HomeMy WebLinkAbout21-90 Approving Change Order HEI Civil Firestone Reservoir Infastructure 08-11-2021RESOLUTION N0.21-90 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING A CHANGE ORDER FOR THE AGREEMENT BETWEEN THE TOWN OF FIRESTONE AND HEI CIVIL, REGARDING THE FIRESTONE RESERVOIR NO.1 SUPPLY AND DELIVERY INFRASTRUCTURE PROJECT WHEREAS, the Firestone Reservoir No.l Supply and Delivery Infrastructure Project ("Project") called for the Horizontal Direction Drill ("HDD") installation of the pipeline crossing Zinnia Avenue that will be used to transfer water from Reservoir No. 1 to the St. Vrain River; and WHEREAS, limitations on the degree of bend in the proposed pipe material and concerns with the soil resulted in the need for a deeper installation of the pipeline, which would be problematic if the pipeline needed repair; and WHEREAS, the Proj ect's design team proposed a solution that would still result in a deeper pipe but would utilize a more traditional bore and jacked case pipe that would make repairs more manageable; and WHERAS, to effectuate such a change, the proposed Change Order removes the HDD installation and replaces it with 2-30 inch diameter bore and jacked casing pipe for the Zinnia Avenue crossing. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO0 The Change Order for the Firestone Reservoir No. 1 Supply and Delivery Infrastructure Project Agreement between the Town of Firestone and HEI Civil is approved in substantially the same form as the copy attached hereto and made a part of this resolution and the Mayor is authorized to execute the Change Order on behalf of the Town. INTRODUCED, READ ��`ay of WN psi • l0 APPROVED AS TOOI C Attorney CHANGE ORDER No. 2 PROJECT Firestone Reservoir No. 1 Supply and Delivery Infrastructure Project DATE OF ISSUANCE 7/30/2021 EFFECTIVE DATE OWNER OWNER'S Contract No. CONTRACTOR Town of Firestone W2020-0965 HEI Civil ENGINEER You are directed to make the following changes in the Contract Documents. Description: Stantec 1.) Increase Line Item 26-St. Vrain Delivery Pipeline quantity by 38-LF to 3,503-LF total. Resulting line item total equal to $427,366.00 2.) Reduce Line Item 27-Directional Drilling quantity to 0. Resulting line item total equal to $0.00 3.) Add Line Item 52-30-in Auger Bore with units of LF. Unit Price equal to $1,764.00/LF. Total quantity equal to 304-LF. Resulting line item equal to $536,256.00 4.) Add Line Item 53-Auger Bore Dewatering with units of Days. Unit Price equal to $3,058.00/DY. Total quantity equal to 15-DY. Resulting line item equal to $45,870.00 Attachments: None CHANGE IN CONTRACT PRICE: RECOMMENDED CHANGE IN CONTRACT TIMES: Original Contract Price Substantial Completion: 365 $ 7,016,948.45 Ready for final payment: 400 days or dates Net changes from previous Change Orders No. 0 to I Net changes from previous Change Orders No. 0 to 1 $ 1013993.10 0 days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 365 $ 7,118,941.55 Ready for final payment: 400 Net Increase (decrease) of this Change Order Net Increase (decrease) of this Change Order $ 457,562.00 0 days Contact Price with all approved Change Orders Contract Times with all approved change Orders Substantial Completion: 365 $ 7,576,503.55 Rea r final payment: 400 G "r By: Y� Engineer (Authorized Signature) C Date: 8/2/2021 Date: This CHANGE ORDER, when executed, constitutes a modification to the G'I compensations for the additional work and any delays to the project caused �G,^CONE CCEPTED ��•••,�'< otq�taiy gnee ev Noan caner Noah Carter �tanca ezn aver®he .�m. MID 2091 0 iiLjLj 9 6'W �= Q contractor (Authorized Signature) `0 8/2/2021 te: contractor accepts this change order as full ORDER.