Loading...
HomeMy WebLinkAboutStreet Maintenance Projects Begin Next Week - 5/10/2024Neighborhood Street Maintenance Projects Begin Next Week Beginning next week, Monday, May 13, 2024, Brannan Sand and Gravel will start the 2024 Neighborhood Street Maintenance projects. The contractor will start with the crack repairs in Stoneridge, Oak Meadows, and Monarch Estates, then move to the edge mill and overlay project in Monarch Estates and Oak Meadows. View maps of the work for each neighborhood here: Stoneridge Monarch Estates Oak Meadows Weather permitting, regular work hours will be from 7:00 a.m. to 6:00 p.m. Monday through Friday, and the project should be completed within 90 days. Residents can expect to receive door hanger notices from the contractor, with specific timing for the work on their street. CRACK REPAIR: 300 tons of crack repair will be completed on 2" or larger cracks in the Stoneridge subdivision. 500 tons of crack repair will be completed on 2" or larger cracks in the Oak Meadows subdivision. 500 tons of crack repair will be completed on 2" or larger cracks in the Monarch Estates subdivision. EDGE MILL AND OVERLAY: Monarch Estates Sandy Ridge Ave - from Birch St to Barron St Bald Eagle St - from Sandy Ridge Ave to Monarch Dr Silverleaf Ave - from Barron St to cul-de-sac Barron St - from Silverleaf Ave to cul-de-sac Shenandoah Ave - from Silverleaf Ave to cul-de-sac Bedford St - from Monarch Dr to cul-de-sac Monarch Dr - from Bedford St to Bald Eagle St Bailey St - from Monarch Dr to cul-de-sac Belmont St - from Sandy Ridge Ave to cul-de-sac Autumn St - from Silverleaf Ave to cul-de-sac Oak Meadows Ulysses Ave - from Oak Meadows Blvd down to and including both cul-de-sac's Oak Meadows Blvd - from Firestone Blvd 400' to Trailway Ave Motorists are urged to pay close attention while driving through the work area and be prepared for slight delays. Please abide by all posted traffic control signs, be aware of detours, and reduce speeds in the work zone. For more information on this project, please contact Firestone Public Works at 303-833-3544. Share on Facebook Share on Twitter Share via Email Copyright © 2024 Town of Firestone. All Rights Reserved. 9950 Park Ave., Firestone, CO 80504 Powered by