A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF
FIRESTONE, COLORADO, APPROVING AN AGREEMENT BETWEEN
THE TOWN OF FIRESTONE AND E-Z EXCAVATING INC FOR THE
INSTALLATION OF A POTABLE WATER LINE AND APPURTENANCES
FOR THE ST VRAIN WATER TREATMENT PLANT TRANSMISSION
PIPELINE PROJECT
WHEREAS, the Town of Firestone's ("Town") St. Vrain Water Treatment Plant
Transmission Pipeline Project ("Project") calls for the installation of approximately 2.5 miles of an
18 inch potable water line and associated appurtenances to deliver potable water from the St. Vram
Water Treatment Plant to the Town's water distribution system; and
WHEREAS, to acquire such services the Town invited twelve qualified contractors to bid on
the Project and upon review of the bids by the Town's Project personnel including its design
engineering team selected E-Z Excavating Inc. as the lowest responsive and qualified bidder; and
WHEREAS, the Town's Project personnel thus recommends that E-Z Excavating Inc. be
selected to install the Projects potable water line and associated appurtenances.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
Section 1. The agreement between the Town of Firestone and E-Z Excavating Inc, for
installation of a potable water line and associated appurtenances for the St. Vram Water Treatment
Plant Transmission Pipeline Project is approved in substantially the same form as the copy attached
hereto and made a part of this resolution.
INTRODUCED, READ AND ADOPTED this�day of , 2021.ft
TOWN OF FIRESTONE, COLORADwr
bi Sin el r, Mayor