Loading...
HomeMy WebLinkAbout20-124 Change Order Fransen Pittman Town Hall 12-09-2020RESOLUTION N0.20-124 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING A CHANGE ORDER TO THE CONSTRUCTION AGREEMENT WITH FRANSEN PITTMAN CONSTRUCTION CO., FOR THE CONSTRUCTION OF TOWN HALL PROJECT WHEREAS, by Resolution No. 20-92 the Town of Firestone ("Town") entered into a Construction Services Agreement with Fransen Pittman Construction Co, for the Town Hall Construction Project ("Project"), and WHEREAS, it is now necessary that Fransen Pittman Construction Co, perform additional construction work for the court and Board room Dais to accommodate pandemic circumstances; and WHEREAS, in accordance with the parties Agreement performance of the additional work requires that the Board of Trustees approve a Change Order. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Change Order of the Town Hall Construction Services Agreement between the Town of Firestone and Fransen Pittman Construction Co, is approved in substantially the same form as the copy attached hereto and made a part of this resolution and the Mayor is authorized to execute the Change Order on behalf of the Town. INTRODUCED, READ AND ADOPTED this' day of CR�U! 2020. • i • • ' 6 ' • i ATTEST: APPROVED Pransen Pittman Gcncral Contractors 12/!/2020 B:OS Mf Firestone Police Department -Courtroom FRANSEN Estimate P I TT M A N ESTIMATE DATE: 12/04/20 BUILDING AREA IN SQ FT: 898 EXPECT PRECISION DRAWINGS PREPARED BY: Halcyon Design L DRAWINGS ARE DATED: 12/1/2020 DIV NO DIVISION RECAP 1 _- - - General Conditions 2 Demolition & Sitework 3 Concrete 4 Masonry 5 Metals 6 Carpentry 7 Moisture Protection 8 Doors, Windows &Glass 9 Finishes 10 Specialties 11 Equipment 12 Furnishings 13 Special Construction 14 Conveying Systems 15 Mechanical 16 Electrical DIVISION S PER % OF TOTAL S.F. TTL 1 15,547 $17.31 10.7 13,900 $15.48 9.5% 0 $0.00 0.0 0 $0.00 0.0 0 $0.00 0.0 68,248 $76.00 46.8 0 $0.00 0.0 0 $0.00 0.0 14,600 $16.26 10.0 0 $0.00 0.0 0 $0.00 0.0 0 $0.00 0.0% 0 $0.00 0.0 0 $0.00 0.0 0 $0.00 0.0 20,792 $23.15 14.3 DIRECT COST 133,087 $14s.zo s1.3% State 8 Local Tax O.oO % 0 $0.00 0.0 Use Tax EXCLUDED 0 $0.00 0.0 Permit $Plan Review Fee EXCLUDED � $0.00 0.0% Overhead &Profit s.o% 6,654 $7.41 4.6% Construction Contingency 3.55% 5,000 $5.57 3.4% Performance &Payment Bonds LS 1,065 $1.19 0.7 TOTAL COST $145,806 $162.37 100.0% r.,�e f