HomeMy WebLinkAbout25-53 A1 Chipseal Street Mill and Overlay Contract 05-28-2025RESOLUTION NO. 25-53
A RESOLUTION OF TIIE BOARD OF TRUSTEES OF THE TOWN OF
FIRESTONE, COLORADO, APPROVING A CONSTRUCTION
CONTRACT BETWEEN THE TOWN OF FIRESTONE AND Al CHIPSEAL
PERTAINING TO STREET MILL AND OVERLAY
WHEREAS, the Town of Firestone ("Town") is in need of professional construction
services for the 2025 Street Maintenance Operations Mill and Overlay Project (the "Project"); and
WHEREAS, the Town issued an request for bid ("RFB") bids for such services for the
Project; and
WHEREAS, the Town has evaluated the bids submitted in response to the RFB, and finds
that Al Chipseal ("Al") is the responsible, responsive bidder whose bid is most advantageous to
the Town; and
WHEREAS, the Town finds that Al has the expertise, qualifications, and experience to
perform the work and duties required for the Project, and desires to select Al as the successful
bidder for the RFB and to enter into a construction contract with Al to provide the construction
services and perform the work as described in Construction Contract, attached hereto as Exhibit
A.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF
THE TOWN OF FIRESTONE, COLORADO:
Section 1. The Construction Contract between the Town of Firestone and Al Chipseal is
approved in substantially the same form as the copy attached hereto and made a part of this
resolution, and the Mayor is authorized to execute the Construction Contract on behalf of the
Town.
Section 2. The Town Manager or such person's designee is authorized to approve, sign,
execute and deliver any and all change orders on behalf of the Town as may be necessary to
complete the Project or for the Town to perform under the Contract up to and until such time as
the total dollar amount of all such change orders equals or exceeds $20,000, at which time any
such change order shall be subject to approval by the Board.
PASSED AND ADOPTED this
on Conyac t -
CI;O
os Luna, CMC, Town ClerkSEL)
APP AS TO FORM:shall Keit in, Town Attorney
WHEREAS, the Town requires services; and
WHEREAS, the Town has found the Contractor to have the expertise and experience to perform the
required services,
SCOPE
A The Contractor shall complete all Work and perform all Services described or reasonably implied
from the Scope of Work set forth in Exhibit A and the Contract Documents, attached hereto and
incorporated herein by this reference and known as 2025 Street' Maintenance Program _ Mill
and Overlay -9253),
B. A change in the Scope of Work shall not be effective unless authorized as a modification to this
Agreement or change order in accordance with the Contract Documents. If the Contractor
proceeds without such written authorization, the Contractor shah be deemed to have waived any
claim for additional compensation, including a claim based on the theory of unjust enrichment,
quantum merit or implied contract Except as expressly provided herein, no agent, employee, or
representative of the Town is authorized to modify any term of this Agreement, either directly or
implied by a course of action;,
C. Within ten days of the Effective Contract Date, the Contractor shall provide the performance
bond, labor & material payment bond, and certificate of insurance required by the Contract
Documents.
•
Page I of
der
FIRESTONE
- a'Ei.
. *. * _ .1IiII * *1ILII4 . * I w III 1!.
wills
* * I` * * * * *.
*• *.* * * • * * * `$
I
- II ''"" _____________ _____
* * I •
t OUORA 0..
iii � • • .� ,. - � ��r - � �. .. ,�
r i i i i i i • *i.
i . i . . i i' -' •IIiI1k. i 'S i -i i.
• i i' . r i • $ LII IIU4 i i .. t. i i . . • i
t, I - • tII4____
i i i. i- i . i • . !` at •_IIiIarII i i..
i- - i' ! 't
i I . i - i - . i - i' i .i. i i- i i
it i i . 1 .i i a . ii" •
i i i - . #i
i R' 4, i $* II i i'i. . ' i ii .i.4 tf111 . i i"
i k i Sf 1aIIIID - i S1 # i ♦ i
i i i i"' ! ! • i i • i
�� � � • -� � � r � ,. �► Nor
IX. INSURANCE
A. Contractor agrees to procure and maintain, at its own cost, a policy or policies of insurance sufficient
to insure against all liability, claims, demands, and other obligations assumed by Contractor
pursuant to this Construction Contract. At a mmnimum, Contractor shall procure and maintain, and
shall cause any subcontractor td procure and maintain, the insurance coverages listed below, with
forms and insurers acceptable to the Town.
1. Workers Compensation insurance as required by law,
Page 3 of
FIRESTONE
a »® a r *a a* a III III
a - , iii $44 a» - . ra *a»,. » as » »aa :a - a
a * *5* » a * a* a- »a aaa as a s a a»
a» »a» * a a a a s a »» a as » r»
a » sat a a a- a a •s -as a • a
a • a» _ a r a a » as " *5
a ass a aa - a» •a, » a a » »a aa» r
• » a- •aa a a . a ». » » as *a a
a » » , aa*a a» » as » a a •a » a » r*
a •-. i a. a - a * a - a * * » .r- as
M r r,.. a - a -a »rr a - as . a- a a - a »
a a ,®» A »» .a a a a» a »» a
• a .. _ » a s a a a a a -a a a s
a » a • a- a- a .a » a. a- r- a as
a • • a - a - • -a » » » a» » » a » as
a» a a -* • a.. aIri1Ta1k9itITraa a • a a
r »a. a* - r - » a a a a •* * »- a» a a a a
s . a • » a aaa a* a» ;
as a a a. tea» a a a a» a a
a * a » »r a a a . a a r»
a a* a a. a a + a a» a •s a a*
a a» a; - a a •. a a a •» a •a
a a s •- a a- a- jf
a s » a a»
* Y
a - at a • a- as r a a a a
M'a•= * a -» a * » a a -a a a *»r- » as ,
administered by the Colorado f eparttrnent of Labor and Employment to confirm the employment eligibility of
all employees who are newly hired to perform Work under this Construction Contract✓
Prohibited Acts. The Contractor shall not knowingly employ or contract with a worker without
authorization, as that term is defined in C.R.S §&17. -1u1 ), as amended, to perform Work under this
Construction Contract, or enter into a contract with a subcontractor that fails to certify to Contractor that the
subcontractor shall not knowingly employ or contract with a worker without authorizationn, as that term is
defined in CRS § 8-17,5-101( ) as amended, to perform Wok under this Construction Contract;
Verification
1. If the Contractor has employees, the Contractor has confirmed the employment eligibility of
all ernployees who are newly hired to perform Work under this Construction Contract through
participation in either the EVerify Program or the Department Program.
Contractor shall not use the E -Verify Program or Department Program procedures to
undertake pre- employment screening of job applicants while this Construction Contract is being
performed.
a If the Contractor obtains actual knowledge that a subcontractor performing Work under this
Construction Contract knowingly employs or contracts with a worker without authorization, as that
term is defined in CRS § 8175®1011 j, as amended, who is performing Work under this
Construction Contract, Contractor shall: notify the subcontractor and the Town within 3 days that
Contractor has actual knowledge that the subcontractos employing or contracting with a worker
without authorization, as that term is defined in C R S § 8-417.5-101(9), as amended, who is
performing Work under this Construction Contract; and terminate the subcontract with the
subcontractor if within 3days of receiwrng the notice required pursuant to subsection 3 hereof, the
subcontractor does not stop employing or contracting with the worker without authorization who is
performing Work under this Construction Contract; except that Contractor shall not terminate the
subcontract if during such 3 days the subcontractor provides information to establish that the
subcontractor has not knowingly employed or contracted with a worker without authorization, as that
term is defined in C, M C.R.S. § 817.5 101(8) as amended, who is performing Work under this
Construction Contract;
Duty to Comjlrith Inwestigtion. The con tractorsh.11 comply with any reasonable request
by the Colorado Depart rent of Labor and EmpluynrEmployment made in the course of an investigation
conducted pursuant to C:P. § 817,5-102(5)t ) to ensure that the Contractor is complying with the
terms of this Section
XII.CONTRACT
°age50r8
FIRESTONE
B. Performance Bond and Labor & Material Payment Bond.
Notice of Award.
D. Notice to Proceed,
F. Substantial Completion,
F. "Specifications" bearing the title. 0esi n standards & Construction S cifcations for Pubhc
Improvements 2022 Fdon
G. Drawings '" consisting of A
H. Addendum numbers:
1. Addendum #1: ..
pp _ s •
r
XII. CHANGE
A. A Change Order is a written instrument issued after execution of the Agreement signed by Town
and Contractor, stating their Agreement, as applicable, upon all of the following:
1. The scope of the change in the Work;
2. The amount of the adjustment to the Contract Price-, and
3. The extent of the adjustment to the Contract Times(s).
B. All changes in the Work authorized by applicable Change Order shall be performed under the
applicable conditions of the Contract Documents, Town and Contractor shall negotiate in good faith
an
C. d as expeditiously as possible the appropriate adjustment such changes.
Page f8
FIRESTONE
COLOK0O
XIV. MfSCELLANEOUS
* * * .** . * . '4, 9 *' ' * * * ''8 * * * * 'I *
** *
*9 * * * * *
" * * * * . . * w' ' . * * ' I --
I' .' '* ! 8, * * .' * * *
r ' * * I* 1*. *' * * * * *
* 4, *' * * * .4' * * * *.' '*,
*` * * '* * ' *w * • * aM' 48'
''.8 8* * * * 4 r * 4* * * * 8''
* * * *' * '.*' * . '. i . * * * * '* *.
4, '4 ..4 * ' * .4' *1" * ` 48 .
** * • '4 ' * * ' : • *4 II I' * * ' . .9 1.
* I- *" *4* • 8*_** 4'
® .1* * '* II * *' *
.4 *' I, * * * • 8' * * * * * . ' * . * * * *:
* . . * * ! * '* .*' *' * '8 **
* *i .
Y
II
tIlli,,Vkiiurp
.
COUNTY 9 ,
YowN
(sEAL
AlC
By:
(SEAL)
Pubhc
LJJ
Page 8of8
FIRESTINE
UNITPRtCE BD FORM
2025 tr Maintenance Program ill & Overay
(S2025-9253)...
thitlitt
met li
y
Ti :,
tt p
Mobilization
1,0
Ea I Lump Sure
I/LS
5000.00
5,000 00
Traffic Control
i.o
Ea, / Lump Sum
8L5...
_.. 9,5O0.
,5 .00
Restoration Stormwater MP
Compliance
1.0
Ea. I Lump Sum
ilLS
50000
500.00 j
Oak MeadoBLVD (With .M d en) 400 LF / .08 Mites
Between Colorado Blvd and Deerfield Dr.
item:Descriptiono
Quantity
Nasutement1f0t4
Verified
Quantityrti::
opt
Asphalt Patching ' F Full Depth
000.0
SF
1? ,..
1 15.0030,000.00
Milting/2" Depth Profile Mliii
1,695.0
SqYds
isss,sy
1 4.257,203.75
{rhalt f " Paving (Sor S)
1,695.0
SqYds
1 Y
16.50
27,9 7.50
4°' White w Epoxy Line Striping - Solid
780.0
LF
780/LF
2.22
1,731.80
4"Yellow-Epoxy Line Striping-Solid
410.0
LF
1 L
910.20
S"' White - Epoxy Line Striping - Solid
80.0
LF
80/LF
. 4
355.20
Left Turn Arrow - Preformed
Thermoplastic Pavement arkir�
2.0
Each
-.
500.00
, 4
ONLY'- Preformed Thermoplastic
Pavement Markings.
1.0
Each
Stop Bar (2' X LF- Length) - Preformed
Thermoplastic Pavement Markings
S.ti
LF
26/LF
5.00
130.0+
Norm
Company Nate= A«1 1 l
ailing Addr� 2505 .740, Ave. Denver, 80229
«ar« * « . .
bated tli day f April, 2425,
Page of
0L 0FIHES7ONEX 00'