Loading...
HomeMy WebLinkAbout20-89 Integrated Water Services Part 2B St. Vrain Water 09-23-2020RESOLUTION NO.20-89 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING PART 2B CONSTRUCTION PHASE OF THE TOWN OF FIRESTONE AND INTEGRATED WATER SERVICES, INC.'S ST VRAIN WATER TREATMENT PLANT PROJECT AGREEMENT WHEREAS, by adoption of Resolution No. 1911*54, the Board. of Trustees of.the.Town' of; ,. Firestone ("Board") approved an Agreement between the Town ,of Firestone •aud 11fitegrateo Water Services, Inc., ("IWS") for the St. Vrain Water Treatment Plant Project`(" ioJ ct$) u 1`6 which IWS's first task was to provide design services; and WHEREAS, by adoption of Resolution No. 2011*56, th& Boaid,:,iri :accoitdaijj�p witli.=tl 0; ,I Agreement, entered into Part 2A, initial construction services by. --which tlie•.Town-col' Fires'tM ;,:' ' ("Town") issued IWS a Notice of Award accepted IWS's Price Pro pos41; •execuuted_ a Notice .to Proceed and approved the parties Construction Manager Risk oIt n•Basis iof Cost Plus -Agreement;-: and t ` WHEREAS, IWS is now set to proceed with' Part 2B Constructioi Pliase.tof'iheIt Agreement which requires that the Town issue a Notice of AwardIto 0IWS: NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: The Board of Trustees of the Town of Firestone issues allotice-of Award to Integrated Water Services, Inc., to proceed with Part 2B Construction Phase of the parties St. Vrain Water Treatment Plant Project Agreement. INTRODUCED, READ AND C ` J* Clerlt . Hayashi, Town Attorney tlris%Jdaay of S r , 2020. TOWN /nO�F FIRESTONE, COLORADO � I3o bi Sindel r Mayor Owner: Contractor: Engineer: D-510 — NOTICE OF AWARD (PART 2B: CONSTRUCTION PHASE SERVICES) Town of Firestone d Water Services Plummer Associates, Inc. Project: St. Vrain Water Treatment Plant TO BIDDER: Part 26: Construction Phase Services: You are notified that Owner has accepted Part28 of the Construction Phase eid dated 09/11/2020 for the above Contract, and that you are awarded a Contract for: St. Vrain Water Treatment Plant (Describe Work, Alternates, or Sections of Work Awarded] The Contract Price includes: 1) Cost Plus Fee: a. Cost of Work (minus previous payments by Owner) Part 2A Base Bld b. Cost of Work Part 2A Geotechnical Allowance: c. Cost of Work Part 2A Contingency: d. Cost of Work Part 2A Winter Contingency: e. CMAR Fixed Fee Part 2A: f. Cost of Work (minus previous payments by Owner) Part 2B Base Bid: g. Cost of Work Part 2B Contingency: h. CMAR Fixed Fee Part 2B: $ 4,413,271 $ 92,000 $ 242,487 $ 95,080 $ 436,472 $ 11,021,127 $ 605,610 $ 11091)081 Total Guaranteed Maximum Price (Part 2A plus Part 2B) to Owner for the Cost of the Work including the Cost of Work and the Construction Manager at Risk's Fee will not exceed: $ 17,997,128 1 unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the Contract Documents accompanies this Notice of Award or has been transmitted or made available to Bidder electronically. [revise if multiple copies accompany the Notice of Award] ® a set of the Drawings will be delivered separately from the other Contract Documents. You must comply with the following conditions precedent within calendar days of the date of receipt of this Notice of Award: 1. Deliver to Owner I electronic counterparts of the Agreement, fully executed by Bidder. FRSTN-0305 Page -1 Construction Set -June 2020 EJCDC® D-510, Design -Build Notice of Award. Copyright ©2013 National Society of Professional Engineers for EJCDC. All rights reserved. Note: This document was developed based on EJCDCStandard Form Design and Construction Related Documents and has been modified as necessary. EJCDC retains all proprietary rights to these documents. 2. Deliver with the executed Agreements) the Contract security (e.g., performance and payment bonds] and insurance documentation as specified in the Instructions to Bidders and General Conditions, Articles 2 and 6. 3. Other conons precedent (if any): Failure to comply with these conons wn the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited. Within 10 calendar days after you comply with the above conditions, Owner will return to you one fully executed counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in Paragraph 2.02 of the General Conditions. OWNER Town of Firestone Owner's Name By: Signature c" Date Print Name ' " Title Copy: Engineer FRSTN-0305 Page - 2 Construction Set -June 2020 EJCDC° D-510, Design -Build Notice of Award. Copyright ©2013 National Society of Professional Engineers for EJCDC. All rights reserved. Note: This document was developed based on EJCDC Standard Form Design and Construction Related Documents and has been modified as necessary. EJCDC retains all proprietary rights to these documents.