2 (the "Project"); and WHEREAS, in addition to the work set forth in the Contract, the Parties agree that Phase 3 of the Project will also require additional full depth pavement replacement on Third Street where new mains are not being planned. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Change Order No. 1 to the 2025 Construction Contract between the Town of Firestone and EZ Excavating Inc. is approved in substantially the same forami as the copy attached hereto and made a part of this resolution, and the Mayor is authorized to execute the Change Order on behalf of the Town. PASSED AND ADOPTED this 14th day of May, 2025. COLORADO ./ Jr., ATTEST: anados Luna, CMC, Town Clerk APP AS TO FO COL arshall Keith actin, Town Attorney DATE: May 7, 2025 TO: Eli Betz, PE— Town of Firestone FROM: Jason Wooldridge, PE Ditesco Stephen Rencher, PE — Ditesco RE: Town of Firestone Project #2 Phase 3- Historic Firestone Waterline Replacement Project #W2024-9561 Change Order No, 01 The information shown below summarizes items to be contained within Change Order no. 01 for the above referenced project. The change order items are summarized in the attached log with supporting documentation for each item. Description of Changes This change order provides an addition of Phase 9 surface restoration scope to Phase 3 as per attached drawings. In addition to this, 2000 LF of sidewalk replacement work has been added to the scope of this phase. Change in Contract Amount There is a net INCREASE to the contract of $483,340.00. See below; Original Contract Value $1,418,712A0 Previous Change Order(s) $0 Previous Contract Amount $1,418,712.00 Change Order No. I Summary Item Description Quantity Unit Amount 1 Mobilization 1 LS $113„000.00 2 Traffic Control 1 LS $20;,000.00 3 Erosion Control Management 1 LS $10„000.00 4 Asphalt Milling (2") 2800 SY $10,500.00 5 Excavation 800 CY $15,000.00 6 Concrete Sidewalk Removal 2680 LF $33,500.00 7 Re -conditioning 2800 SY $10,640.00 8 Subgrade Stabalzation 400 SY $32,900.00 9 Aggregate Base Course 1120 TON $33,600.00 10 Concrete Sidewalk Placement 2500 LF $187,500.00 11 Reinforced Concrete Sidewalk Placement 180 LF $18,000.00 12 HMA Grading 3-7564 22 (Bottom Lift) 2800 SY $62,300.00 13 HMA Grading SX 6422 (Top lift) 2800 SY $36,400.00 Change Order 01 Total $483,340.00 Revised contract amount (including this change order) $1,902,052.0 Total change orders) as a percentage of original contract amount 25.41% Change in Contract Time: There is a 0 -day INCREASE in Contract Time. Contract Time Summary Contract Milestone Original Contract Date NewContract Date Substantial Completion June 25, 2025 June 25, 2025 Total days added by change order (substantial completion): 0 calendar days Page 1 of 1 d R F 0 i Full depth restoration of 2nd and 3rd t bets een 1, tooster Ave and Jackson St, partial sidevrai 818= Cu restoration„ per attached plans Additional Sidewalk i t rovements a€ong Berwick 175, s< Ave TOTALS Original Contract rice 1,418,712.E Current Contract Price ad usted by previous Change }rder 1,418,712, 1 Amount of this Change Order 483, .B0 New Contract Price, including this Change Order, will be: 1,902;852,80 APPROVALS:..m W . Project tanagers Ciate: Cradsultanf Co tractor: Late; 3 Project Engineer: t u.:. 512. 2025 l�tay+�r: w