Loading...
HomeMy WebLinkAboutSRC Union A-5CHZ - Notice of Move-In, Rig-Up - PDC Energy - 11/17/2022State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 FIELD OPERATIONS NOTICE FORM 42 Rev 01/21 Document Number: OGCC RECEPTION Receive Date: 11/17/2022 403233497 Karen McBride Signature:Title: Print Name:Email: Date: karen.mcbride@pdce.com I hereby certify all statements made in this form are, to the best of my knowledge, true, correct and complete. 11/17/2022Reg Analyst OGCC Operator Number: City: Company Name: Address: 69175 PDC ENERGY INC 1775 SHERMAN STREET - STE 3000 DENVER Zip:State:80203 Contact Person:Karen McBride Phone: ( ) (303) 860.5800 CO Email: Fax: karen.mcbride@pdce.com Entity Information 05 - 123 - 37398 - 00 432992 432988 Sec:Twp:Range:QtrQtr:5 Lat:Long:2N 68W SWNW 40.170164 -105.035220 API #:Facility ID:Location ID: Facility Name:SRC Union A-5CHZ Submit By Other Operator Update of a previous Form 42 Notice NO NOTICE OF MOVE-IN, RIG-UP Start Date:11/21/2022 Is the estimated duration of operations with this rig on this Location anticipated to last for longer than one day? If YES, describe the estimated anticipated duration of these operations: PDC anticipates sand clean out operations of this well to take 6 days. Time:08:00 (HH:MM) Select the type of rig below. (Only 1 box may be checked) Drilling Rig (Spud Rig) – 2 Business Days Notice Drilling Rig – 2 Business Days Notice X Work-Over Rig, Planned Operations – 2 Business Days Notice Work-Over Rig, Unplanned Operations – notify within 1 Business Day after start Yes The Form 42 shall be submitted as required by Rule, Notice to Operators, Policy, or Condition of Approval. A Form 42 Update shall be submitted to revise the scheduled date or time on a previous Form 42 - Advance Notice of Field Operations. A Form 42 Update must be for the same well, location, or facility and for the same Field Operation as a previous Form 42. NOTE: Operator's Contact for Advance Notices of Field Operations should be available 24 hours a day, 7 days a week and should have the most current scheduling information for the operation. Operator's Contact for other notices should be able to respond to questions regarding the reported information. Date Run: 11/17/2022 Doc [#403233497] Well Name: SRC Union A-5CHZ