HomeMy WebLinkAbout21-209 APPROVING CHANGE ORDER NO.1 TO THE AGREEMENT BETWEEN THE TOWN OF FIRESTONE AND INTEGRATED WATER SERVICES INC FOR CONSTRUCTION OF A PUMP STATION FOR THE ST. VRAIN WATER TREATMENT PLANT 12.8.2021RESOLUTION NO. 21-209
A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE,
COLORADO, APPROVING CHANGE ORDER NO.1 TO THE AGREEMENT
BETWEEN THE TOWN OF FIRESTONE AND INTEGRATED WATER SERVICES
INC FOR CONSTRUCTION OF A PUMP STATION FOR THE ST. VRAIN WATER
TREATMENT PLANT
VirHEREAS, the St. Vrain Water Treatment Plant Project (."Project") requires the
installation of pipelines to connect the Firestone Alluvial Supply Treatment ("FAST") wells to the
St. Vrain Water Treatment Plant; and
WHEREAS, to maintain the Project schedule it is essential that this work commence now
and Integrated Water Services Inc. ("IWS") which is currently on site and under contract for other
Project duties has the ability to timely constrict the pipelines; and
WHEREAS, staff thus request that the Board of Trtstees approve Change Order No.l
which modifies the parties Agreement to provide for constriction of pipelines to connect the FAST
wells to the St. Vrain Water Treatment Plant,
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
Change Order No. 1 to the Agreement between the Town of Firestone and Integrated
Water Services Inc. for the Constriction of a Pump Station for the St. Vrain Water Treatment
Plant is approved in substantially the same form as the copy attached hereto and made a part of
this resolution and the Mayor is authorized to execute the Change Order on behalf of the Town.
INTRODUCED, READ AND ADOPTED this ay of �T\
' h r
tt
William P. Hayashi, Tc% A
orney
TOWI�T
Bobbi Sindelar,
l�
;o
Ca
cool
Goa
60006,
SECTION 00941
CILANGE ORDER
Date of Issuance: 2021.11.30 Effective Date: 2021.11.30
St. Vrain WTP Pump Station Owner: Town of Firestone
Contract:
Contractor:
Integrated Water Services
Owner's Contract
Date of Contract:
May 26, 2021
Engineer's Projec
The Contract Documents are modified as follows upon execution of this Change Order:
Description:
No.: 227704136
No.1
02
The Town has requested the Contractorto provide a price for the FAST Alluvial Pipeline Supply project which will be added to this current
attached Bid Sheet.
Attachments (list documents supporting change):
ment A -Bid Tab from IWS
CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES:
Original Contract Price:
$2, 377.900.00
Increase/Decrease from previously approved Change
Orders No. 0 to No. 0:
Contract Price prior to this Change Order:
$2,377,900.00
Increase of this Change Order:
$387,814.00
Contract Price incorporating this Change Order:
$2,765,714.00
RECOMMENDED:
gy. _ �.Ma �,�----.
Engineer (Authorized Signature)
Date: 11 /30/2021
Approved by Funding Agency (if applicable):
ACCE
By:
Original Contract Times: ❑Working days ®Calendar days
Substantial completion (days or date): November 1.2021
Ready for final payment (days or date): December 31. 2021
IncreaselDecreaseftom previously approved Change Orders
No. 0 to No. 0;
Substantial completion (daysj:.
Ready for final payment (days):
Contract Times prior to this Change Order:
Substantial completion (days or date): November 1 � 2021
Ready for final payment (days or date): December 31. 2021
Increase of this Change Order:
Substantial completion (days or date): March 3.2022
Ready for final payment (days or date): March 10, 2022
Contract Times with all approved Chahge Orders:
Substantial completion (days or date): March 3. 2022
(days or date): March 10, 2022
r�
v"
��
Owner (Authori�d Signature)
Date: 2 � -�L � 2..�,.. ....... �.
�-�sf = ,�
ACCEPTED:
By; Greg Dill�.� ��tir�..N�p,�,
;. y
Contractor (Authorized Signature)
Date:
EJCDC C-941 Change Order
Prepared by the Engineers Joint Contract Documents Committee and endorsed by
00941 -1
�;
Institute,
BID SHEET, BID FORM, BASE SCHEDULE
PROJECT: I I -WELL PIPELINE
TOWN OF FIRESTONE, CO
11/12/2021
Rent No,
Description
Unit
Estimated
uanti
Unit Price
Fi ures
Unit Price (Written)
Bid Amount
(Figures)
I
Mobilization/Demobilization (5%
maximum)
LS
LS
$17,557
Seventeen thousand five hundred fifty seven dollars
$17,557
2
Sedimentation Control
LS
LS
$12,582
Tmlve thousand five hundred eighty hvo dollars
$123582
3
Uti I ity Locates
LS
LS
$2,048
Two thousmid forty eight dollars
$2,048
4
Topsoil Stripping, Stockpiling, and
Replacement
SY
6000
$4.27
Four dollars menty seven cents
$25,597
5
8-in MJ Plug
EA
1
$307
Three hundred seven dollars
$307
6
Install 8-in DR-18 C-900 Pipe (pipe
supplied by Town)
LF
1710
$112
One hundred twelve dollars
$190,920
7
8-in MJ Gate Valve w/ Mega Lug
EA
3
$2,919
T%vo thousand nine hundred nineteen dollars
$8,758
8
4-in Mega Lug r Tie -into V-Wells
EA
3
$87
Eighty seven dollars
$261
9
8-in 90 Degree Restrained Joint Bend
EA
2
$885
Eight hundred eighty five dollars
$1,770
10
8" x 8" MJ x MJ Tee
EA
3
$2,663
Two thousand six hundred sixty three dollars
$7,990
11
8" x 4" MJ Reducer
EA
3
$744
Seven hundred forty four dollars
$23231
12
4-in MJ Restrained Joint Gate Valve
EA
3
$1,233
One thousand tm) hundred thirty three dollars
$3,699
13
Install 44n DR-18 C-900 Pipe (pipe
stwolied by Town)
LF
430
$99
Ninety nine dollars
$42,608
14
4-in MJ 45 degree bend restrained joint
EA
2
$237
Ttvo hundred thirty seven dollars
$474
15
4-in MJ 90 degree bend retrained joint
EA
1
$1,453
One thousand four hundred fifty three dollars
$1,453
16
Clay Cut -Off Wall cut into trench wall)
EA
2
$1,355
One thousand three hundred fifty five dollars
$21709
17
5' Dia Meter MH
EA
1
$11,010
Eleven thousand ten dollars
$11,010
19
8" Flow Meter
EA
1
$5,894
Five thousand eight hundred ninety four dollars
$5,894
19
20" x 8" MJ Restrained Joint Reducer
EA
1
$5,102
Five thousand one hwndred two dollars
$5,102
20
Furnish and Install 20-in C-900 Pie
LF
25
$641
Six hundred forty one dollars
$16,034
21
Fire Hydrant Assembly (paint purple)
EA
2
$4,119
Four thousand one hundred nineteen dollars
$8,239
22
Pipeline Markers
EA
6
$622
Six hundred twenty fin dollars
$3,734
23
Flushingand Hydrostatic TestingLS
LS
$5,284
Five thousand biro hundred eighty four dollars
$5,284
24
Site Restoration and Reve
LS
LS
$11,552
Eleven thousand five hundred fifty hvo dollars
$111552
$0
Total Base Bid $ $3875814
Tlu•ee hundred eighty seven thousand eight hundred fourteen dollars
Total Bid (Written)
If I
Pa t �AWGr661
,�uE Psornx,l