25-67 Approving Change Order No. 1 A1 Chipseal Street Resurfacing Project 06-11-2025
Item Description Quantity Unit of Measurement UOM Unit Price Extended Cost Mobilization 1.0 Ea. / Lump Sum $ - $ - Traffic Control (ALL LOCATIONS) 1.0 Ea. / Lump Sum $ 16,500.00 $ 16,500.00 Restoration / Stormwater BMP Compliance (ALL LOCATIONS) 1.0 Ea. / Lump Sum $ 250.00 $ 250.00 $ 16,750.00 Sable Ave (CR 22) / ~ 1.0 mi.NOTES: Item Description Quantity Unit of Measurement UOM Unit Price Extended Cost Subgrade/Over-Ex in as part of Full depth patching (Included in R&R) Asphalt Patching - 4' Mill Patch 13,000.0 SF $ 4.05 $ 52,650.00 Remove Concrete replace with Asphalt around Valves and Manholes that need adjustment otherwise leave in place. Asphalt Patching - 8" Full Depth 5,000.0 SF $ 13.50 $ 67,500.00 NEED TO CONTACT CWCWD (Valves) and SVSD (Manholes) Crack sealant 4,000.0 Lbs. $ 2.10 $ 8,400.00 Project to include Street Sweeping adjacent roadway into neighborhoods. 3/8" Chip Seal w/ Fog Seal 26,870.0 SqYds $ 3.95 $ 106,136.50 Milling at Needed driveway for seamless access 4" White - Epoxy Line Striping - Solid 10,475.0 LF $ 0.55 $ 5,761.25 Valve and Manhole Adjustments included in as part of project 4" Yellow - Epoxy Line Striping - Solid 18,000.0 LF $ 0.55 $ 9,900.00 8" White - Epoxy Line Striping - Solid 1,900.0 LF $ 1.10 $ 2,090.00 Left Turn Arrow - Preformed Thermoplastic Pavement Markings 9.0 Each $ 375.00 $ 3,375.00 Right Turn Arrow - Preformed Thermoplastic Pavement Markings 4.0 Each $ 375.00 $ 1,500.00 Combination Rht/Strt/Turn Arrow - Preformed Thermoplastic Pavement Markings 2.0 Each $ 475.00 $ 950.00 ONLY - Preformed Thermoplastic Pavement Markings 8.0 Each $ 400.00 $ 3,200.00 Stop Bar (2' X LF - Length) - Preformed Thermoplastic Pavement Markings 28.0 LF $ 40.00 $ 1,120.00 Crosswalk Bars (2' X 9') - Preformed Thermoplastic Pavement Markings 12.0 Each $ 275.00 $ 3,300.00 $ 265,882.75 Pine Cone Ave (CR 20) / ~ 1.9 mi. Item Description Quantity Unit of Measurement UOM Unit Price Extended Cost Asphalt Patching - 4' Mill Patch 2,500.0 SF $ 4.05 $ 10,125.00 Asphalt Patching - 8" Full Depth 1,500.0 SF $ 13.50 $ 20,250.00 Crack sealant 4,000.0 Lbs. $ 2.10 $ 8,400.00 3/8" Chip Seal w/ Fog Seal 34,207.0 SyYds $ 3.95 $ 135,117.65 4" White - Epoxy Line Striping - Solid 20,295.0 LF $ 0.55 $ 11,162.25 4" Yellow - Epoxy Line Striping - Solid 21,100.0 LF $ 0.55 $ 11,605.00 4" Yellow - Epoxy Line Striping - Skip 2,484.0 LF $ 0.55 $ 1,366.20 8" White - Epoxy Line Striping 1,990.0 LF $ 1.10 $ 2,189.00 Left Turn Arrow - Preformed Thermoplastic Pavement Markings 10.0 Each $ 375.00 $ 3,750.00 Right Turn Arrow - Preformed Thermoplastic Pavement Markings 4.0 Each $ 375.00 $ 1,500.00 Combination Strt/Turn Arrow - Preformed Thermoplastic Pavement Markings 1.0 Each $ 475.00 $ 475.00 ONLY - Preformed Thermoplastic Pavement Markings 6.0 Each $ 400.00 $ 2,400.00 Stop Bar (2' X LF) - Preformed Thermoplastic Pavement Markings 30.0 Each $ 40.00 $ 1,200.00 Crosswalk Bars (2'X6') - Preformed Thermoplastic Pavement Markings 9.0 Each $ 275.00 $ 2,475.00 $ 212,015.10 Item Description Quantity Unit of Measurement UOM Unit Price Extended Cost Mobilization 1.0 Ea. / Lump Sum $ - -$ Traffic Control 1.0 Ea. / Lump Sum $ 7,000.00 7,000.00$ Restoration / Stormwater BMP Compliance (ALL LOCATIONS) 1.0 Ea. / Lump Sum $ 250.00 250.00$ 7,250.00$ CR 26 (east of Colorado Blvd Item Description Quantity Unit of Measurement UOM Unit Price Extended Cost Asphalt Patching - 2" Depth Profile Mill 800.0 SqYds $ 4.25 $ 3,400.00 Asphalt Patching - 2" Paving (S or SX) 800.0 SqYds $ 16.50 $ 13,200.00 Asphalt Patching - 8" Full Depth 1,000.0 SF $ 15.00 $ 15,000.00 4" White - Epoxy Line Striping - Solid 450.0 LF $ 2.22 $ 999.00 4" Yellow - Epoxy Line Striping - Solid 450.0 LF $ 2.22 $ 999.00 $ 33,598.00 Firestone Blvd At Frontage Road (CR 9.5) Aspahlt/Concrete Transition Item Description Quantity Unit of Measurement UOM Unit Price Extended Cost Asphalt Patching - 2" Depth Profile Mill 415.0 SqYds $ 4.25 $ 1,763.75 Asphalt Patching - 2" Paving (S or SX) 415.0 SqYds $ 16.50 $ 6,847.50 Asphalt Patching - 8" Full Depth 250.0 SF $ 15.00 $ 3,750.00 4" Yellow - Epoxy Line Striping - Solid 10.0 LF $ 2.22 $ 22.20 8" White - Epoxy Line Striping - Solid 10.0 LF $ 4.44 $ 44.40 12,427.85$ Estimated Total Cost - Resurfacing Additions 494,647.85$ Estimated Total Cost - Mill & Overlay Additions 53,275.85$ ADDITIONS - Combined 547,923.70$ Original Bid - Resurfacing 84,854.25$ Original Bid - Mill & Overlay 977,277.15$ Original Bid - Combined 1,062,131.40$ All Combined (Whole Job)1,610,055.10$ T-Patch - 2 areas - One Westbound and One Eastbound at transition Town of Firestone 2025 SMP - Resurfacing (additions) Birch Ave to Colorado Blvd Colorado Blvd (CR 13) to Frontier (CR 15) East End of Maintenance Town of Firestone 2025 SMP - Mill & Overlay (additions)