HomeMy WebLinkAbout22-36 Change Order No. 6 Hudick Excavating Inc Firestone Reservoir No. 1 Supply & Delivery Infastructure Project 03-09-2022RESOLUTION N0.22-36 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING CHANGE ORDER NO. 6 FOR THE AGREEMENT BETWEEN THE TOWN OF FIRESTONE AND HUDICK EXCAVATING INC REGARDING THE FIRESTONE RESERVOIR NO,1 SUPPLY AND DELIVERY INFRASTRUCTURE PROJECT WHEREAS, upon completion of the Firestone Reservoir No. 1 Supply and Delivery Infrastructure Project's two pump stations a number of electrical system testing and design issues arose regarding the jib -crane and winch system and the pump stations heating and air handling systems which resulted in the need for additional testing, wiring and equipment: and WHEREAS, these changes could not have been reasonably expected by the contractor Hudick Excavating Inc. d.b.a HEI Civil. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Change Order No. 6 for the Reservoir No. 1 Supply and Delivery Infrastructure Agreement between the Town of Firestone and Hudick Excavating Inc is approved in substantially the same form as the copy attached hereto and made a part of this resolution, and the Mayor is authorized to execute the Change Order on behalf of the Town. INTRODUCED, READ, AND ADOPTED thislay of (�YC,�[�--, 2022. ATTEST: Je sic Koenig, TO F William Clerk ttorney TOWN OF FIRESTONE, COLORADO bi Sind�lr, CHANGE ORDER No. 0 DATE OF ISSUANCE OWNER'S Contract No. CONTRACTOR PROJECT Firestone Reservoir No. 1 Supply and Delivery Infrastructure Project 2/25/2022 EFFECTIVE DATE Town of Firestone W2020-9529 HEI Civil ENGINEER You are directed to make the following changes in the Contract Documents. Stantec Description: 1.) Add Line Item 95-Breaker Testing Tower & Irrigation with units of LS. Unit Price equal to $8,611.75. Total quantity equal to 1-LS. Resulting line item equal to $8,611,75 2.) Add Line Item 96-Jib Crane Power with units of LS. Unit Price equal to $1,654.22. Total quantity equal to 1-LS. Resulting line item equal to $1,654,22 3.) Add Line Item 97-Additiona1 Heater Breakers on Tower &Irrigation with units of LS. Unit Price equal to (t7,181.75. Total quantity equal to 1-LS. Resulting line item equal to $7,181,75 4.) Add Line Item 98-MAU Power and Control Install Irrigation with units of LS. Unit Price equal to $7,412,90. Total quantity equal to 1- LS. Resulting line item equal to $7,412,90 5.) Add Line Item 99-MAU Power and Control) Install Tower with units of LS. Unit Price equal to $8,176.31. Total quantity equal to 1-LS. Resulting line item equal to $8,176.31 Attachments: None CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Substantial Completion: 365 $ 7,016,948.45 Ready for final payment: 410 days or dates Net changes from previous Change Orders No. I to 5 Net changes from previous Change Orders No. 1 to 5 $ 2,498, 066.09 59 days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 441 $ 9,5153014.54 Ready for final payment: 469 Net Increase (decrease) of this Change Order Net Increase (decrease) of this Change Order $ 331036093 56 da s Contract Price with all approved Change Orders Contract Times with all approved change Orders Substantial Completion: 497 [March 21, 2022] $ 915481051,47 Ready for final payment: 525 [April 18, 2022] RECOMMENDED APPRW ED � ACCEPTED rspvy sy�E.HV.•airc. o�- G�Mb3n+.oa.:r,asv�mal Wiggins, David ppA°��°°m�°G°= �UIS �4W . By: By: By: Engineer (Authorized Signature) Ow er Authorize gn ure Wntractor (Authorized Signature) Date: 2/25/2022 Date: /q I'dQa a1 Date: 11.22 This CHANGE ORDER, when executed, constitutes a modification to the CONTRACT. The Contractor accepts this change order as full compensations for the additional work and any delays to the project caused by this CHANGE ORDER.