Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Historic Firestone Waterline & Roadway Replacement Project - 4/28/2023
Historic Firestone Waterline & Roadway Replacement Project #2 Begins Next Week Beginning next week, May 1, 2023, Defalco Construction will begin work on Historic Firestone Waterline and Roadway Replacement Project #2. Work will start on 4th Street, Buchannan Ave, and Granville Ave. to 3rd Street and will then move to Wooster Dr., Jackson Dr., and 3rd Street. The schedule is subject to change and will be updated once confirmed. Weather permitting, regular work hours will be from 7:00 a.m. to 7:00 p.m. Monday through Friday, and the project should be completed by the end of 2023. Residents who will be impacted by the work will receive door hanger notices from the contractor with specific timing for the work on their street. Motorists are urged to pay close attention while driving through the work area and be prepared for slight delays. While on 4th Street, be aware that there will be multiple lane shi s at both intersections during construction. Please abide by all posted tra ic control signs, reduce speeds in the work zone, and avoid the work area if possible. For more information on this project, contact Town of Firestone Senior Civil Engineer, Nate Haasis, at 303-531-6274. Share on Facebook Share on Twitter Share via Email Copyright © 2023 Town of Firestone. All Rights Reserved. 9950 Park Ave., Firestone, CO 80504 Powered by