HomeMy WebLinkAbout20-124 Change Order Fransen Pittman Town Hall 12-09-2020RESOLUTION N0.20-124
A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE,
COLORADO, APPROVING A CHANGE ORDER TO THE CONSTRUCTION
AGREEMENT WITH FRANSEN PITTMAN CONSTRUCTION CO., FOR THE
CONSTRUCTION OF TOWN HALL PROJECT
WHEREAS, by Resolution No. 20-92 the Town of Firestone ("Town") entered into a
Construction Services Agreement with Fransen Pittman Construction Co, for the Town Hall
Construction Project ("Project"), and
WHEREAS, it is now necessary that Fransen Pittman Construction Co, perform additional
construction work for the court and Board room Dais to accommodate pandemic circumstances;
and
WHEREAS, in accordance with the parties Agreement performance of the additional work
requires that the Board of Trustees approve a Change Order.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
Change Order of the Town Hall Construction Services Agreement between the Town of
Firestone and Fransen Pittman Construction Co, is approved in substantially the same form as
the copy attached hereto and made a part of this resolution and the Mayor is authorized to
execute the Change Order on behalf of the Town.
INTRODUCED, READ AND ADOPTED this' day of CR�U! 2020.
• i • • ' 6 ' •
i
ATTEST:
APPROVED
Pransen Pittman Gcncral Contractors 12/!/2020 B:OS Mf
Firestone Police Department -Courtroom
FRANSEN Estimate
P I TT M A N ESTIMATE DATE: 12/04/20
BUILDING AREA IN SQ FT: 898
EXPECT PRECISION DRAWINGS PREPARED BY: Halcyon Design L
DRAWINGS ARE DATED: 12/1/2020
DIV NO
DIVISION RECAP
1
_- - -
General Conditions
2
Demolition & Sitework
3
Concrete
4
Masonry
5
Metals
6
Carpentry
7
Moisture Protection
8
Doors, Windows &Glass
9
Finishes
10
Specialties
11
Equipment
12
Furnishings
13
Special Construction
14
Conveying Systems
15
Mechanical
16
Electrical
DIVISION
S PER
% OF
TOTAL
S.F.
TTL
1
15,547
$17.31
10.7
13,900
$15.48
9.5%
0
$0.00
0.0
0
$0.00
0.0
0
$0.00
0.0
68,248
$76.00
46.8
0
$0.00
0.0
0
$0.00
0.0
14,600
$16.26
10.0
0
$0.00
0.0
0
$0.00
0.0
0
$0.00
0.0%
0
$0.00
0.0
0
$0.00
0.0
0
$0.00
0.0
20,792
$23.15
14.3
DIRECT COST
133,087
$14s.zo
s1.3%
State 8 Local Tax
O.oO %
0
$0.00
0.0
Use Tax
EXCLUDED
0
$0.00
0.0
Permit $Plan Review Fee
EXCLUDED
�
$0.00
0.0%
Overhead &Profit
s.o%
6,654
$7.41
4.6%
Construction Contingency
3.55%
5,000
$5.57
3.4%
Performance &Payment Bonds
LS
1,065
$1.19
0.7
TOTAL COST
$145,806 $162.37 100.0%