Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Town of Firestone Traffic Signal Upgrades - 8/1/2025
Beginning Sunday night, August 3, a contractor for the Town of Firestone will begin upgrading traffic signals, including traffic control cabinets and detection systems, at several intersections. Work Schedule The upgrades will take place overnight from 8:00 p.m. to 5:00 a.m., and are expected to span five nights, weather permitting. Traffic control will be in place during active work, including Uniformed Traffic Officers and Traffic Control Supervisors. Tentative Nightly Work Plan Sunday, August 3: Colorado Blvd & Booth Dr – Cabinet upgrade and detection camera installation Monday, August 4: Finish Booth Dr, then begin detection camera installation at Colorado Blvd & Sable Ave Tuesday, August 5: Colorado Blvd & Sable Ave – Cabinet upgrade and detection camera installation Wednesday, August 6: Firestone Blvd & Oak Meadows Blvd – Cabinet upgrade and detection camera installation Thursday, August 7: Final detection camera work at all locations and system testing Daytime Work If any work is delayed or unfinished during the scheduled nights, it will be completed during the day, between 7:00 a.m. and 5:00 p.m. Traffic Impacts Drivers may experience minor delays at these intersections during the work. Please reduce speeds, follow posted signage, and remain alert when traveling through work zones. Once work is complete, signal timing will return to normal. Note: The traffic signals at Firestone Blvd & East Frontage Road, as well as those at I-25 interchanges, are maintained by CDOT (Colorado Department of Transportation). To report issues or request signal timing adjustments at those locations, please use their online reporting system. Share on Facebook Share on Twitter Share via Email Copyright © 2025 Town of Firestone. All Rights Reserved. 9950 Park Ave., Firestone, CO 80504 Powered by