Loading...
HomeMy WebLinkAbout26-13 Approving and Adopting the 2026 Potable Water Master Plan 02-18-2026RESOLUTION 26-13 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO APPROVING AND ADOPTING THE'2026 POTABLE WATER MASTER PLAN WHEREAS, on July 24, 2024, the Town of Firestone ("Town") Board of Trustees ("Board") adopted Resolution No. 24-72, which approved an agreement to retain the engineering firm of Kimley-Horn and Associates, Inc. ("Kimley-Horn") to prepare the Town's new Potable Water Master Plan (the "Plan"); and WHEREAS, in collaboration with Town staff, Kimley-Horn conducted a detailed analysis of (a) the current condition of the Town's potable water system and potential areas of concern, and (b) the existing master meters and connection points, providing recommendations for potential operational improvements; and WHEREAS, after developing three water model scenarios —Existing Conditions, 2030, and Buildout—Kimley-Horn: (a) used the Existing Conditions model to identify potential near - term improvements and alternatives for the Town's future water system; (b) used all three models to identify system -wide improvements, including additional storage tanks, pump stations, master meter connections, waterline loops, and potential emergency interconnects with other service providers; and (c) developed a detailed implementation plan outlining the phasing (short-, mid-, and long-term) and funding of required potable water improvements. The plan identifies triggers for priority improvements, such as specific developments or population growth, and includes cost estimates and potential funding sources; and WHEREAS, using this information, along with input from the Town, Kimley-Horn prepared the Plan, which includes a review of applicable laws and regulations, planning assumptions, water usage, financials, organizational structure and staffing, and a Capital Improvement Plan, attached as Exhibit A and incorporated herein by reference; and WHEREAS, the Plan includes hydraulic distribution system modeling; evaluates the hydraulic and treatment capacities of the Town's system; identifies deficiencies in the treatment and distribution systems; estimates and prioritizes capital needs; assesses staffing and administrative operations; and prepares a master plan aligned with the Town's Design Standards and Construction Specifications for Water Systems; and WHEREAS, the Town Board desires to officially adopt the Plan so that the goals and objectives of the Plan can be pursued and accomplished, and the Town Board finds that adoption of the Plan is in the best interest of the Town and its residents; and NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Section 1. The Town Board hereby approves and adopts the Town of Firestone 2026 Potable Water Master Plan , attached hereto as Exhibit A and incorporated herein by this reference, as an official plan of the Town of Firestone. Section 2. The Town Manager and Town Staff are hereby authorized and directed to take such other actions as are necessary to implement and carry out the actions in the Plan, subject to and consistent with budgetary and other measures adopted by the Town Board. PASSED AND ADOPTED this 24th day of September, 2025. TOWN OF FIRESTONE, COLORADO Don Conyac, ATTEST: M Missy Carranco, Deputy Town Clerk APPROV S TO FORM: Keith To ttorney