HomeMy WebLinkAbout21-68 Integrated Water Services Construction Pump Station St. Vrain Water Treatment Plant 05-26-2021RESOLUTION N0. 21-05
A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE,
COLORADO, APPROVING AN AGREEMENT BETWEEN THE TOWN OF
FIRESTONE AND INTEGRATED WATER SERVICES INC FOR CONSTRUCTION OF
A PUMP STATION FOR THE ST. VRAIN WATER TREATMENT PLANT
WHEREAS, the Town of Firestone ("Town") has completed the design work for the pump
station through which the Town will transfer treated water from the St. Vrain Water Treatment
Plant to the Town's water distribution system; and
WHEREAS, Integrated Water Services Inc. ("IWS") is under contract with the Town for
construction of the St. Vrain Water Treatment Plant ("Project") and has the expertise to construct
the Project's pump station; and
WHEREAS, in employing IWS the Town will reduce costs and delays resulting from
requesting bids and the Project's Contract Administration Services provider Stantec Consulting
Services Inc ("Stantec") estimated the cost for construction of the pump station and IWS's cost is
approximately $480,000 less than Stantec's estimate; and
WHEREAS, staff recommends that the Board of Trustees therefore approve the agreement
with IWS for construction of the St. Vrain Water Treatment Plant's Pump Station.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
The Pump Station Construction Agreement for the St. Vrain Water Treatment Plant
between Integrated Water Services Inc. and the Town of Firestone is approved insubstantially
the same form as the copy attached hereto and made a part of this Agreement and the Mayor is
authorized to execute the Agreement on behalf of the Town.
INTRODUCED, READ AND ADOPTED this31Q day of YY , 2021.
VJ
c
OOb�
��`•ti�0 TOWN OF FIRESTONE, COLORADO
bi Si lar, Mayor
�i n
J�ssi�a Koenig, CMC, �fClerk
Attorney
SECTION UUMU
NOTICE OF AWARD
Date: May 26, 2021
Project: St Vrain Water Treatment Plant Pump Station
Owner: Town of FirestoneOwner's Contract No.: W2020-9524.02
Contract: Construction Services Engineer's Project No.: 6365-20-500
Bidder: Integrated Water Services, Inc.
Bidder's Address: 4001 North Valley Drive
Longmont, CO 80504
You are notified that your Bid dated May 20, 2021
for the above Contract has been considered. You are the Successful Bidder and are awarded a
Contract for the St Vrain Water Treatment Plant Pump Station Project.
The Contract Price of your Contract is $2,377,900.00.
Three (3) copies of the proposed Contract Documents (except Drawings) accompany this Notice of
Award.
Two (2) of the Drawings will be delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within ten (10) days of the date you receive
this Notice of Award.
1. Deliver to the Owner three (3) fully executed counterparts of the Contract Documents,
2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the
Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01) and Supplementary
Conditions (Paragraph SC-5.01).
Failure to comply with these conditions within the time specified will entitle Owner to consider you in
default, annul this Notice of Award and declare your Bid security forfeited.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed
counterpart of the Contract Documents.
Owner: Town of Firestone
Co
U Ma&
C
Copy to Engine
� C CO
EJCDC C-510 Notice of Award
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.