HomeMy WebLinkAbout24-57 Construction Contract Maguire Iron, Inc. Water Tower Installation of Safety Improvements 05-15-2024RESOLUTION NO.24-57
A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE,
COLORADO, APPROVING A CONSTRUCTION CONTRACT BETWEEN THE TOWN
OF FIRESTONE AND MAGUIRE IRON INC FOR THE INSTALLATION OF SAFETY
IMPROVEMENTS AT THE TOWN OF FIRESTONES WATER TOWER
WHEREAS, the Town of Firestone's Public Works Department ("PWD") has determined
that to ensure the safety of staff accessing the Town's 1.5MG Water Tower, it is necessary to
install a roof handrail addition to encompass the two roof access hatches and install a cable style
safety climb to the four sections of the ladder on the exterior of the Water Tower; and
WHEREAS, the PWD requested quotes from various vendors and determined that Maguire
Iron Inc, was the most qualified vendor.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
The Construction Contract between the Town of Firestone ("Town") and Maguire Iron,
Inc. for the installation of safety improvements on the Town's Water Tower is approved in
substantially the same form as the copy attached hereto and made a part of this Resolution and
the Mayor is authorized to execute the Contract on behalf of the Town.
INTRODUCED, READ AND ADOPTED this 15'h day of May, 2024.
TOWN OF FIY&5TOIX, COLORADO
on Cony c Jr, yor,
A T
iflaZilruirTl5onzalez, Interim Town Clerk F�RESr
.� O
_
U•Tivoli-�/ OR
CONSTRUCTION CONTRACT
THIS CONSJRUCTION CONTRACT (the "Construction Contract" or "Agreement") is made and
entered into this day of , 2024 (the "Effective Date"), by and between the TOWN OF
FIRESTONE, a Colorado municipal cor ration with an address of 9950 Park Avenue, Firestone, Colorado
80504 (the "Town" or the "Owner"), and MAGUIRE IRON, INC., a South Dakota Corporation, an independent
contractor with a principal place of business at 1610 North Minnesota Ave, Sioux Falls, South Dakota, 57104
("Contractor") (each a "Party" and collectively the "Parties").
WHEREAS, the Town requires services; and
WHEREAS, the Town has found the Contractor to have the expertise and experience to perform the
required services.
NOW THEREFORE, in consideration hereinafter set forth, the receipt and sufficiency of which are
hereby acknowledged, the Parties agree as follows:
SCOPE OF WORK
A. The Contractor shall complete all Work and perform all Services described or reasonably implied
from the Scope of Work set forth in Exhibit A and the Contract Documents, attached hereto and
incorporated herein by this reference and known as: Water Tower Improvement Project.
B. A change in the Scope of Work shall not be effective unless authorized as a modification to this
Agreement or change order in accordance with the Contract Documents. If the Contractor
proceeds without such written authorization, the Contractor shall be deemed to have waived any
claim for additional compensation, including a claim based on the theory of unjust enrichment,
quantum merit or implied contract. Except as expressly provided herein, no agent, employee, or
representative of the Town is authorized to modify any term of this Agreement, either directly or
implied by a course of action.
II. RESERVE
III. CONTRACT TIMES; COMMENCEMENT AND COMPLETION OF WORK
A. The Work shall be substantially completed within 365 days of the Effective Date of this Agreement.
It shall continue until the Contractor completes the Scope of Services to the Town's satisfaction, or
until terminated as provided herein.
B. Either Party may terminate this Agreement upon 30 days advance written notice. The Town shall
pay the Contractor for all Work previously authorized and satisfactorily completed prior to the date
of termination. If, however, the Contractor has substantially or materially breached this Agreement,
the Town shall have any remedy or right of set-off available at law and equity.
C. Should a delay in completion of the project once started constitute a compensable inconvenience
to the Town and its residents, the liquidated damages established in this Section shall be enforced.
Page 1 of 7
FIRESTONE
Such damages are not a penalty, and the parties recognize the delays, expenses, and difficulties
involved in proving the actual loss suffered by the Town if the Work is not completed on time.
Accordingly, instead of requiring such proof the Parties agree that as liquidated damages for each
day that all or a portion of the Work is delayed beyond the deadlines set forth in Section III hereof,
plus any extensions thereof allowed, the Contractor shall be assessed the amount of two hundred
fifty dollars ($250) each day until the Work is complete.
IV. COMPENSATION
In consideration for the completion of the Work by Contractor, the Town shall pay Contractor, subject
to all of the terms and conditions of the Contract Documents, an amount not to exceed $44,000.00
(the "Contract Price"). The Contract Price shall include all fees, costs, and expenses incurred by the
Contractor, and no additional amounts shall be paid by the Town for such fees, costs, and expenses.
V. PAYMENT PROCEDURES
A. The Contractor may submit Applications for Payment for completed Work per the UNIT -PRICE BID
FORM or the LUMP -SUM BID FORM. The Contractor may submit periodic invoices, which the Town
shall pay within 30 days of receipt.
B. The Town may retain up to five percent (5%) of the calculated value of completed work from each
application of payment up until the Construction Contract is completed satisfactorily and finally
accepted by the Town.
C. Upon issuing a final acceptance of the Work for the Project, the Town shall pay to Contractor the
remainder of the funds or monies previously withheld as retainage.
VI. RESPONSIBILITY
A. Contractor hereby warrants that it is qualified to assume the responsibilities and render the services
described herein and has all requisite corporate authority and licenses in good standing, required
by law.
B. The Work performed by Contractor shall be in accordance with generally accepted practices and
the level of competency presently maintained by other practicing contractors in the same or similar
type of Work in the applicable community.
C. The Work performed by the Contractor hereunder shall be done in compliance with applicable laws,
ordinances, rules and regulations, including the Keep Jobs in Colorado Act, CRS 8-17-101, et seq.
(the "Act") and the rules adopted by the Division of Labor of the Colorado Department of Labor and
Employment implementing the Act (the "Rules").
D. The Town's review, approval or acceptance of, or payment for any completed Work shall not be
construed to operate as a waiver of any rights under this Construction Contract or of any cause of
action arising out of the performance of this Construction Contract.
E. The Contractor hereby warrants to the Town that all materials and equipment used in the Work, and
made a part of the Work, or placed permanently in the Work, shall be new unless otherwise specified
in the Contract Documents. The Contractor further warrants that all equipment and materials shall
Page 2 of 7
FIRESTONE
be of good quality, conform to the requirements of the Contract Documents and will be free from
defects. All Work, materials, or equipment not conforming to the Contract Documents shall be
considered defective.
F. The Contractor shall warrant and guarantee all materials and equipment furnished under the
Construction Contract and all Work performed for one year after the date of Substantial Completion.
Under this warranty, Contractor agrees to repair or replace, at its own expense, any Work that is
found to be defective. The expiration of the warranty period shall in no way limit the Town's legal or
equitable remedies, or the period in which such remedies may be asserted, for Work negligently or
defectively performed.
VII. OWNERSHIP
Any materials, items, and Work specified in the Scope of Work, and any and all related
documentation and materials provided or developed by the Contractor shall be exclusively owned by
the Town. The Contractor expressly acknowledges and agrees that all Work performed under the
Scope of Work constitutes a "work made for hire." To the extent, if at all, that it does not constitute
a "work made for hire,' the Contractor hereby transfers, sells, and assigns to the Town all of its right,
title, and interest in such Work. The Town may, with respect to all or any portion of such Work, use,
publish, display, reproduce, distribute, destroy, alter, retouch, modify, adapt, translate, or change
such Work without providing notice to or receiving consent from Contractor.
VIII. INDEPENDENT CONTRACTOR
The Contractor is an independent contractor. Notwithstanding any other provision of this
Construction Contract, all personnel assigned by Contractor to perform Work under the terms of this
Construction Contract shall be, and remain at all times, employees or agents of Contractor for all
purposes. The contractor shall make no representation that it is a Town employee for any purposes.
IX. INSURANCE
A. Contractor agrees to procure and maintain, at its own cost, a policy or policies of insurance sufficient
to insure against all liability, claims, demands, and other obligations assumed by Contractor
pursuant to this Construction Contract. At a minimum, Contractor shall procure and maintain, and
shall cause any subcontractor to procure and maintain, the insurance coverages listed below, with
forms and insurers acceptable to the Town.
1. Worker's Compensation insurance as required by law.
2. Commercial General Liability insurance with minimum combined single limits of $1,000,000
each occurrence and $2,000,000 general aggregate. The policy shall be applicable to all
premises and operations, and shall include coverage for bodily injury, broad form property
damage, personal injury (including coverage for contractual and employee acts), blanket
contractual, products, and completed operations. The policy shall contain a severability of
interests provision, and shall include the Town and the Town's officers, employees, and
contractors as additional insureds. No additional insured endorsement shall contain any
exclusion for bodily injury or property damage arising from completed operations.
Page 3 of 7
FIRESTONE
B. Such insurance shall be in addition to any other insurance requirements imposed by law. The
coverages afforded under the policies shall not be canceled, terminated or materially changed
without at least 30 days prior written notice to the Town. In the case of any claims -made policy, the
necessary retroactive dates and extended reporting periods shall be procured to maintain such
continuous coverage. Any insurance carried by the Town, its officers, its employees, or its
contractors shall be excess and not contributory insurance to that provided by the Contractor. The
Contractor shall be solely responsible for any deductible losses under any policy.
C. Contractor shall provide to the Town a certificate of insurance as evidence that the required policies
are in full force and effect. The certificate shall identify this Construction Contract.
X. INDEMNIFICATION
The Contractor agrees to defend, indemnify and hold harmless the Town and its officers, insurers,
volunteers, representative, agents, employees, heirs, and assigns from and against all claims, liability,
damages, losses, expenses, and demands, including attorney fees, on account of injury, loss, or
damage, including without limitation claims arising from bodily injury, personal injury, sickness,
disease, death, property loss or damage, or any other loss of any kind whatsoever, which arise out
of or are in any manner connected with this Construction Contract if such injury, loss, or damage is
caused in whole or in part by, the act, omission, error, professional error, mistake, negligence,
recklessness or other faults of the Contractor, any subcontractor of Contractor, or any officer,
employee, representative, or agent of Contractor, or which arise out of a worker's compensation
claim of any employee of Contractor or of any employee of any subcontractor of Contractor.
XI. CONTRACT DOCUMENTS
The Contract Documents, which comprise the entire Agreement between the Town and Contractor
concerning the Scope of Services, consist of the following:
A. Exhibit to this Construction Contract:
1. Exhibit A: Scope of Services.
2. Exhibit B: Proposal.
There are no Contract Documents other than those listed above in this Section XII.
XII. CHANGE ORDERS
A. A Change Order is a written instrument issued after execution of the Agreement signed by Town
and Contractor, stating their Agreement, as applicable, upon all of the following:
1. The scope of the change in the Work;
2. The amount of the adjustment to the Contract Price; and
3. The extent of the adjustment to the Contract Times(s).
Page 4 of 7
FIRESTONE
B. All changes in the Work authorized by applicable Change Order shall be performed under the
applicable conditions of the Contract Documents. Town and Contractor shall negotiate in good faith
and as expeditiously as possible the appropriate adjustment such changes.
XIII. MISCELLANEOUS
A. Governing Law and Venue. This Construction Contract shall be governed by the laws of the State
of Colorado, and any legal action concerning the provisions hereof shall be brought in Weld County,
Colorado.
B. No Waiver. Delays in enforcement or the waiver of any one or more defaults or breaches of this
Construction Contract by the Town shall not constitute a waiver of any of the other terms or
obligation of this Construction Contract.
C. Integration. This Construction Contract and any attached exhibits constitutes the entire Agreement
between the Parties, superseding all prior oral or written communications.
D. Third Parties. There are no intended third -party beneficiaries to this Construction Contract.
E. Notice. Any notice under this Construction Contract shall be in weting,and shall be deemed sufficient
when personally presented or sent pre -paid, first class US Mail to the Party at the address set forth
on the first page of this Agreement.
F. Severability. If any provision of this Construction Contract is found by a court of competent
jurisdiction to be unlawful or unenforceable for any reason, the remaining provisions hereof shall
remain in full force and effect.
G. Modification. This Construction Contract may only be modified upon written Agreement of the
Parties.
H. Assignment. Neither this Construction Contract nor any of the rights or obligations of the Parties
shall be assigned by either Party without the written consent of the other.
I. Governmental Immunity. The Town .and its officers, attorneys and employees, are relying on, and
do not waive or intend to waive by any provision of this Agreement, the monetary limitations or any
other rights, immunities, and protections provided by the Colorado Governmental Immunity Act,
CRS § 24-10-101, etseq., as amended, or otherwise available to the Town and its officers, attorneys
or employees.
J. Rights and Remedies. The rights and remedies of the Town under this Construction Contract are in
addition to any other rights and remedies provided by law. The expiration of this Construction
Contract shall in no way limit the Town's legal or equitable remedies, or the period in which such
remedies may be asserted, for Work negligently or defectively performed.
K. Subject to Annual Appropriation. Nothing herein shall constitute a multiple fiscal year obligation pursuant to
Article X, § 20 of the Colorado Constitution. Any financial obligation of the Town is subject to annual
appropriation by its Board of Trustees. Any failure of a Board of Trustees to annually appropriate adequate
monies to finance the Town's obligations under this Agreement shall terminate the Agreement upon
expenditure of the appropriated funds. IN WITNESS WHEREOF, the Parties have executed this Construction
Contract as of the Effective Date.
Page 5 of 7
FIRESTONE
ATTE T:
Mi ' una Gonzalez, Town Clerk
l ,:l, 7 1
/ V
JIM
STATE OF COLORADO
) ss.
COUNTY OF
�IiII�1��C
Maguire Iron, Inc.
By:cm`e.
The foregoing instrument was subscribed, sworn to and acknowledged before me this _ day of
2024 by as of
My commission expires:
(SEAL)
Notary Public
Page 6 of 7
FIRESTONE
C 0 L 0 N A D O
SCOPE OF WORK
Contractor's Duties
During the term of this Construction Contract, the Contractor shall perform the following duties, as
directed by the Town:
• Contractor shall install a roof handrail addition to encompass the 2 (two) roof access
hatches.
o New handrail will be installed from the access point from the roof ladder to beyond
the second access hatch (30 LF) and then back up to the center of the tank (15 LF).
• Contractor shall perform touch-up painting on the exterior of the tank where coatings are
burning from the new railing installed and paint the new railing with the best match of the
current exterior color.
• Contractor shall install a cable style safety climb to each of the 4 (four) sections of the ladder
on the tank exterior.
Page 7 of 7
FIRESTONE
North Minnesota Ave
m Falls, So 57104
'hone: (605) 334-9749
Fax (605) 334-9752
infoQmaguinewater.com
Terms: Net 30 days from acceptance and invoicing, plus applicable sales, use, excise, transfer or similar taxes
required by law. A service charge of 1'/2% per month (annual rate of 18%) will be charged on past due accounts.
During any exterior painting, Owner shall assist in removing any vehicles in the area which might receive paint
damage. Contractor will exercise reasonable care and caution to avoid, but will accept no liability for damage to
antenna, communication, telemetry and/or electrical system(s) which may be attached to the structure. Removal,
repair and/or replacement of the antenna, communication, telemetry and/or electrical system(s) shall be the
responsibility of the Owner. Contractor may apply a temporary surcharge to amounts otherwise payable under
this Agreement to reflect significant cost increases for materials, supplies, and/or fuel during high inflationary
periods. Owner and the authorized agents signing this contract as such agents do hereby expressly warrant that
Owner has authority to make and enter into this contract and that it becomes a party hereto pursuant to a lawful
resolution duly and regularly adopted by the governing board of said Owner pursuant to the applicable statutes of
this State. Customer shall reimburse Company for all travel, meal and entertainment expenses incurred by
Company and its employees in connection with Company's performance under the contract. To the extent that
any meal or entertainment expenses incurred by Company or its employees are subject to the limitation on
deductibility under IRC Section 274(n) (1) and the Regulations thereunder, Customer shall be subject to the
limitation and shall reduce its deduction accordingly. This is included in the contract amount.
The owner will be responsible to the Company for the cost (at current market rates) of any work that has been
performed prior to termination.
HAZARDOUS MATERIAL DISCLAIMER: In the event that hazardous materials are on the water tank and this
L _ rmation is not addressed in the specification or made known to Maguire Iron, Inc. prior to the price or bid
being supplied by Maguire Iron, Inc., any additional means of hazardous material abatement or disposal costs
will be bom upon the Owner.
This constitutes the entire contract. No verbal agreements or additions will be honored. Any amendments or
additions hereto must be in writing and executed by the duly authorized agents and officers of the parties hereto.
IN WITNESS WHEREOF, we have set our hands and seals the day and year above written.
By:
(Name)
(Title)
Date Accepted: Y" tAti , C�om
Upon acceptance, please pi4ld& two (2) signattires and date the agreement.
MAGUIRE IRON, INC.
Chuck Ciaber 12/14/2023
By:
(Authorized Agent) (Date)
0 North Minnesota Ave
oux Falls, So 57104
Phone: (605) 334-9749
Fax: (605) 334-9752
infoQmaguirewater corn
CONTRACT FOR SERVICES
This contract made and entered into this 14 day of December, 2023 , by and between Firestone. CO -
Town of hereinafter called the "Owner' or "Customer" and Maguire Iron, Inc., a South Dakota Corporation with
its principal office located in Sioux Falls, South Dakota, hereinafter called the "Contractor" or "Company" for and
in consideration of the mutual covenants and promises hereinafter contained.
Firestone CO Safety Climb & Roof Railing - 1500MG Standpipe
WITNESSETH:
Contractor agrees to make the following repairs and improvements on the Owners water supply tank, and to
furnish the necessary equipment, labor, material, as well as Workmen's Compensation Insurance and
Contractors Liability Insurance, and to do the work hereinafter stated in a good and workmanlike manner.
Safety Climb
• Contractor will provide and install new exterior galvanized safety climb system meeting current
ANSI and OSHA standards.
Install Roof Handrail Addition
Contract Notes D
• Contractor will install a roof handrail addition to encompass the 2 (two) roof access hatches.
• New hand rail will be installed from the access point from the roof ladder to beyond the second
access hatch (30 LF) and then back up to the center of the tank (15 LF).
• Contractor will perform touch up painting on the exterior of the tank where coatings are burned from
the new railing install and paint new railing with best match to current exterior color.
• Contractor will install a cable style safety climb to each of the 4 (four) sections of ladder on the tank
exterior.
Owner will inspect the work as it progresses and upon completion and acceptance by Owner of the above work,
the sum of $ 44,000.00 plus applicable sales, excise, and/or use tax shall become due and payable in full.