21-113 Approving Change Order No. 1 to the First Amendment to Part 2B Construction Phase of the Town of Firestone and Integrated Water Services Inc St Vrain Water Treatment Plant_11.10.2021 with agreement
RESOLUTION N0.21-113 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING CHANGE ORDER NO. 1 TO THE FIRST AMENDMENT TO PART 2B CONSTRUCTION PHASE OF THE TOWN OF FIRESTONE AND INTEGRATED WATER SERVICES INC.'S ST. VRAIN WATER TREATMENT PLANT AGREEMENT WHEREAS, because of conditions and circumstances beyond the control of Integrated Water Services Inc. ("IWS"), it has incurred delays in the performance of its duties for the St. Vrain Water Treatment Plant Project ("Project") ; and WHEREAS, such delays necessitate that the First Amendment to Part 2B Construction Phase of the Town of Firestone and Integrated Services Inc.'s St. Vrain Water Treatment Plant Agreement be amended, specifically that Contract Times, for Substantial Completion be extended from October 25, 2021, to April 4, 2022, and Final Payment be extended from December 24, 20215 to April 25, 2022, as set forth in the attached Change Order No. 1. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Change Order No. 1 to the First Amendment to Part 2B Construction Phase of the Town A Firestone and Integrated Water Services Inc.'s St. Vrain Water Treatment Plant Agreement is approved in substantially the same form as the copy attached hereto and made a part of this resolution, and the Mayor is authorized to execute the Change Order on behalf of the Town. INTRODUCED, READ, AND ADOPTED this 1/%ftX111%y of jy OV , 2021. mseAL =0 a °,o o ATTEST: tea: ,00� or TY cps. n , /J I le si a Koenig, Ch C o Clerk VED AS TOWN OF FIRESTONE, COLORADO At L \ I dlgrA� bi Sin elar, Mayor D-941- CHANGE ORDER Change Order No. 01 Owner: Town of Firestone Contractor: Integrated Water Services, Inc. Engineer: Plummer Associates, Inc. Project: St. Vrain Water Treatment Plant The Contract is modified as follows upon execution of this Change Order. Description: 1. Extension of contract time due to project delay. Attachments: None CHANGE IN CONTRACT PRICE Original Contract Price: $: 17 997 128 Increase /Decrease from previously approved Change Orders No. to No. Contract Price prior to this Change Order: $: 17 997 128 Increase /Decrease of this Change Order: Contract Price incorporating this Change Order: $: 17 997 128 CHANGE IN CONTRACT TIMES [note changes in Milestones if applicable] Original Contract Times: 355 for substantial completion and 60 days for final from Part 2B NTP on 11/4/2020 Substantial Completion: 10/25/2021 Ready for Final Payment: 12/24/2021 calendar days or Increase /Decrease from previously approved Change Orders No. to No. Substantial Completion:_N/A Ready for Final Payment: N/A calendar d Contract Times prior to this Change Order: Substantial Completion: _355 days from Part 26 NTP Ready for Final Payment; Additional 60 days (calendar days or dates) Increase / Decrease of this Change Order: Substantial Completion: _161 additional calendar days Ready for Final Payment: 21 calendar days from substantial calendar days or dates Contract Times with all approved Change Orders: Substantial Completion: April 4, 2022 Ready for Final Payment: April 25, 2022 calendar days or d FRSTN-0305 Page - 1 Construction Set —June 2020 Copyright ©2013 National Society of Professional Engineers for EJCDC. All rights reserved. Note: This document was developed based on EJCDC Standard Form Design and Construction Related Documents and has been modified as necessary. EJCDC retains all proprietary rights to these documents. RECOMMENDED: By: Engineer (Authorized Signature) Print Name: Kelly Fea Title: ACCEPTED: By: Print Name: Title: RECEIVED: Project Manager, Plummer Date: 11/1/2021 Contractor (Au on Print Name: Pf l! Title: Lba APPROVED: By: Print Name: Title: nature) Funding Agency (Authorized Signature) Date: f i%�%ZJ Date; FRSTN-0305 Page - 2 Construction Set —June 2020 Copyright ©2013 National Society of Professional Engineers for EJCDC. All rights reserved. Note: This document was developed based on EJCDC Standard Form Design and Construction Related Documents and has been modified as necessary. EJCDC retains all proprietary rights to these documents.