HomeMy WebLinkAboutFacility 485466 - Flowline Abandonment Notice - Crestone - 7/10/2025State of Colorado
Energy & Carbon Management Commission
1120 Lincoln Street, Suite 801, Denver, Colorado 80203
Phone: (303) 894-2100 Fax: (303) 894-2109
Flowline System
FORM
44
Rev
02/20
Document Number:
ECMC RECEPTION
Receive Date:
07/10/2025
The Flowline Report, Form 44, shall be submitted to register, report realignment, report removal from service, provide pre-
abandonment notices, or report abandonment of Off-Location Flowlines, Flowline Systems, Produced Water Transfer Systems, or
Crude Oil Transfer Lines or Systems as required by the 1100 Series Rules. The Form 44 shall also be submitted to register, report
realignment, or report abandonment of Domestic Taps, and to report Grade 1 Gas Leaks from Flowlines per Rules 610 and 906.
404237013
FLOWLINE DESCRIPTION AND TESTING
Type of Fluid
Transfered:
Multiphase
Pipe Material:Carbon Steel
Max outer Diameter
(inches):
2.000
Bedding
Material:
Native Materials
Date Construction
Completed:
07/18/2015
Max Anticipated Operating
PSI:
Testing
Pressure:
125 Test Date:03/06/2023
Description of Corrosion Protection:
Crestone pipelines are covered in a protective external coating. Flowlines are subject to thorough inspections and
fabrication standards during installation to minimize coating and pipe defects. Crestone maintains a chemical program
to reduce internal corrosion. If a flowline is found to lack integrity, Crestone will investigate, report, and remediate any
spills in accordance with the 900 series rules.
Description of Integrity Management Program:
125
FLOWLINE SYSTEM
FLOWLINE SYSTEM IDENTIFICATION
Facility ID Number:485466 Flowline System
Name:
CPR Flowline
FLOWLINE SYSTEM REGISTRATION
A representative legal location and associated latitude and longitude near the center of the Flowline
System.
County:WELD
Qtr Qtr:SENE Section:9 Township:2N Range:67W Meridian:6
Latitude:40.154619 Longitude:-104.892886
GPS Quality Value:Type of GPS Quality Value:Measurement Date:03/10/1978
ECMC Operator Number:
City:
Company Name:
Address:
10633
CRESTONE PEAK RESOURCES OPERATING LLC
555 17TH STREET SUITE 3700
DENVER Zip:State:80202
Contact Person:Fred Kayser
Phone:(970) 396-4900
CO
Email:fkayser@civiresources.com
Is the Operator a Tier One member of the Utility Notification Center of Colorado (CO811) that participates in Colorado's
One Call notification system?Yes No
Operator Information
Date Run: 7/10/2025 Doc [#404237013]Page 1 of 4
Crestone flowlines are pressure tested prior to placing flowlines into service. Flowlines are tested on an annual basis
in accordance with COGCC 1104 series rules. If a flowline is found to lack integrity, Crestone will investigate the root
cause, as well as report and remediate any spills in accordance with the 900 series rules. All repairs will be completed
in accordance with COGCC 1102 Series rules.
Description of the construction method used for public by-ways, road crossings, sensitive wildlife habitats,
sensitive areas, and natural and manmade watercourses (i.e., open trench, bored and cased, or bored only), if
applicable.
The majority of flowlines are not near any known and defined public receptors or road crossings. Those that are,
county permits are acquired prior to construction of county road crossings. Permit conditions contain minimum
construction requirements.
FLOWLINE SYSTEM ABANDONMENT VERIFICATION
Date:04/11/2025
Description of Abandonment Verification:
The following flowlines were removed in their entirety:
12331571_FL: services the IONE 6-8-4 (05-123-31571)
12331569_FL: services the IONE 8-6-4 (05-123-31569)
12320151_FL: services the IONE 44-4 (05-123-20151)
12331570_FL: services the IONE 6-4-4 (05-123-31570)
12319986_FL: services the IONE 43-4 (05-123-19986)
12326408_FL: services the Miller 2-4-17 (05-123-26408)
1232082312320829_FL: services the Miller CJ 17-A and 23-17 Common Line (05-123-20823, 05-123-20829)
The following off-location flowlines were partially abandoned:
12320721_FL: services the Ione 11-2 (12320721_FL)
12320717_FL: services the Ione 21-2 (12320717_FL)
Flowline were abandoned in place as per Rule 1105.d and verified by a third party.
All other flowlines in this system will remain as previously reported.
The abandoned Flowline System was located within the jurisdiction(s) of the following local government(s).
Abandonment Verification
(No Jurisdiction)
Form 44 filed to report POST-ABANDONMENT verification. The following flowlines were removed in their entirety:
12331571_FL: services the IONE 6-8-4 (05-123-31571)
12331569_FL: services the IONE 8-6-4 (05-123-31569)
12320151_FL: services the IONE 44-4 (05-123-20151)
12331570_FL: services the IONE 6-4-4 (05-123-31570)
12319986_FL: services the IONE 43-4 (05-123-19986)
12326408_FL: services the Miller 2-4-17 (05-123-26408)
1232082312320829_FL: services the Miller CJ 17-A and 23-17 Common Line (05-123-20823, 05-123-20829)
12319986_FL servicing the IONE 43-4 (05-123-19986) was previously abandoned in place 5/7/2024 with verification
submitted on Form 44 doc# 403786062. This line was removed on 6/3/2025 along with the other Ione lines ending at
the same facility: Ione 10 Battery (484435).
Form 44 filed to report POST-ABANDONMENT verification. The following off-location flowlines were partially
abandoned:
12320721_FL: services the Ione 11-2 (12320721_FL)
12320717_FL: services the Ione 21-2 (12320717_FL)
Pre-Abandonment Form 44 doc# 403981281 stated the lines would be partially ABiP and partially removed. Once in
the field, crews discovered multiple lines crossing from third parties that did not populate during initial review. Because
it was was not safe to remove, the lines were fully left in place.
12320721_FL does not have any spill/releases reported on a Form 19.
12320717_FL does not have any spill/releases reported on a Form 19.
Updated GIS data attached.
All other flowlines in this system remained as previously reported.
Comments
OPERATOR COMMENTS AND SUBMITTAL
Date Run: 7/10/2025 Doc [#404237013]Page 2 of 4
flowlines@civiresources.com
Sr. Regulatory Analyst
07/10/2025
Stephany Olsen
ECMC Approved:Director of ECMC Date:
Based on the information provided herein, this Flowline Report complies with ECMC Rules and applicable orders and is hereby
approved.
Title:
Email:Date:
Print Name:
Signed:
I hereby certify that the statements made in this form are, to the best of my knowledge, true, correct and complete.
Date Run: 7/10/2025 Doc [#404237013]Page 3 of 4
ATTACHMENT LIST
Att Doc Num Name
404270274 FLOWLINE SYSTEM GIS SHP
404272394 THIRD PARTY VERIFICATION
404272395 THIRD PARTY VERIFICATION
404272396 ABANDONMENT IN PLACE DOCUMENTATION
Total Attach: 4 Files
COA Type Description
CONDITIONS OF APPROVAL, IF ANY LIST
User Group Comment Comment Date
Stamp Upon
Approval
Total: 0 comment(s)
General Comments