HomeMy WebLinkAboutCARMA 14-35 - Well Abandonment Report - Kerr McGee - 4/15/2024Casing History Subsequent Report of Abandonment Details: If yes, explain details below If yes, explain details below Yes NoWellbore has Uncemented Casing leaks: NoYesFish in Hole: Estimated Depth:NoYesCasing to be pulled: Other Mechanical ProblemsProduction Sub-economicDryReason for Abandonment: -104.97600640.177558 Longitude: GPS Data: Only Complete the Following Background Information for Intent to Abandon 2.7 09/10/2008GPS Quality Value:Date of Measurement: Latitude: Type of GPS Quality Value:PDOP 90750Field Number:Field Name:WATTENBERG Federal, Indian or State Lease Number: Meridian:668W Range:Township:3N 35Section:QtrQtr: 14-35 Well Number: SWSW County:WELD Location: CARMAWell Name: 05-123-24914-00API Number This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the abandonment is complete, this form shall again be submitted as a Subsequent Report of the actual work completed. The approved intent shall be valid for six months after the approval date, after that period, a new intent will be required. Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration and the proposed configuration with plugs set. A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent Report are a wellbore diagram showing plugs that were set and casing remaining in the hole, the job summaries from all plugging contractors used, including wireline and cementing (third party verification) and any logs that may have been run during abandonment. State of Colorado Energy & Carbon Management Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894 -2109 WELL ABANDONMENT REPORT FORM 6 Rev 11/20 Notice of Intent to Abandon lorena_ruiz@oxy.comEmail: Fax: (970) 336-3535Phone: Zip:80217- 3779 COState:DENVER P O BOX 173779 Contact Name: City: Lorena Ruiz Address: KERR MCGEE OIL & GAS ONSHORE LPName of Operator: 47120ECMC Operator Number: craig.carlile@state.co.usEmail: Tel:(970) 629-8279Name:Carlile, Craig For "Intent" 24 hour notice required, ECMC contact: 04/01/2024 Date Received: Document Number: DE ET OE ES 403737755 Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth CODELL 7448 7468 NIOBRARA 7246 7326 Total: 2 zone(s) Current and Previously Abandoned Zones Type of Well Abandonment Report: Page 1 of 4Date Run: 4/8/2024 Doc [#403737755] Well Name: CARMA 14-35 Technical Detail/Comments: Additional Plugging Information: Perforate and squeeze at 1020ft. with 95 sacks. Leave at least 100 ft. in casing 990 CICR Depth (Cast Iron Cement Retainer) Eagle Buffer: This planned location is located within a bald eagle buffer. Operations will need to be completed outside the timing windows of 12/1 – 7/31 (eagle nest) and/or 11/15 – 3/15 (winter night roost). The eagle nest buffer window can be shortened if the nest has been confirmed fledge for the year by CPW. If work, is planned during either window, HSE will consult with CPW prior to operations beginning. CPW CONSULTATION HAS BEEN COMPLETED. NoYesFlowline/Pipeline has been abandoned per Rule 1105 Type of Cement and Additives Used: *Cementing Contractor: *Wireline Contractor: Cut and Cap Date: inch casingft. of Additional Plugging Information for Subsequent Report Only Casing Recovered: Plug Tagged: Plug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASING Plug Tagged: (Cast Iron Cement Retainer Depth) CICR Depth CICR Depth 2160 4118 CICR Depth7216 sacks cmt on top.withCIBP #5: Depth sacks cmt on top.withsacks cmt on top. CIBP #4: DepthwithCIBP #3: Depth Set sacks in mouse holeSetsacks in rat hole NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate 44Set sacks at surface ft.170ft. to655sacks half in. half out surface casing fromSet65 sacks. Leave at least 100 ft. in casing210ft. with2800Perforate and squeeze at sacks. Leave at least 100 ft. in casing95ft. with4148Perforate and squeeze at sacks. Leave at least 100 ft. in casing95ft. withPerforate and squeeze at 7246 ft. ft. tosks cmt fromSet ft. 930ft. to990sks cmt fromSet5 ft. 2000ft. to2160sks cmt fromSet15 ft. 4155ft. to4118sks cmt fromSet5 ft. 7155ft. to7216sks cmt from5Set sacks cmt on top.withsacks cmt on top. CIBP #2: Depth44with150CIBP #1: Depth Plug Type: NOTE: Two(2) sacks cement required on all CIBPs. Plugging Procedure for Intent and Subsequent Report Casing Type Size of Hole Size of Casing Grade Wt/Ft Csg/Liner Top Setting Depth Sacks Cmt Cmt Btm Cmt Top Status SURF 12+1/4 8+5/8 J-55 24 0 555 640 555 0 VISU 1ST 7+7/8 4+1/2 I-80 11.6 0 7606 635 7606 3442 CBL S.C. 1.1 7+7/8 4+1/2 I-80 11.7 0 7606 350 1475 230 CBL JENKINS, STEVE Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable orders and is hereby approved. ECMC Approved:Date:4/8/2024 I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete. Signed:Print Name:Lorena Ruiz Title:Regulatory Tech Date:4/1/2024 Email:lorena_ruiz@oxy.com Surface Plug Setting Date: Number of Days from Setting Surface Plug to Capping or Sealing the Well: Page 2 of 4Date Run: 4/8/2024 Doc [#403737755] Well Name: CARMA 14-35 10/7/2024Expiration Date: COA Type Description Due to proximity to a mapped wetland, surface water and expected shallow groundwater, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water. Due to close proximity to Residential Building Units (RBUs), prior to commencing operations, at a minimum, the operator will provide an informational sheet to the owners/occupants of the RBUs nearby and adjacent to the parcel with the well. The sheet will include the operator's contact information and the nature, timing, and expected duration of the P&A operations. Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors, odors and noise from plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment. Operator committed to the following Best Management Practices under the Technical Detail/ Comments section on the Submit Tab and in attached communication with CPW: This planned location is located within a bald eagle buffer. Operations will need to be completed outside the timing windows of 12/1 – 7/31 (eagle nest) and/or 11/15 – 3/15 (winter night roost). The eagle nest buffer window can be shortened if the nest has been confirmed fledge for the year by CPW. If work, is planned during either window, HSE will consult with CPW prior to operations beginning. Bald Eagle Winter Night Roost: 11/15 – 3/15 operations only between 10am – 2pm. It is our intent to finish any work in BEWNR prior to 11/15. FLOWLINE AND SITE CLOSURE 1)Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent. 2)Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line. 1) Provide 2 business day notice of plugging MIRU via electronic Form 42, and provide 48 hours Notice of Plugging Operations, prior to mobilizing for plugging operations via electronic Form 42. These are 2 separate notifications, required by Rules 405.e and 405.I. 2) Prior to placing the 655’ plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 3) After isolation has been verified, pump surface casing shoe plug. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 505’ or shallower and provide 10 sx plug at the surface. 4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 5) After cut and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging recording. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed. CONDITIONS OF APPROVAL, IF ANY: Page 3 of 4Date Run: 4/8/2024 Doc [#403737755] Well Name: CARMA 14-35 Prior to starting plugging operations a Bradenhead test shall be performed if there has not been a reported Bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. 6 COAs Attachment List Att Doc Num Name 403737755 WELL ABANDONMENT REPORT (INTENT) 403737839 PROPOSED PLUGGING PROCEDURE 403737841 OTHER 403737851 WELLBORE DIAGRAM 403746662 FORM 6 INTENT SUBMITTED Total Attach: 5 Files User Group Comment Comment Date OGLA Location Assessment Specialist review complete.04/08/2024 Permit selected PDOP from dropdown box Verified as drilled lat/long Verified completed intervals - 12324914(2), 12324914 Verified production reporting pass 04/02/2024 Engineer If any changes during the plugging are needed, please email Steve Jenkins at Steve.Jenkins@state.co.us. Since Curtis has moved over to the UIC group, I am taking over the review and follow up on his Intents. Thanks, Steve 04/01/2024 Engineer 1) Deepest Water Well within 1 mile = 500’. 2) Fox Hills Bottom- 77’, per SB5. 04/01/2024 Total: 4 comment(s) General Comments Page 4 of 4Date Run: 4/8/2024 Doc [#403737755] Well Name: CARMA 14-35