Loading...
HomeMy WebLinkAbout24-71 Approving Work Order 2024-02 re Maint. and Service Agreement between the Town and Water Technology Group 07-24-2024RESOLUTION NO.24-71 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING WORK ORDER 2024-02 REGARDING THE MAINTENANCE AND SERVICE AGREEMENT BETWEEN THE TOWN OF FIRESTONE AND WATER TECHNOLOGY GROUP (A COGENT COMPANY) FOR THE TOWNS WATER PUMP SYSTEMS WHEREAS, by Resolution No. 23-129 the Town of Firestone ("Town") entered into an Agreement with Water Technology Group (a Cogent Company) for maintenance and service of the Town's pump systems for its four raw water pump stations and the one pump system for its potable water pump station; and WHEREAS, the Agreement provides that Water Technology Group may upon the Board of Trustees approval of a Work Order perform major repairs and replacements of the Town's pumps; and WHEREAS, as development within the Town has not progressed as anticipated the demands from the Potable Water Pump Station at the St. Vrain Water Treatment Plant to the Towns's distribution system is less than anticipated; and WHEREAS, the lower flow rates both impair the operation and damage the pumps at the Potable Water Pump Station; and WHEREAS, to address these issues staff has worked with the Water Technology Group to develop a replacement pump that can both better accommodate low flows and future demands upon the operation of the Potable Water Pump Station; and WHEREAS, Water Technology Group can procure and install the new pump for the cost of $112,302.00. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: That Work Order 2024-02 for the procurement and installation of a new pump for the Town's potable water pump station is approved in substantially the same form as attached hereto and made a part of this resolution INTRODUCED, READ AND ADOPTED this 24`h day of July, 2024. ATTEST: Missy Carranco, Deputy Town Clerk APPROVED AS TO RM: William Aa*yas i, TWAttorney ConyakJr, �\c�ESTOI�F 'STOW Sig €� fob i %680WT'� .G�� July 10, 2024 ATTN: Town of Firestone PH: Email: WO 2024-02 Town of Firestone July 24, 2024 Res 24-71 Cogent is pleased to present the following Scope of Supply: cogentcompanies.com Quote: OP-592100112 Project: Firestone - SVWTP - 516734 Subject: Proposal New 75HP Item Description 4ty ExtendedPrice A) Xylem Goulds 7CLC VIC-FLFM, 6 Stage Vertical Turbine Pump 1 Included - 400GPM @ 492' TDH Below - NSF 61 Certified Construction - Fab L 300# Discharge Head - Chesterton 442 Mechanical Seal - 75HP 360ORPM Vertical Solid Shaft Motor 0 3—/460V/60Hz o NRR without Steady Bushing o Bearing and Winding RTDs o Accessory Box o Space Heater, Shaft Grounding Ring, and Insulated Bearings 0 6600' Standard Ambient Derate - Tnemec 21(NSF61) Coating - Bowl, Column, and Head - 1U Certified Performance Test — Bowl Assembly Only, Non -Witness, Lab Motor - Hydrostatic Test — Bowl, Column, and Head - Premium Drawing, Critical Speed Analysis, FEA Head Analysis - Suitable for use with existing can and piping B) Adder for 100HP motor — no change to lead time 1 C) Freight Misc. $1,250.00 D) Installation: Crane services, technician labor, and Start up. Included Includes mobilization and materials for a turnkey installation. Below (Lead time for Field service is TBD) Total: $112,302.00 Subject to Cogent, Inc. Standard Terms & Conditions of Sale. Quote valid for 30 days. The existing pump will be brought to our service facility in Golden CO for inspection and repair estimate. Submittals: 4-6 weeks after PO approval if needed. Delivery: 19-24 weeks after submittal approval NOTES: Selections based on information provided; anything not listed above is not included in price. Changes to design point and/or CQSPER Firestone — SVwTP - 516734 Cogent, Inc. 7/10/2024 OP-592100112 equipment specifications are subject to re -quote. Taxes not included. Freight is not included. Items not included in the above package: Installation labor, anchor bolts, gauges, control panels, seal or packing flush hardware, video equipment/taping, lubricants, special paint or paint preparation, local taxes, noise or vibration testing, wiring, conduits, field startup, hatch, ladder, lifting chain, shackles, floats, additional factory testing or items not listed in the above proposal. Startup and commissioning service, in addition to any quoted above, is subject to re -quote. Regards, Brandon Cole Service and Aftermarket Sales CELL: 303-888-7265 BCole@cogentcompanies.com Bret Bernarding Inside Engineered Sales PH:303-524-6930 bbernarding@cogentcompanies.com DENVER s �I Cf D = O (b C 8 n Z u A n o s' 1g N (— �0 o as w o - to G N o - m � � z r� tv Tl -- a o i � C6 M 8 % U> n) sm 40 � II 3 1—T rrv<oo rr. rra aos Fr. II II 1O 11 FT. a <33 FT <nFT �BJ 09 ,fix _______ ___ —_- _ ____ u ---- --- - ---N m m_ g o E m a O mb ,, 7 1f t90 I^ Li 89V - -- Li -LC LJ il m�o 61 9; z I ¢PUMP 89 Rps STATION PACKAGE a s o„�� TOWN OF FIRESTONE `T FIRESTONE, WELD COUNTY COLORADO (') n