FIELD OPERATIONS NOTICE
FORM
42
Rev
01/21
Document Number:
ECMC RECEPTION
Receive Date:
03/12/2026
404577123
Christina Hirtler
Signature:Title:
Print Name:Email:
Date:
christina_hirtler@oxy.com
I hereby certify all statements made in this form are, to the best of my knowledge, true, correct and complete.
03/12/2026Regulatory
ECMC Operator Number:
City:
Company Name:
Address:
47120
KERR MCGEE OIL & GAS ONSHORE LP
P O BOX 173779
DENVER Zip:State:80217-3779
Contact Person:Kevin Graff
Phone:
( )
(970) 217-6166
CO Email:
Fax:
kevin_graff@oxy.com
Entity Information
05 - - - 492821 492821
Sec:Twp:Range:QtrQtr:34 Lat:Long:3N 68W SESE 40.178307 -104.983491
API #:Facility ID:Location ID:
Facility Name:MIDWEST PAD Submit By Other Operator
Update of a previous Form 42 Notice NO
NOTICE OF CONSTRUCTION OR MAJOR CHANGE AT OIL & GAS LOCATION – 2 business days notice required
Start Date:03/16/2026
Are Construction or Major Change operations at the Location anticipated to last for longer than one day?
If YES, describe the anticipated duration and planned scope of these operations:
The estimated build duration for this first phase of operations (the perimeter stormwater/irrigation water intercept ditch), is 30
days. A second Form 42 Construction notice will be submitted when pad construction starts.
Yes
For Construction or a Major Change at an Oil and Gas location, activities conducted between April 1st and August 30th, the
Operator should review Rule 1202.a.(8).
The Form 42 shall be submitted as required by Rule, Notice to Operators, Policy, or Condition of Approval.
A Form 42 Update shall be submitted to revise the scheduled date or time on a previous Form 42 - Advance Notice of Field Operations.
A Form 42 Update must be for the same well, location, or facility and for the same Field Operation as a previous Form 42.
NOTE: Operator's Contact for Advance Notices of Field Operations should be available 24 hours a day, 7 days a week and should have
the most current scheduling information for the operation. Operator's Contact for other notices should be able to respond to questions
regarding the reported information.
Date Run: 3/12/2026 Doc [#404577123] Well Name: MIDWEST PAD Page 1 of 1