Loading...
HomeMy WebLinkAbout25-72 Design Standard & Construction Specifications Public Improvements 2025 Edition 07-09-2025RESOL1TTION NO. 2572 A RESOLUTION OF THE HOARY) OF TRUSTEES F THE TOWN OF FIRESTONE, COLORADO, ADOPTING THE TOWN OF FIRESTONE DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS FOR PUBLIC IMPROVEMENTS 2025 EDITION WHEREAS, the "Ion of firestone ("`fo n„) BoardofTrustees ('Board") first adopted the Town Design Criteria and Construction Specifications for Public Improvements (Standards and Specifications") back in 2020 and, since then, has adopted updated Standards and Specifications in 2022: and WHEREAS, over the last several years there have been multiple updates regarding industry standards, materials, and construction practices, and WHEREAS, it is, thus, essential that the Town update its Standards and Specifications to ensure that Toupin- owned public improvrements,. which include, for example, roadvays, curbs, gutters and sidewalks, v ater, sanitary sesser, and storm drainage systems, and traffic signal improvements, are designed, constructed, operated and maintained in a manner that both provides high -quality facilities and ensures public safety. NOW, THEREFORE BE IT RESOLVED BY THE TI ARA OF TRUSTEES OF THE 'IOWN OF FIRESTONE, COLORADO: The Iow n of Firestone Design Standards and Construction Specifications for Public Improvements, 2025 Edition, is approved in substantially the same form as the copy attached hereto and made a part of this resolution. The Mayor is authorized to execute same on behalf of the Tovyn, PASSED SED AND ADOI'"TET)' this Ia ° of Jb 2025. z 0 IST Q NE, COO OI AD )nya r. r ATTEST: ur t rig 'a Ciranados Deana:. ('MC, I ossn Clerk .; ........� APP tS Is shall Keith actin, 'f oven Attorney'