HomeMy WebLinkAbout24-70 Approving Work Order 2024-01 re Maint. and Service Agreement with Water Technology Group for Water Pump Systems 07-24-2024RESOLUTION NO.24-70
A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE,
COLORADO, APPROVING WORK ORDER 2024-01 REGARDING THE
MAINTENANCE AND SERVICE AGREEMENT BETWEEN THE TOWN OF
FIRESTONE AND WATER TECHNOLOGY GROUP (A COGENT COMPANY) FOR
THE TOWNS WATER PUMP SYSTEMS
WHEREAS, by Resolution No. 23-129 the Town of Firestone ("Town") entered into an
Agreement with Water Technology Group (a Cogent Company) for maintenance and service of
the Town's pump systems for its four raw water pump stations and the pump system for its potable
water pump station; and
WHEREAS, the Agreement provides that Water Technology Group may upon the Board
of Trustees approval of a Work Order perform major repairs and replacements of the Town's
pumps; and
WHEREAS, one of the pumps in the Town's potable water pump station that delivers water
from the St. Vrain Water Treatment Plant to the Town's distribution system is in need of repair;
and
WHEREAS, the Water Technology Group can remove the pump, transport it to their shop
for repair and reinstall the pump for an estimated cost of $67, 944.00; and
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
That Work Order 2024-01 for the repair of one of the pumps at the Town's potable water
pump station is approved in substantially the same form as attached hereto and made a part of
this resolution
INTRODUCED, READ AND ADOPTED this 241h day of July, 2024.
M
Missy Carranco, Deputy Town Clerk
APPROVED AS TO F M:
NAL
William , . *ayas T Attorney
TOWN_ _ OF FI_RI
on Con
TowN
�A Q
ti 0
X�UNT`(,.G�v
x
WATER
TECHNOLOGY
GROUP
A COGENT COMPANY
To: Town of Firestone Colorado
Reference: WTP Pump #2 repair estimate
Proposal: OP-592100R3
Date: 7/10/2024
sog..td-pani-e..
We are pleased to offer the estimate below for the repair of you Floway Vertical Turbine Pump.
Please call me with any questions or concerns.
Farts Required
Motor Repair
Hex Head Cap Screw
Hex Head Cap Screw
Hex Head Cap Screw
Cast Iron Wear Rings
Line shafting
Bowl Shaft
Bearing Retainer
Head Shaft Coupling
Rubber Line shaft Bearing
Line Shaft Sleeve
Line Shaft Coupling
Stuffing Box O-Ring
Motor Shaft
Stuffing Box Seal
Bowl Bearings
Suction Bearing
Stuffing Box Bearing
Slinger
Tnemec Epoxy Coating
Sandblasting
Crane Rental
This is an estimate of repairs in good faith. We will quote anything not mentioned above after the
Disassembly and inspection of your pump.
Your Total Net Cost: --------------------------------------------------------------------- $67,944.00
Notes and clarifications
1. Equipment selection is based on information provided
2. Anything not listed above is not included and will be quoted as a change order.
3. Taxes are not included in the pricing
4. Lead time, 16-18 weeks ARO (Estimated we will have a better idea after the shop inspection)
5. Freight charges are not included.
6. Quote is valid for 30 days
Best regards,
Brandon Cole
Service and Aftermarket
Water Technology Group.
303-888-7265
OOVHOIO AlNflOO(MM'MOIS38IJ
a30NOIS381JJONMOi
u IN 0 , VOSNnt
-------------------
------------------------
I
FF- =fl
E
l E M
��\
\\
-0
F
>(D
CO
C,
0
8
0 LL
>
c)
2
\
T-
0
3
Lu :3
0