20-56 Integrated Water Services, Inc St. Vrain Water Treatment 05-27-2020
RESOLUTION N0.20-56 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING PART 2A (SITE AND CONCRETE WORK) OF THE TOWN OF FIRESTONE AND INTEGRATED WATER SERVICES, INC.'S ST. VRAIN WATER TREATMENT PLANT PROJECT AGREEMENT WHEREAS, by adoption of Resolution 19-54, the Board of Trustees of the Town of Firestone and Integrated Water Services, Inc., ("IWS") entered into a Design Services Agreement for the St. Vrain Water Treatment Plant Project; and WHEREAS, IWS has completed the design services work and is set to proceed with the Project's Site and Construction tasks (Part 2A), and WHEREAS, commencement of Part 2A requires that the Town of Firestone issue a Notice of Award, that IWS submit a Price Proposal Form, and the parties execute a Notice to Proceed and an Agreement between Owner and Construction Manager At Risk on the Basis of Cost -Plus. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Part 2A of the Town of Firestone and Integrated Water Services Inc.'s St. Vrain Water Treatment Plant Project Agreement is approved in substantially the same form as the copies attached hereto and made a part of this Resolution, and the Mayor is authorized to issue the Notice of Award, execute the Notice to Proceed, and Agreement Between Owner and Construction Manager at Risk on the Basis of Cost Plus, and accept Integrated Water Services, Inc.'s Price Proposal Form on behalf of the Town of Firestone. INTRODUCED, READ ATTEST: r9 s'ca Koenig, T AS TO FVJRM: Williarri�/Hayashi, Town Attorney s thiday of , 2020. TOWN Of FIRESTONE, COLORADO i Similar, Mayor Owner: Contractor: Engineer: D-510 — NOTICE OF AWARD (PART 2B: CONSTRUCTION PHASE SERVICES) Town of Firestone d Water Services Plummer Associates, Inc. Project: St. Vrain Water Treatment Plant TO BIDDER: Part 26: Construction Phase Services: You are notified that Owner has accepted Part28 of the Construction Phase eid dated 09/11/2020 for the above Contract, and that you are awarded a Contract for: St. Vrain Water Treatment Plant (Describe Work, Alternates, or Sections of Work Awarded] The Contract Price includes: 1) Cost Plus Fee: a. Cost of Work (minus previous payments by Owner) Part 2A Base Bld b. Cost of Work Part 2A Geotechnical Allowance: c. Cost of Work Part 2A Contingency: d. Cost of Work Part 2A Winter Contingency: e. CMAR Fixed Fee Part 2A: f. Cost of Work (minus previous payments by Owner) Part 2B Base Bid: g. Cost of Work Part 2B Contingency: h. CMAR Fixed Fee Part 2B: $ 4,413,271 $ 92,000 $ 242,487 $ 95,080 $ 436,472 $ 11,021,127 $ 605,610 $ 11091)081 Total Guaranteed Maximum Price (Part 2A plus Part 2B) to Owner for the Cost of the Work including the Cost of Work and the Construction Manager at Risk's Fee will not exceed: $ 17,997,128 1 unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the Contract Documents accompanies this Notice of Award or has been transmitted or made available to Bidder electronically. [revise if multiple copies accompany the Notice of Award] ® a set of the Drawings will be delivered separately from the other Contract Documents. You must comply with the following conditions precedent within calendar days of the date of receipt of this Notice of Award: 1. Deliver to Owner I electronic counterparts of the Agreement, fully executed by Bidder. FRSTN-0305 Page -1 Construction Set -June 2020 EJCDC® D-510, Design -Build Notice of Award. Copyright ©2013 National Society of Professional Engineers for EJCDC. All rights reserved. Note: This document was developed based on EJCDCStandard Form Design and Construction Related Documents and has been modified as necessary. EJCDC retains all proprietary rights to these documents. 2. Deliver with the executed Agreements) the Contract security (e.g., performance and payment bonds] and insurance documentation as specified in the Instructions to Bidders and General Conditions, Articles 2 and 6. 3. Other conons precedent (if any): Failure to comply with these conons wn the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited. Within 10 calendar days after you comply with the above conditions, Owner will return to you one fully executed counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in Paragraph 2.02 of the General Conditions. OWNER Town of Firestone Owner's Name By: Signature c" Date Print Name ' " Title Copy: Engineer FRSTN-0305 Page - 2 Construction Set -June 2020 EJCDC° D-510, Design -Build Notice of Award. Copyright ©2013 National Society of Professional Engineers for EJCDC. All rights reserved. Note: This document was developed based on EJCDC Standard Form Design and Construction Related Documents and has been modified as necessary. EJCDC retains all proprietary rights to these documents.