HomeMy WebLinkAboutPC 25-10 Recommending Approval of an Application to Amend the Del Camino Junction PUD 09-18-2025FIRESTONE PLANNING AND ZONING COMMISSION
RESOLUTION NO. PC 25-10
A RESOLUTION OF THE PLANNING AND ZONING COMMISSION OF THE TOWN
OF FIRESTONE, COLORADO, RECOMMENDING APPROVAL OF AN APPLICATION
TO AMEND THE DEL CAMINO JUNCTION BUSINESS PARK PUD FINAL
DEVELOPMENT PLAN
WHEREAS, indigo Auto Group, (the "Applicant"), on behalf of Aleaska Holding Co LLC,
the owner of certain real property located within the Town of Firestone, Colorado (the "Property"),
has submitted an application to amend the existing Del Camino Business Park PUD Final
Development Plan (the "Original PUD") as it relates to the areas of the Original PUD platted as Lots
1 & 2, Block 1, Del Camino Junction Business Park P.U.D., and Lot 3, Del Camino Junction Business
Park Fourth Minor Plat; and
WHEREAS, after a duly -noticed public hearing, at which evidence and testimony were
entered into the record, the Planning and Zoning Commission finds and determines that the
Application is complete, and that the Applicant has met the applicable requirements and standards set
forth in the Firestone Municipal Code and Firestone Development Code; and
WHEREAS, the Planning and Zoning Commission wishes to make a recommendation to the
Board of Trustees regarding the Application.
NOW, THEREFORE, BE IT RESOLVED BY THE PLANNING AND ZONING
COMMISSION OF THE TOWN OF FIRESTONE, COLORADO:
Section 1. The Planning and Zoning Commission hereby recommends approval of the
proposed PUD Amendment, attached hereto as Exhibit A and incorporated herein by this reference,
subject to and contingent upon compliance with the following conditions:
1. All remaining technical corrections to the Del Camino Junction Business Park P.U.D.
Amendment requested by Town staff shall be made to the Town staff's satisfaction.
PASSED AND ADOPTED this 16#d—ay of &PW42025.
JAST-
Missy Carranco, Deputy Town Clerk
,tolllllp;� rperson
TOE c r
r
EAL
0104 tiN6G```•
EXHIBIT A
DEL CAMINO JUNCTION BUSINESS PARK P.U.D. AMENDMENT
[See following pages]
U) Z
a' 0
grin —
Ow
0 N
Z
7o
Z
O
OO'3NO1S3HW'ON 30V1NONd SZ-1 MN 310tlIOYWd S53NI5(IB
0
1N3WaN3WV'0'(1'd�
o o .
3HOSbOd 3NOlS3M=l
0.
Z
o
Q
0
Y
�
E
�
=so
o�
_
�
g
M
4 R
g R
pin
a%-e
w ;8�
Y AB NMtltlO
?' Al AB U3vJ3HJ
Tz g �� Z
0
a --pp F w
L � 00'3NO1S3N1�'Otl 30tl1NOLLi SZ-I @1V 310tl10 MtlVd SS3NIS/IB rc � � W O 0
o - 1N3W4N3WV'G n*d W s� O
OLU o 3HOSbOd 3NO1SM]IJ ozol
w'o
F
jl
Z
4
as
o
39
a
&
s
�
8
�
8
u
0
Y s
s
8mh
Elig
7
HIH
i �
I
- a
SO
a
lz
0
s
i AB WAWO
�f Al AB QjMy]I�
--00000 - —0*0— - 4>*Vft�*
FIRESTONE
Staff Report
Del Camino Junction Business Park
Planned Unit Development Amendment (PUDA)
PUDA-25-025
September 18, 2025
Prepared by the Town of Firestone for the Planning and Zoning Commission
GENERAL INFORMATION
Purpose:
This staff report is for the Del Camino Junction Business Park Planned Unit Development
Amendment (PUDA), which is a proposed amendment to the Del Camino Junction
Business Park P.U.D.
Applicant:
IndiGo Auto Group
13911 North Fwy
Houston, TX 77090
Owners' Representative:
Norris Design
1101 Bannock St.
Denver, CO 80204
Location:
The subject property is located on the southeast corner of the intersection of County Road
24 '/2 (Arbor Street) and 1-25 East Frontage Road.
! Vil
VAL
Non
1
r
Existing Zoning:
Mixed -zoning PUD, which includes Neighborhood Center (NC) and Employment Center
(EC).
Del Camino Junction Business Park PUD Amendment
Staff Report
Existing Use:
Vacant, undeveloped land
Adjacent Land Use/Zoning:
ZONING
LAND USE
NORTH
Weld County Agricultural Zone District
Weld County Southwest Service
Complex
SOUTH
Neighborhood Center (NC) and
Employment Center (EC)
Business Park & Hotels
EAST
High -Density Residential (R-C)
Gateway North Apartments
WEST
Open Space (OS)
St. Vrain State Park
Del Camino Junction Business Park PUD History
The Del Camino Junction Business Park PUD was approved by the Board of Trustees of
the Town of Firestone through Ordinance No. 427 on October 14, 1999, which
implemented zoning districts PUD-EC (Employment Center) and PUD-RC (Regional
Commercial).
Since the PUD was approved, much of the Del Camino Junction Business Park has been
developed. The uses are a mixture of commercial and office, including eating
establishments, hotels, and medical and professional offices. The subject property is one
of the few remaining undeveloped parcels. The proposed development is for a Porsche
dealership.
Del Camino Junction Business Park PUD Amendment Analysis
This Firestone Del Camino Junction Business Park PUDA (Planned Unit Development
Amendment) carries over the standards of the Original PUD and includes new standards
to accommodate the uniqueness of the proposed development while maintaining the high -
quality construction and uses associated with the area. Some of the areas addressed
include:
• Updated underlying zoning districts to align with the current Firestone
Development Code (FDC). The designation Employment Center (EC) from the
previous development regulations is now in the Light Industrial (LI) zoning district
of the current Firestone Development Code (FDC).
• The PUD amendment proposes to allow both "Vehicle Service and Repair, Light"
and "Vehicle Sales and Rental" to be permitted uses without restrictions on the
proximity to the interstate.
• The amendment proposes modifications to the FDC standards for Building
Orientation, to allow the garage bay doors to face a roadway on the Primary
Structure, and dimensional standards such as Building Mass on the Secondary
Structure.
• Proposed changes to architectural standards, including permitted Building
Materials, to allow the use of high -quality Aluminum Composite Material (ACM)
Panels and Standing Seam Metal (SSM) Panels on both structures.
Del Camino Junction Business Park PUD Amendment
Staff Report
• Wall Articulation deviation for the Secondary Building is proposed to be every 40'
to 65' instead of the 40' minimum distance stated in the FDC.
• Proposed signage standards changes include an increase in height of the single
freestanding sign from 10' to 35' and the maximum sign area from 32 square feet
to 70 square feet.
APPROVAL CRITERIA AND STAFF ANALYSIS
Rezoning Approval Criteria and Staff Analysis:
This Planned Unit Development Amendment application (PUDA-25-15) was reviewed for
compliance with the Approval Criteria from Section 16.7.4. E.3 of the FDC. Staff makes the
following findings:
A. The proposed zoning promotes the health, safety, or welfare of the
inhabitants of the Town and the purposes of this FDC.
Staff Response: The modifications proposed promote the health, safety, and
welfare of the inhabitants of the Town and the purpose of the FDC.
B. The proposed zoning is generally consistent with the Town's
Comprehensive Master Plan, or the proposed zoning is necessary to
provide land for a community need that was not anticipated at the time of
the adoption of the Town's plan.
Staff Response: The proposed modifications are generally consistent with the
Town's Master Plan. The Master Plan Map indicates the land use designation for
this property is commercial/office. The PUDA is generally consistent with the
commercial/office land use designations as identified in the Town's Master Plan.
C. Adequate facilities and services (including street and transportation,
water, gas, electric, police and fire protection, and sewage and waste
disposal, as applicable) will be available to serve the subject property while
maintaining adequate levels of service to existing development.
Staff Response: Adequate facilities and services will be provided to serve the
subject property and maintain adequate levels of service to existing
development. During development, all referral reviews will be conducted to
ensure compliance.
D. The proposed zoning is not likely to result in significant adverse impacts
upon the natural environment, including air, water, noise, stormwater
management, wildlife, and vegetation, or such impacts will be substantially
mitigated.
Staff Response: The proposed modifications are not likely to result in significant
adverse impacts on the natural environment. The zoning aspect of this
amendment is acknowledged through the current FDC, which states that uses in
EC (Employment Center) are consistent with those uses allowed in the LI (Light
Industrial) zoning district.
E. The proposed zoning is not likely to result in significant adverse impacts
upon other property in the vicinity of the subject property.
Del Camino Junction Business Park PUD Amendment
Staff Report
Staff Response: The proposed modifications are unlikely to result in significant
adverse impacts on other properties in the vicinity of this property, as they will
allow for development consistent with existing commercial uses in the area.
F. Future uses on the subject property will be compatible in scale with uses
on other properties in the vicinity of the subject property.
Staff Response: The proposed uses will be compatible in scale with uses on
other properties in the vicinity of the subject property.
G. The proposed zoning is generally consistent with the Town's economic
development goals and objectives in bringing positive growth and
sustainable revenues to the Town.
Staff Response: The proposed modifications are generally consistent with the
Town's economic development goals and objectives in bringing positive growth
via residential lots and limited commercial development to the Town.
PUD District Approval Criteria and Staff Analysis:
This Planned Unit Development Amendment application (PUDA-25-15) was reviewed for
compliance with the Approval Criteria from Section 16.7.5.13.4 of the FDC. Staff makes the
following findings:
A. The PUD district zoning is generally consistent with the purpose of the PUD
zone district as set forth in FDC Subsection 2.4.E.
Staff Response: The PUD is generally consistent with the purpose of the PUD
zone district as outlined in FDC subsection 2A.E.
B. The PUD district and the PUD district plan comply with all applicable
standards and criteria stated in Section 7.5.
Staff Response: The PUD complies with all applicable standards and criteria
from Section 7.5.
C. The development proposed on the subject property is not feasible under
any other zone districts, and would require an unreasonable number of
variances or waivers and conditions.
Staff Response: The proposed development cannot be accomplished with any
single existing Zoning District established in the FDC. Without the proposed
PUDA, the site would continue to have an outdated zoning designation.
Specifically, the proposed use could not be permitted by any other means, as
the Town does not permit Variances of Use.
D. The PUD district and the PUD district plan establish permitted uses that
are compatible with existing land uses adjacent to the subject property.
Staff Response: The proposed PUD district plan establishes permitted uses that
are compatible with the existing land uses adjacent to the subject property.
E. The proposed zoning is not likely to result in significant adverse impacts
upon other property in the vicinity of the subject property.
Staff Response: The proposed modifications are unlikely to result in significant
adverse impacts on other properties in the vicinity of this property, as they will
allow for development consistent with existing commercial development in the
area.
Del Camino Junction Business Park PUD Amendment
Staff Report
Del Camino Junction Business Park PUD Amendment
Staff Report
PUBLIC NOTICE
Notice of the Public Hearings has been provided as follows:
Published in the Longmont Times Call: September 3, 2025
Signs Posted on the Property: September 2, 2025
Letters to Adjacent Property Owners: September 2, 2025
RECOMMENDATIONS
Town staff recommends that the Planning and Zoning Commission approve draft
Resolution PC-25-10, a resolution recommending approval of the Del Camino Junction
Business Park Planned Unit Development Amendment application to the Board of
Trustees with the following condition:
a. All remaining technical corrections to the Del Camino Junction Business
Park P.U.D. Amendment requested by Town staff shall be made to the
Town staffs satisfaction.
Del Camino Junction Business Park PUD Amendment
Staff Report
NORRIS
DESIGN
August 27, 2025
Rachel Clyne
Town of Firestone, Planning Division
9950 Park Avenue
Firestone, CO 80504
RE: PORSCHE FIRESTONE PUD REZONE
Dear Ms. Clyne and Staff:
On behalf of indiGo Auto Group, we are pleased to submit this narrative and associated documents for the
Porsche Firestone PUD Amendment (Rezone) applications for the site located at the southeast corner of
County Road 24 i/2 (Arbor Street) and E. 1-25 Frontage Road. The following narrative and associated
documents have been updated based on our multiple conversations with Staff on August 2111 and August
25" of 2025.
This following team has been assembled:
Applicant
indiGo Auto Group
13911 North Fwy
Houston, TX 77090
832-748-0200
Contact: Dustin Carr
Architect
PGAL
7951 E. Maplewood Avenue, Suite 105
Greenwood Village, CO 80111
720-216-9600
Contact: Scott Buehler / Cris Ruebush
Planner/ Landscape Architect
Norris Design
1101 Bannock St.
Denver, CO 80204
303-892-1166
Contact: Leanne Vielehr/Jared Carlon
Civil Engineer
Martin / Martin
12499 W/ Colfax Ave.
Lakewood, CO 80215
303-431-6100
Contact: Peter S. Buckley
The following items have been included with this resubmittal:
1. Narrative
2. PUD Document
3. Response to Planning PUD Comments
4. Response to Town Attorney PUD Comments
Please feel free to reach out if you have any questions or additional requests for information. I can be
reached via phone at 303-892-1166 or by email at Ivielehr(cbnorris-design.com. We look forward to working
with staff and the Town of Firestone to make this project a success.
Sincerely,
Leanne Vielehr
L'e&tl is U'���� L1�
Norris Design
Principal
NORRIS
DESIGN
PROJECT BACKGROUND
The site is approximately 7.9-acres and is located near the northeast corner of Business Park Circle and the
1-25 Frontage Road. The property is within the northernmost portion of the Del Camino Junction Business
Park, which is generally located between Weld County Road 24'/z on the north, Firestone Boulevard on the
south, and the 1-25 Frontage Road on the west. Specifically, the property is comprised of Lot 1 and 2, Block 1
of the Del Camino Junction Business Park P.U.D. and Lot 3 of the Del Camino Junction Business Park Fourth
Minor Plat.
The overall Del Camino Junction Business Park has developed with a mixture of commercial and office uses,
including several fast-food restaurants, hotels, and medical and professional offices. The property is one of
the few undeveloped parcels remaining. IndiGo Auto Group proposes to develop the property as a new
Porsche dealership.
The property is zoned PUD and all allowed uses follow former Town Zoning Code found in the Employment
Center and Regional Commercial (EC and RC) Zone Districts. The zone district classifications of Employment
Center (EC) from former Town Zoning Code and development regulations are intended to be included in the
Lighting Industrial (LI) zone district. Vehicle Service and Repair Light is a permitted use in NC, RC, and LI
with restriction on proximity to the Interstate, while Vehicle Sales and Rental is a Special Review Use in LI.
The PUD Amendment (rezoning) proposes to allow both Vehicle Sales and Rentals and Vehicle Service and
Repair Light to be permitted uses without restrictions on the proximity to the Interstate.
The PUD Amendment is proposing a handful of code modification to address land use standards,
dimensional standards, architectural standards and signage standards.
INDIGO AUTO GROUP
indiGO Auto Group is a premier luxury automotive retailer, renowned for offering unparalleled experience
with the world's most coveted brands, including Porsche, Rolls-Royce, Bentley, Lamborghini, McLaren,
Aston Martin, and Ferrari. With an emphasis on sophistication and exclusivity, indiGO creates a boutique
atmosphere within its state-of-the-art showrooms, where personalized service is the hallmark.
More than just a dealership, indiGO caters to discerning enthusiasts, offering not only a curated selection of
new and pre -owned vehicles but also bespoke automotive experiences. From exclusive events and track
days to the acquisition of rare and limited -edition models, indiGO Auto Group delivers a lifestyle of
refinement and elegance. Operating in some of the most distinguished markets across the U.S., indiGO is
synonymous with luxury, community engagement, and the art of motoring excellence.
SITE PLANNING
The proposed site plan will include a Porsche dealership, areas for vehicle displays and storage, including
enclosed storage, and other ancillary surface parking. The main building will include a showroom to facilitate
vehicle sales, sales team offices, and vehicle maintenance facilities. A secondary, Pre -Engineered Metal
Building (PEMB), will be used for covered parking and future vehicular service expansion area. The primary
and secondary vehicular entrances to the property will be located off Business Park Circle. Both entrances
are anticipated to have a lockable gate for after -hour security.
There are three plugged and abandoned (P&A) oil wells on the site. All proposed buildings will maintain a
50-foot setback to the P&A well. The applicant is aware of the remediation taking place on site and will work
with the oil and gas operator and City staff to ensure construction is possible.
NORRIS
DESIGN
ARCHITECTURE
The architectural style of the building is proposed to follow the Porsche brand and will be a modern style,
using a sleek, monochromatic color palette with a red accent color. The primary building will feature a
combination of aluminum composite material (ACM) panels and standing seam metal (SSM) panels as
exterior cladding. Glazing will also be incorporated throughout. 4 high-speed rolling overhead doors will
face the west facade and will be positioned within a covered service bay. These doors will be recessed
roughly 30 feet from the western facade. All other service bays and overhead doors will be oriented toward
the interior of the site in order to minimize street visibility. The dealership building will be similar to the
building built in Little Rock, Arkansas, and building imagery has been included below to show similar design
and style intent for the proposed building in Firestone.
The PEMB building will use wall articulation to break up the appearance of a singular, uniform mass.