Loading...
HomeMy WebLinkAbout20-02 - adoption of Three Mile PlanRESOLUTION N0.20-02 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, ADOPTING THE THREE MILE PLAN FOR THE TOWN OF FIRESTONE, COLORADO WHEREAS, pursuant to Section 31-12-105(1)(e)5 C.R.S. prior to the completion of any annexation within a three-mile area outside of the municipal boundaries of a municipality ("Three Mile Area"), a municipality is required to have in place a plan ("Three Mile Plan") which generally describes the proposed location, character and extent of certain public facilities, located within the Three Mile Area; and; WHEREAS, the Town of Firestone has enacted, adopted and approved the various plans, documents, ordinances and resolutions (collectively "Plans") listed on "Exhibit A," attached hereto and incorporated herein; and WHEREAS, the Town Board has determined that the Plans, when considered together as a whole, adequately comply with the requirements of state law for the Three Mile Plan for the Town of Firestone, WHEREAS, to ensure that future annexations by the Town of Firestone are completed in compliance with the provisions of state law, the Town Board, by this Resolution, desires to formalize its understanding and intention that the Plans serve as the Three Mile Plan for the Town of Firestone, NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Section 1. The Plans, as described in "Exhibit A," attached hereto and made a part of this resolution, when considered together as a whole, shall constitute the Three Mile Plan for the Town of Firestone required pursuant to Section 3142405(1)(e)(I), C.R.S. (the "Three Mile Plan"). Section 2. The Three Mile Plan is hereby adopted. Section 3. The Three Mile Plan shall be reviewed and revised as may be necessary or advisable, and shall be updated annually, and additional plans maybe added to the Three Mile Plan from time to time, as they are developed and adopted. [SIGNATURES ON FOLLOWING PAGE] INTRODUCED, READ AND ADOPTED this 8t�' day of January, 2020. ATTEST: APPRQ�F�D AS TO FORM: Town Attorney TOWN OF FIRESTONE, COLORADO bi Sinar, Mayor 2 EXHIBIT A TOWN OF FIRESTONE THREE MILE AREA PLAN ELEMENTS Documents as may be amended from time to time: ■ Town of Firestone Municipal Code ■ Town of Firestone 2013 Master Plan ■ Town of Firestone Development Regulations ■ Sump Basin Master Drainage Plan ■ South Weld I-25 Corridor Master Drainage Plan ■ Town of Firestone Design Criteria &Construction Regulations ■ Town of Firestone Parks Design Criteria Manual ■ Town of Firestone Raw Water Irrigation System Master Plan ■ Town of Firestone Potable Master Plan ■ Ordinance 916 —Residential Development Impact Fees & Funds 3