Loading...
HomeMy WebLinkAboutUpcoming Street Maintenance Projects - 12/5/2025Upcoming Street Maintenance Projects Weather permitting, the Town of Firestone Streets Division will have a contractor on site next week to complete two asphalt patching projects on Colorado Boulevard and Sable Avenue. Scheduled Work: Tuesday, December 9 – Thursday, December 11 Crews will be working from 8:00 a.m. to 4:00 p.m. at the following locations: Colorado Blvd (CR 13): Between Oak Meadows and CR 26 (1 location) Sable Ave (CR 22): Between Birch Ave and Frontage Road (2 locations) Traffic Impacts Roadways will remain open throughout the project, with traffic control personnel guiding vehicles through the work zones. Motorists should: Stay alert and expect minor delays. Be prepared for lane shifts and occasional single-lane alternating traffic. Allow for delays of up to 10 minutes during active work periods. Obey reduced speed limits and all posted signs. Avoid the area when possible. For more information on this project, please contact the Town of Firestone Operations and Maintenance Division: George Hubert at 720-508-4128 or John Pursel at 303-503-9558. Share on Facebook Share on Twitter Share via Email Copyright © 2025 Town of Firestone. All Rights Reserved. 9950 Park Ave., Firestone, CO 80504 Powered by