HomeMy WebLinkAbout25-104 Hydro Resources-Rocky Mountain Inc. Contract BFL-Vogal-Stiner Alluvial Well Project 10-08-2025RESOLUTION NO. 25104 A RESOLUTION OF THE BOARD OF TRIiSTEES OF THE TOWN OF FISTONE COLORADO, APPROVING AN AGREEMENT BETWEEN THE TOWN OF FIRESTONE AND HYDRO RESOURCES - ROCKY MOUNTAIN, INC. PERTAINING TO THE TOWN OF FIRESTONE IIFL-VOCL-STINAR ALLUVIAL WELL PROJECT WHEREAS, the 1 own of Firestone ("Town") is in need of professional construction sery ices, and more specifically, installing temporary pumps and performing well development and well pumping, tests, related to the Town of Firestone BFLL-Vogl-Stinar Alluvial Well Project (`Project") and WHEREAS, the Town issued an invitation for bid (1FB") proposals for such services for the Project,, and WHEREAS, the Town has evaluated the bids submitted in response to the 1FB and finds that Ilydro Resources — Rocky Mountain, Inc. ("Flydro Resources") is the lowest responsible, responsive bidder whose bid is most advantageous to the Town WHEREAS, the Town finds that hydro Resources has the expertise, qualifications, and experience to perform the work and duties required for the Project, and desires to select Ilydro Resources as the successful bidder for the IFB and to enter into a construction contract with Ilydro Resources to provide the construction serv=ices and perform the work as described in Construction Contract, attached hereto as Exhihit A. NOW, THEREFORE, BE IT RESOLVED BY TIIE BOARD OF TUTEES OF THE TOWN OF FIRESTONE, COLORADO: Section 1. 'f he Construction Contract between the Town of Firestone and Ilydro Resources, LLC. is approved in substantially the same forum as the copy attached hereto and made a part of this resolution, and the Mayor is authorized to execute the Construction Contract on behalf of the Town. Section 2. The "l own Manager or such person's designee is authorized to approve, sign, execute and deliver any and all change orders on behalf of the Town as may be necessary to complete the Project or for the "ITown to perform under the Contract up to and until such time as the total dollar amount of all such change orders equals or exceeds $2 ,000. at which time any such change order shall be suhlect to approval by the Board. PASSED AND ADOPTED this da AT EST riri4i " .r dos Luna,. CMC, Town Clerk APPROVED AS TO FORM: ars all. Keith , Town .ttorney EXHIBIT A [Hydra Resources Construction Contract Agreement] required services, OR " ♦ - rt ;, . . as - ______ ' . 4191 : $ * * . 041$ 4 4 I' I ii' i'' III. CONTRACT TIMES; COMMENCEMENT AND COMPLETION OF WORK A. The Work shall be substantially completed within 90 days of the Effective Date of this Agreement. It shall continue until the Contractor completes the Scope of Services to the Town's satisfaction, or until terminated as provided herein. B. Either Party may terminate this Agreement upon 30 days advance written notice. The Town shall pay the Contractor for all Work previously authorized and satisfactorily completed prior to the date of termination. If, however, the Contractor has substantially or materially breached this Agreement, the Town shall have any remedy or right of set-off available at law and equity. C. Should a delay in completion constitute a compensable Inconvenience to the Town and its residents, the liquidated damages estabtishedd in this Section shall be enforced. Such damages are not a penalty, and the parties recognize the delays, expenses, and difficulties involved in proving the actual loss suffered by the Town if the Work is not completed on time. Accordingly, instead of requiring such proof the Parties agree that as liquidated damages for each day that all or a portion o€ the Work is delayed beyond the deadlines set forth in Section III hereof, plus any extensions thereof allowed, the Contractor shall be assessed the amount of two hundred fifty dollars ($250) each day until the Work is complete. 1V. COMPENSATION In consideration for the completion of the Work by Contractor, the Town shall pay Contractor, subject to all of the terms and conditions of the Contract Documents, an hourly rate plus expenses contract amount not to exceed $50.670.00 (the "Contract Price). The Contract Price shall include all fees, costs, and expenses Incurred by the Contractor. V. PAYMENT PROCEDURES A. The Contractor may submit Applications for Payment for completed Work monthly. The Contractor may submit periodic invoices, which the Town shall pay within 30 days of receipt. B. The Town may retain up to We percent (5%) of the calculated value of completed work from each application of payment up until the Construction Contract is completed satisfactorily and finally accepted by the Town. C. Upon issuing a final acceptance of the Work for the Project, the Town shall pay to Contractor the remainder of the funds or monies previously withheld as retainage. VI. RESPONSIBILITY A. Contractor hereby warrants that it is qualified to assume the responsibilities and render the services described herein and has all requisite corporate authority and licenses In good standing, required by law. B. The Work performed by Contractor shall be in accordance with generally accepted practices and the level of. competency presently maintained by other practicing contractors in the same or similar type of Work in the applicable community. Page2of18 FIRESTONE * *" * '84 # a # *' , *9$ w * M * ,** .4' # * . " * *. * . it : * * _. .. * 8* * * .. * ` w * * # . * w * II * *' * • '9 * * # r'' '_::: : :. • ; * * • '"i.' 4 : ' A*. : : :', . :. . *19 *9 • $ i : '1. '.' . _,: :' ,: : . . ., Page 3 of 18 I t tf t .t « « # # t . I `6 ttt i1 t' •t t aI t" # t III 44,1 t *$* I, .tom t' • I t *I' t # . . t t t - . I, *4 4 -$ - t- t I - t t' t t t t ttt t •$4 I, .t' « t t I i ' t t#- . # .t- . t t't t' II - t t. . ''S .4 t , #mt # -, IS. t t # # t .. t .t- II f te: t # *4 ' t , i #' I, .t" t *4 t 11.1$ .11 t t II is # .. :.: * '; : : , : : ' • M 11 e !# t 't t- t t # • t a t#'t b t + t t # t tt Pag4 of 18 flRESTONE l B. Notice to Proceed. C. The following maybe delivered or issued, after the Effective Date of the Construction Contract and are attached hereto, Contractors Insurance Certificate, all written amendments and other documents amending, modifying, or supplementing of the Contract Documents. There are no Contract Documents other than those listed above in this Section XI. Xll. CHANGE ORDERS A. A Change Order is a written instrument issued after execution of the Agreement signed by Town and Contractor, stating their Agreement, as applicable, upon all of the following: i. The scope of the change in the Work; 2. The amount of the adjustment to the Contract Price; and 3. The extent of the adjustment to the Contract Times(s). B. All changes in the Work authorized by applicable Change Order shall be performed under the applicable conditions of the Contract Documents. Town and Contractor shall negotiate in good faith and as expeditiously as possible the appropriate adjustment such changes. XLII. MISCELLANEOUS A. Governing Law and Venue. This Construction Contract shall be governed by the laws of the State of Colorado, and any legal action concerning the provisions hereof shall be brought in Weld County, Colorado. B. No Waiver. Delays in enforcement or the waiver of any one or more defaults or breaches of this Construction Contract by the Town shall not constitute a waiver of any of the other terms or obligation of this Construction Contract. C. Integration. This Construction Contract and any attached exhibits constitutes the entire Agreement between the Parties, superseding all prior oral or written communications. D. Third Parties. There are no intended third -party beneficiaries to this Construction Contract. E. Notice. Any notice under this Construction Contract shall be In writing, and shall be deemed sufficient when personally presented or sent pre -paid, first class U.S. Mail to the Party at the address set forth on the first page of this Agreement. P. Severability. If any provision of this Construction Contract is found by a court of competent jurisdiction to be unlawful or unenforceable for any reason, the remaining provisions hereof shall remain in full force and effect. G. Modification. This Construction Contract may only be modified upon written Agreement of the Parties. H. Assignment. Neither this Construction Contract nor any of the rights or obligations of the Parties shall be assigned by either Party without the written consent of the other. Page5of18 FIRESTONE C 0 L 0 It A ti 0 1. Governmental Immunity. The Town and its officers, attorneys and employees, are relying on, and do not waive or intend to waive by any provision of this Agreement, the monetary limitations or any other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, C.R.S. § 24-10-101, et seq., as amended, or otherwise available to the Town and its officers, attorneys or employees. J. Rights and Remedies. The rights and remedies of the Town under this Construction Contract are in addition to any other rights and remedies provided by law. The expiration of this Construction Contract shall in no way limit the Town's legal or equitable remedies, or the period in which such remedies may be asserted, for Work negligently or defectively performed. K. S biect to Annual ApDroDriation. Nothing herein shall constitute a multiple fiscal year obligation pursuant to Article X, § 20 of the Colorado Constitution. Any financial obligation of the Town Is subject to annual appropriation by Its Board of Trustees. Any failure of a Board of Trustees to annually appropriate adequate monies to finance the Town's obligations under this Agreement shall terminate inate the Agreement upon expenditure of the appropriated funds. Page 6 of 18 FIRESTONETO r., w a9 s S4L U HYDRO RESOURCES ROCKY MOUNTAIN, I . By:, EXHIBIT A= SCOPE OF WORK (see attached 6 pages) Page 8 of 18 FIRESTONE McGrane Water Engineering, LLC 1t3t31) Apple Valley IId. , Lyons, Co) 13054{1.011k.- (303)$2,3...§933, cell: (303) !)17-1247 1rMiii: ti. _liEl#��t`t#t'y;Itt'#i:ils`#'.{ if7i. � t'1151iG Stt ti 1111 #M„Itt'tt S7#,'#t'lEyi##c`4!t"111 x!fitk August 14, 2025 Neal Peckler via e-mail:1 cc 1 Cis.' , tc1 3#.�:c Boulder GNC Water Well Service and Supply, Inc. 1901 S. 120th St., Ste A Lafayette, CO 80026 RE: Town of Firestone Vogi-Stinar Well Development and Testing Neal, The Town of Firestone (Town) requests costs for development and testing two alluvial wells located at the potential Vogl-Stinar wellfield site between Longmont and Firestone, Colorado, in Section 36, Township 3N, Range 68W (Figure 1). This letter contains the minimum performance expectations for developing and testing two test wells. McGrane Water Engineering, LLC and Miller Groundwater Engineering, LLC are the Town's consulting engineers. Please complete the bid form below and email It to Dennis McGrane at dennis axmegranewater.com by Friday August 22, 2025, at 2:00 pm. Figure 1— Vicinity Map and Address Owner. YOGI JOHNNY E Account: R4786386 Panel: 120736000051 Address: 11995 COUNTY ROAD 111/4 WELD Subdiviton: Section: 36 Townshlp:3N Range 68W Taxes Irrol oj1 Data Search Sales Owner: STINAR DEBRA) Account: 84786386 Parcel: 120736000051 Address: 11995 COUNTY ROAD 11114 WELD SubdMsian: Section: 36 Township: 3N Range: 68W Taxes ?IQP.LtyJtg9X DataSearch Sales BACKGROUND The Town. of Firestone is evaluating two contiguous parcels (Vogl-Stinar and a parcel located south of the Saint Vrain Creek) for developing a shallow (<25 feet) Horizontal wells (H -well). Under this site exploration phase, approximately six (6) borings, three (3) 2 -in diameter piezometers, and two (2) 6 -in diameter "Test Wells" will be drilled by a drilling contractor (Site Services, Inc) in early September 2025. This Request for Proposal (RPF) is to development and test the two test wells. The planned test well locations (PW-I and PW-2) and test discharge locations are highlighted in light blue on Figure 2. Firestone Vogl-Stinar Well Testing Project Page 4 of 6 i. 0-10 minutes (every minute) ii. 10-20 minutes (every 2 minutes) iii. 20-60 minutes (every 5 minutes) iv. 60 min (1 hr) to 12 hours (every hour) v. 12 hrs to 48 hrs (every 4 hours). 4. The Contractor will text a photograph of the manual data sheet to the Engineer every 4 hours. Discharge Header and Surface Pipe 1. The Contractor shall provide a wellhead discharge manifold consisting of (from upstream to downstream): 1. I. A 90 -degree elbow attached to the drop pipe and set above the test well surface casing ( 2 feet above ground level); 1.2, A backpressure gage that measures at no greater than 2 psi increments (range 0-50 psi max). 1.3. An upstream length of straight 3 -in pipe that is at least 30 -inches long (>10x the pipe diameter); 1.4. A 3 -in diameter electronic flow meter capable of measuring totalized and instantaneous flow within 5%; 1.5. An downstream length of straight 3 -in pipe that is at least 1.5 ft long downstream of the flow meter; 1.6. A water quality sampling port installed on the too horizontal portion of the pipe to sample and assure the pipe is full; 1.7. A flow control valve; 1.8. Approximately 350 feet of solid or lay -flat 3 -in diameter pipe directed to open discharge points shown on Figure 2; 1.9. All necessary changeover pipe connections; 2. All downhole components shall be clean with no visible dirt, oil or grease due to the required water quality sampling. Submittals The contractor shall provide the following submittals prior to purchasing equipment: 1. The test -pump's pump curve (TDH 125 gpm from TDH of -45 ft; min 2 hp).; 2. A picture and cut sheet for the flow meter; 3. A cut sheet of the 3 -in, discharge pipe and calculated friction loss for 350 feet at 125 gpm. Sampling Test well sampling during pumping will be conducted by a third party engineering company (LRE Water, Denver, Co.) using the sample port on the top of the test manifold. The Contractor does not need to be present during well sampling. McGrune Water Engineering, LLC IG(3 }:1pph 'Mky Rd., Lyow. CC) 8O)1, Wd itee µSiil� ITti!':ti±i#FIi'1S Ii{_I_4'�C�iI#i`c iF: m Firestone Vogl-Stinar Well Testing Project AGREEMENT Page5of6 The Contractor will provide their standard drilling contract with their bid. The Town may negotiate specific terms with the Contractor. However, this RFP and following terms and conditions below will be considered part of the contract "agreement." Insurance The Contractor will be required to provide an insurance certificate that meets the requirements ofthe Town and are available upon request. Work Schedule Regular work hours are M -F 7 am to 7 pm unless otherwise approved by the Town. We anticipate the project will take approximately 6 days to complete. Rig Access Rig access is through a gate near the corner of County Road (CR) 26 and CR "Ii 'f" and then generally along the white paths marked on Figure 2. Access will have been demonstrated during the drilling phase. However, if access improvements are required, we request the Contractor provide 48 -hour notice for the Town to improve access. No standby time will be allowed during those 48 hours. Bids and Payment All work will occur at the unit rates provided in the bid sheet or based on a similarly itemized proposal provided. Mobilization includes all project planning, equipment rentals, travel, fuel, water hauling, drilling expenses, profit, per diem, and activities that do not have specified bid items. Payment will be made by the Town of Firestone. Standby time can be charged if there is excessive time waiting on the Engineer as long as that time is longer than then the Engineer has been waiting on the Contractor. Waiting for equipment, personnel, setting up and warming up equipment, and adverse site conditions or weather are not considered standby. Therefore, any standby time will be negotiated after the job is complete. Lost or Damaged Equipment The Town or its Engineer will not be responsible for normal wear and tear on downhole items such as auger flights, drill bits, or lost or damaged testing equipment. Bid Date and Contracting Schedule Please complete and execute the bid form below and email it to Dennis McGrane (dennis@mcgranewater.com) by Friday August 22, 2025 at 2:00 pin. If the bid format is incomplete, please let us know prior to the bid date and we may accept a modified bid form alternative. The bid opening will not be public, but bid results will be released by the Town sometime after the bid once contractor selection has been made. We anticipate that the Town will award the contract at their McGrane Water Engineering, LLC t(;631 Apple Valley Rd., Lwlis, CO 80,301. \Vebsi£e, as s s.sss� s:�ta� s,.sac sz Rz ;atae3-tits .r n�zK Firestone Vogl-Stinar Well Testing Project Page 6 of 6 September Town Board meeting. All testing must be completed by October 31, 2025. Please provide your earliest anticipated mobilization date on the bid sheet, I£ you have any questions, please give us a call. Sincerely, MCGRANE WATER ENGINEERING, LLC. 11 j) Dennis McGrane, P.E., C.P.G. Principal Eng€neer/liydrogeologist I;3111 $ 1345_! Town of Firestone- Vogt Steiner Well Development and Testing Task 3 Description Mob/Demob (Ind. travel, per diem, materials, fuel, equip rentals, site restoration Amt 3 Unit LS Unit Cost $ $ IS Gast $ $ 2 Well DevelopmentSet tip/Tearpown 2 each $ ea $ 3 Well Develoment(laborandfuel)Ihreachwell 2 hrs $ /hr $ 3 Provide, Install and Remove Test Pumping Equipment (2wellsites) 2 each $ ea $ 4 Two Step and Constant Rate Punt Tests (5 hr ste +48 hr CR tests each site) 306 hrs $ /hr $ Total $ $ CONTRACTOR BID A" ACKNOWLEDGEMENT The Contractor acknowledges the above terms and conditions and is submitting the bid above in good faith based on the unit rates provided. Contractor: Date: Contractor Signature Anticipated Mobilization Date: Contractor Name (Printed) Title: McGrane Water Engineering, LLC I(ii9 Apple Valley Its)., Ly m . CO 80�31)1. Wcbsilx: stut,r. taw s;:az antik :s_,.� il5 a EXHIBITS: BID (see attached 3 pages) Page 15 of 18 FIRESTONE August 27, 2025 Hydro Resources - Rocky Mountain, Inc 23027 County Road 18, Unit C Fort Lupton. CO 80621 Phone (303) 857-7540 Fax (303) 857-3825 McGrane Water Engineering, LLC 1669 Apple Valley Road Lyons, CO 80301 ATT1: Mr. Dennis MeGrane Project: Town of Firestone— VogiiStinar Two Well Development & Testing Project Mr. McGrane, Hydro Resources (HR) is pleased to present the following proposal for well development and testing services for the Vogl-Stinar Wells for the Town of Firestone. HR has a history of performing successful well development and testing. HR wishes to outline our understanding of the scope of work. Before reviewing the project details, HR would first like to stress our commitment to the Town of Firestone to providing a company committed to making Health & Safety our number one priority on this project. HR has broken down the proposal into the following units: L Technical Approach and H. Associated Costs HI. Clarifications I. Technical Approach HR has multiple pump rigs and support equipment that can be utilized for this scope. HR plans on utilizing a SMEAL I0T (or equivalent) 10 Ton Capacity rig. Well Development & Testing HR has reviewed the specifications provided by McGrane Water Engineering and wishes to outline our understanding. • Mobilize pump service crew to the well designated by McGrane Engineering and set up. • Install airlift equipment. • Develop the well as outlined for a period of one hour per well. Page 1 Hydro Resources - Rocky Mountain, Inc 13027 County Road 18, Unit C, Fort Lupton, CO 80621 PH: (303) 857-7540 - Fax (303) 857-3826 • Remove airlift equipment, • Install test pump capable of 125 GPM with outlined temporary discharge equipment. • Perform a 5 -hour step test. • Perform a 48 -hour constant rate test (continuously 24/7 & outside of working hours.) • Report findings to McGrane Water Engineering and assist with water quality sampling collection. • Remove test pump. • Rig down and move over to next selected site repeating the above protocol. H. Associated Costs See attached bid sheet. III. Clarifications • HR has reviewed the specifications issued. • HR has assumed working on each well, one at a time. • HR has assumed level, unobstructed access for the pump rig, support equipment and discharge line. • HR has included all fuel costs. • HR has not included taxes. • HR has assumed that the discharge line mentioned in the specifications is for temporary installment only and will be used for airlifting and aquifer testing only and removed. • HR has assumed no fluids require being hauled offsite. • HR acknowledges that hours were listed as 7 AM to 7 PM; but wishes to specify that the constant rated test of 48 hours would be continuous 24/7. • The bid is a complete package and cannot be modified without prior written authorization from HR. The final invoice will reflect actual quantities utilized in the field which are properly documented multiplied by the unit rates quoted. We are confident that the Town of Firestone and McGrane Water Engineering will be impressed with our professional water supply services and look forward to the opportunity to work together. Please contact us at your earliest convenience with any questions or concerns you may have. Sincerely, Hydro Resources Chelsea Bomeman Business Development Hydro Resources cbornernantclhvdroresources.com Jason Barnum Vice President I Business Development Hydro Resources ibarnuiii@hydroresources.com Page 2 Firestone Vogi-Stinar Well Testing Project Page 6of6 September Town Board meeting . All testing must be completed by October 31, 2025. Please provide your earliest anticipated mobilization date on the bid sheet. If you have any questions, please give us a call. Sincerely, MCGRANE WATER ENGINEERING, LLC. I 3 fffJ t } 1 (} �l Dennis McGrane, P.E., C.P.G. Principal Engineer/Hydrogeologist Town of Firestone-Vagl•Steiner Well Development and Testing Task Description Pant Unit Unit Cast $ Cast $ 1 MoblDemob (incl, travel, per diem, materials, fuel, equip ren₹als, site restoration) I t5 $5,000.00 LS $ 5,000.00 2 Weil Development Set Upliearpown 2 each $1,180.00 ea $ 2,360.00 3 Well Development(laborandfuel) lhreachwell 2 hrs $400.00 /hr $ 800.00 3 Provide, Install and Remove Test Pumping Equipment (2well sites) 2 each $ 3,500.00 ea $ 7,000,00 4 Twa Step and Constant Rate PumpTests(S hrstep+48hrCRtests eachsite) 106 hrs $ 335.00 /hr $ 35,510.00 Total $ $ 50,670.00 CONTRACTOR BID AND ACKNOWLEDGEMENT The Contractor acknowledges the above terms and conditions and is submitting the bid above in good faith based on the unit rates proviided. Contractor: Hydro Resources - Rocky Mountain, Inc Date: 0812712025 Contractor Signature " f : f x`t___________________Anticipated Mobilization Date: Late September Contractor Name (Printed) Chelsea. Borneman Title: Business Development McGrane Water Engineering, LLC i titY} Apple mailer Rd., I'ons, CO 808O1. \Vth ile: