Loading...
HomeMy WebLinkAbout21-40 Pump Procurement Agreement Water Technology Group Inc St. Vrain Water Treatment 03-24-2021RESOLUTION NV. 21-40 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING A PUMP PROCUREMENT AGREEMENT WITH WATER TECHNOLOGY GROUP FOR THE PURCHASE OF PUMPS FOR THE TOWN OF FIRESTONES PUMP STATION WHICH WILL TRANSFER TREATED WATER FROM THE ST. VRAIN WATER TREATMENT PLANT WHEREAS, the Town of Firestone ("Town") is in need of pumps for its proposed pump station through which the Town will transfer treated water from the St. Wain Water Treatment Plant to the Town's water distribution system; and WHEREAS, Water Technology Group is a full service pump supplier which offers technical assistance and maintenance services for their pumps; and WHEREAS, Water Technology Group is the pump provider for the Town's Gould Alluvial Wells, St. Vrain Water Treatment Plant, and Reservoir No.I pump station projects; and WHEREAS, staff recommends, with the support of the Town's Pump Station Design Team and Contractor that Water Technology Group be selected as a sole source provider given its experience, full scope of services and existing involvement with other Town pump station prof ects and NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: The Pump Procurement Agreement between Water Technology Group and the Town of Firestone is approved in substantially the same form as the copy attached hereto and made a part of this Agreement and the Mayor is authorized to execute the Agreement on behalf of the Town. INTRODUCED, READ AND ADOPTED t1,is10ay of , 2021. APPROVED AS TO William SECTION 00510 NOTICE OF AWARD Date: March 24, 2021 Project: St. Vrain WTP Delivery System Pump Procurement Owner: Town of Firestone wner's Contract No.: W2020-9524.01 Contract: Construction Services Engineer's Project No.: 6365-20-500 Bidder: Water Technology Group, a Cogent Company Bidder's Address: 14452 West 44th Ave. Golden, CO 80403 You are notified that your Bid dated for the above Contract has been considered. You are the Successful Contract for the St. Vrain WTP Delivery System Pump Procurement Project, The Contract Price of your Contract is $590,195.00 Bidder and are awarded a Three (3) copies of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Two (2) of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within ten (10) days of the date you receive this Notice of Award. 1. Deliver to the Owner three (3) fully executed counterparts of the Contract Documents. 2. Deliver with the executed Contract Documents the Contract security [Bonds] as specified in the Instructions to Bidders (Article 20), General Conditions (Paragraph 5.01) and Supplementary Conditions (Paragraph SC-5.01). Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award and declare your Bid security forfeited. Within ten days counterpart of tl Copy to Engineer with the above conditions, Owner will return to you one fully executed C�UNT't Town of Firestone EJCDC C-510 Notice of Award Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. 00510-1 of 1 106 of 185