Loading...
HomeMy WebLinkAbout21-85 Approving Agreement E-Z Excavating Inc Installation of Waterline St. Vrain Water Treatment Plant Project 07-14-2021RESOLUTION N0.21-85 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING AN AGREEMENT BETWEEN THE TOWN OF FIRESTONE AND E-Z EXCAVATING INC FOR THE INSTALLATION OF A POTABLE WATER LINE AND APPURTENANCES FOR THE ST VRAIN WATER TREATMENT PLANT TRANSMISSION PIPELINE PROJECT WHEREAS, the Town of Firestone's ("Town") St. Vrain Water Treatment Plant Transmission Pipeline Project ("Project") calls for the installation of approximately 2.5 miles of an 18 inch potable water line and associated appurtenances to deliver potable water from the St. Vram Water Treatment Plant to the Town's water distribution system; and WHEREAS, to acquire such services the Town invited twelve qualified contractors to bid on the Project and upon review of the bids by the Town's Project personnel including its design engineering team selected E-Z Excavating Inc. as the lowest responsive and qualified bidder; and WHEREAS, the Town's Project personnel thus recommends that E-Z Excavating Inc. be selected to install the Projects potable water line and associated appurtenances. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Section 1. The agreement between the Town of Firestone and E-Z Excavating Inc, for installation of a potable water line and associated appurtenances for the St. Vram Water Treatment Plant Transmission Pipeline Project is approved in substantially the same form as the copy attached hereto and made a part of this resolution. INTRODUCED, READ AND ADOPTED this�day of , 2021.ft TOWN OF FIRESTONE, COLORADwr bi Sin el r, Mayor ATTEST: