WHEREAS, the Town of Firestone ("Town") is in need of construction services for its
Public Works Facility Expansion and Remodel Project ("Project"), and
WHEREAS, the Project involves the addition of 8,000sf of shop area to the south of the
existing building and on the north end, reconfiguring the existing office and restroom area w for
larger restrooms, added offices, and an enlarged break room, reconstructing the existing wood -
framed mezzanine into a larger area to include offices and general storage, and installing over
3,000 LF of a sanitary sewer service to connect the facility; and
WHEREAS, B1ueScope Construction is uniquely qualified and has the skill and experience
to perform the required services for the Project.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
The Construction Services Agreement between the Town of Firestone and B1ueScope
Construction is approved in substantially the same form as the copy attached hereto and made a
part of this resolution, and the Mayor is authorized to execute the Agreement on behalf of the
Town.
INTRODUCED, READ AND ADOPTED this���ay of � , 2021.
ATTEST:
APPROVED AS TO
William P'
�Ob
WELO
To3D� Clerk
TOWN
Bobbi Sindelar,
CONSTRUCTION CONTRACT
THIS CONSTRUCTION CONTRACT (the "Construction Contract" or "Agreement") is made and
entered into thisiay of 2021 (the "Effective Date"), by and between the TOWN OF
FIRESTONE, a Colorado municipal corporation with an address of 151 Grant Avenue, P.O. Box 100,
Firestone, Colorado 80520 (the "Town" or the "Owner"), and BLUESCOPE CONSTRUCTION, INC. -
GOVERNMENT SERVICES an independent contractor with a principal place of business at 1540 Genessee
Street, Kansas City, Missouri 64102 ("Contractor") (each a "Party" and collectively the "Parties").
WHEREAS, the Town requires services; and
WHEREAS, Contractor has held itself out to the Town as having the requisite expertise and
experience to perform the required services.
NOW THEREFORE, for the consideration hereinafter set forth, the receipt and sufficiency of which
are hereby acknowledged, the Parties agree as follows:
I. SCOPE OF WORK
A. Contractor shall complete all Work and perform all Services which are described or reasonably
implied from the Scope of Work set forth in Exhibit A and the Contract Documents, attached hereto
and incorporated herein by this reference and known as: Public Works Facility Expansion and
Remodel Design (132020-9106).
B. A change in the Scope of Work shall not be effective unless authorized as a written
amendment to this Agreement or change order in accordance with the Contract Documents, If Contractor
proceeds without such written authorization, Contractor shall be deemed to have waived any claim for
additional compensation, including a claim based on the theory of unjust enrichment, quantum merit or
implied contract. Except as expressly provided herein, no agent, employee, or representative of the Town is
authorized to modify any term of this Agreement, either directly or implied by a course of action.
C. Within 10 days of the Effective Contract Date, Contractor shall provide the performance bond
and labor &material payment bond and certificate of insurance required by the contract Documents.
II. DESIGN PROFESSIONAL
This Project has been designed by: Halcyon Design LLC, who is hereinafter called DESIGN
PROFESSIONAL and who is to act as FIRESTONE's representative, assume all duties and responsibilities
and have the rights and authority assigned to DESIGN PROFESSIONAL in the Contract Documents in
connection with completion of the Work in accordance with the Contract Documents.
Page 1 of 12
FIRESTONE
III. CONTRACT TIMES; COMMENCEMENT AND COMPLETION OF WORK
A. The Work shall be substantially completed within 210 days of the Effective Date of this
contract, and shall continue until Contractor completes the Scope of Services to the reasonable satisfaction
of the Town, or until terminated as provided herein.
Be Either Party may terminate this Agreement upon 30 days advance written notice. The Town
shall pay Contractor for all work previously authorized and completed prior to the date of termination. If,
however, Contractor has substantially or materially breached this Agreement, the Town shall have any
remeAy or right ofset-off available at law and equity.
C. Should a delay in completion constitute a compensable inconvenience to the Town and its
residents, the liquidated damages established in this Section shall be enforced. Such damages are not a
penalty, the parties recognize the delays, expense and difficulties involved in proving the actual loss suffered
by the Town if the Work is not completed on time. For each day that all or a portion of the Work is delayed
beyond the deadlines set forth in Section III hereof, plus any extensions thereof allowed, the Contractor shall
be assessed the amount of two hundred fifty dollars ($250) each day until the Work is complete.
IV. COMPENSATION
Inconsideration for the completion of the Work by Contractor, the Town shall pay Contractor, subject
to all of the terms and conditions of the Contract Documents, an amount not to exceed $3,221,509.00 (the
"Contract Price"). The Contact Price shall include all fees, costs and expenses incurred by Contractor, and
no additional amounts shall be paid by the Town for such fees, costs and expenses.
V. PAYMENT PROCEDURES
Contractor may submit Applications for Payment for completed work per the proposal attached in
Exhibit A. Contractor may submit periodic invoices, which shall be paid by the Town within 30 days of receipt.
VI. RESPONSIBILITY
A. Contractor hereby warrants that it is qualified to assume the responsibilities and render the
services described herein and has all requisite corporate authority and licenses in good standing, required
bylaw.
Be
The Work performed by Contractor shall be in accordance with generally accepted practices
anA the level of competency presently maintained by other practicing contractors in the same or similar type
of work in the applicable community.
C. The Work performed by Contractor hereunder shall be done in compliance with applicable
laws, ordinances, rules and regulations, including the Keep Jobs in Colorado Act, C.R.S. &17-101, et seq.
the "Act") and the rules adopted by the Division of Labor of the Colorado Department of Labor and
Employment implementing the Act (the "Rules").
Page 2 of 12
FIRESTONE
D. The Town's review, approval or acceptance of, or payment for any completed Work shall not
be construed to operate as a waiver of any rights under this Construction Contract or of any cause of action
arising out of the performance of this Construction Contract.
E. Contractor hereby warrants to the Town that all materials and equipment used in the Work,
and made a part of the Work, or placed permanently in the Work, shall be new unless otherwise specified in
the Contract Documents. Contractor further warrants that all equipment and materials shall be of good
quality, conform to the requirements of the Contract Documents and will be free from defects. All Work,
materials, or equipment not conforming to the Contract Documents shall be considered defective.
F. The Contractor shall warrant and guarantee all materials and equipment furnished under the
Contract and all Work performed for one year after the date of Substantial Completion. Under this warranty,
Contractor agrees to repair or replace, at its own expense, any Work that is found to be defective. The
expiration of the warranty period shall in no way limit the Town's legal or equitable remedies, or the period in
which such remedies may be asserted, for work negligently or defectively performed.
VII. OWNERSHIP
A. Any materials, items, and work specified in the Scope of Work, and any and all related
documentation and materials provided or developed by Contractor for the project shall be exclusively owned
by the Town. Contractor expressly acknowledges and agrees that all work performed under the Scope of
Work constitutes a "work made for hire." To the extent, if at all, that it does not constitute a "work made for
hire," Contractor hereby transfers, sells, and assigns to the Town all of its right, title, and interest in such
work. The Town may, with respect to all or any portion of such work, use, publish, display, reproduce,
distribute, destroy, alter, retouch, modify, adapt, translate, or change such work without providing notice to
or receiving consent from Contractor
VIII. INDEPENDENT CONTRACTOR
Contractor is an independent contractor. Notwithstanding any other provision of this Construction
Contract, all personnel assigned by Contractor to perform work under the terms of this Construction Contract
shall be, and remain at all times, employees or agents of Contractor for all purposes. Contractor shall make
no representation that it is a Town employee for any purposes.
IX. INSURANCE
A. Contractor agrees to procure and maintain, at its own cost, a policy or policies of insurance
sufficient to insure against all liability, claims, demands, and other obligations assumed by Contractor
pursuant to this Construction Contract. At a minimum, Contractor shall procure and maintain, and shall cause
Page 3 of 12
FIRESTONE
any subcontractor to procure and maintain, the insurance coverages listed below, with forms and insurers
acceptable to the Town.
1. Worker's Compensation insurance as required by law.
2. Commercial General Liability insurance with minimum combined single limits of $1,000,000
each occurrence and $2,000,000 general aggregate. The policy shall be applicable to all premises
and operations, and shall include coverage for bodily injury, broad form property damage, personal
injury (including coverage for contractual and employee acts), blanket contractual, products, and
completed operations. The policy shall contain a severability of interests provision, and shall include
the Town and the Town's officers, employees, and contractors as additional insureds. No additional
insured endorsement shall contain any exclusion for bodily injury or property damage arising from
completed operations.
B. Such insurance shall be in addition to any other insurance requirements imposed by law.
The coverages afforded under the policies shall not be canceled, terminated or materially changed without
at least 30 days prior written notice to the Town. In the case of any claims -made policy, the necessary
retroactive dates and extended reporting periods shall be procured to maintain such continuous coverage.
Any insurance carried by the Town, its officers, its employees, or its contractors shall be excess and not
contributory insurance to that provided by Contractor. Contractor shall be solely responsible for any
deductible losses under any policy.
C. Contractor shall provide to the Town a certificate of insurance as evidence that the required
policies are in full force and effect. The certificate shall identify this Construction Contract,
X. INDEMNIFICATION
Contractor agrees to indemnify and hold harmless the Town and its officers, insurers, volunteers,
representative, agents, employees, heirs and assigns from and against all claims, liaty, damages, losses,
expenses and demands, including attorney fees, on account of injury, loss, or damage, including without
limitation claims arising from bodily injury, personal injury, sickness, disease, death, property loss or damage,
or any other loss of any kind whatsoever, which arise out of or are in any manner connected with this
Construction Contract if such injury, loss, or damage is caused in whole or in part by, the act, omission, error,
professional error, mistake, negligence, or other fault of Contractor, any subcontractor of Contractor, or any
officer, employee, representative, or agent of Contractor, or which arise out of a worker's compensation claim
of any employee of Contractor or of any employee of any subcontractor of Contractor.
Page 4 of 12
f�
FIRESTONE
XI. WAIVER OF CONSEQUENTIAL DAMAGES
The Town and Contractor waive all rights against each for the recovery of consequential damages
either party may have incurred.
XII. ILLEGAL ALIENS
A. Certification. By entering into this Construction Contract, Contractor hereby certifies that, at
the time of this certification, it does not knowingly employ or contract with an illegal alien who will perform
work under this Construction Contract and that Contractor will participate in either the E-Verify Program
administered by the U.S. Department of Homeland Security and Social Security Administration or the
Department Program administered by the Colorado Department of Labor and Employment to confirm the
employment eligibility of all employees who are newly hired to perform work under this Construction Contract.
B. Prohibited Acts. Contractor shall not knowingly employ or contract with an illegal alien to
perform work under this Construction Contract, or enter into a contract with a subcontractor that fails to certify
to Contractor that the subcontractor shall not knowingly employ or contract with an illegal alien to perform
work under this Construction Contract.
C. Verification.
1. If Contractor has employees, Contractor has confirmed the employment eligibility of all
employees who are newly hired to perform work under this Construction Contract through
participation in either the E-Verify Program or the Department Program.
2. Contractor shall not use the E-Verify Program or Department Program procedures to
undertake pre -employment screening of job applicants while this Construction Contract is being
performed.
3. If Contractor obtains actual knowledge that a subcontractor performing work under this
Construction Contract knowingly employs or contracts with an illegal alien who is performing work
under this Construction Contract, Contractor shall: notify the subcontractor and the Town within 3
days that Contractor has actual knowledge that the subcontractor is employing or contracting with
an illegal alien who is performing work under this Construction Contract; and terminate the
subcontract with the subcontractor if within 3 days of receiving the notice required pursuant to
subsection 1 hereof, the subcontractor does not stop employing or contracting with the illegal alien
who is performing work under this Construction Contract; except that Contractor shall not terminate
the subcontract if during such 3 days the subcontractor provides information to establish that the
subcontractor has not knowingly employed or contracted with an illegal alien who is performing work
under this Construction Contract.
Page 5 of 12
FIRESTONE
D. Duty to Comply with Investigations. Contractor shall comply with any reasonable request by
the Colorado Department of Labor and Employment made in the course of an investigation conducted
pursuant to C.R.S. § 8-1 7.5-1 02(5)(a) to ensure that Contractor is complying with the terms of this Section
E. Affidavits. If Contractor does not have employees, Contractor shall sign the "No Employee
Affidavit" attached hereto. If Contractor wishes to verify the lawful presence of newly hired employees who
perform work under the Construction Contract via the Department Program, Contractor shall sign the
"Department Program Affidavit" attached hereto.
XIII. FORCE MAJEURE
Neither Party shall be liable for a delay in the performance of one or more of its obligations under the
this Contract due to forces beyond its control, including, without limitation, strikes, epidemic, pandemic, work
stoppages, accidents, acts of war or terrorism, civil or military disturbances, nuclear or natural catastrophes
or acts of God, and COVID-19 infections in the United States or state or federal governmental orders or
recommendations relating to COVID-19.
XIV. CONTRACT DOCUMENTS
The Contract Documents, which comprise the entire agreement between the Town and Contractor
concerning the Scope of Services, consist of the following:
A. Exhibit to this Construction Contract:
1. Exhibit A: BSC Proposal. Dated 3/26/2021
B. Performance Bond and Labor &Material Payment Bond.
There are no Contract Documents other than those listed above in this Section XIII.
XV. CHANGE ORDERS
A. A Change Order is a written instrument issued after execution of the Agreement signed by
Town and Contractor, stating their agreement, as applicable, upon all of the following:
a. The scope of the change in the Work;
b. The amount of the adjustment to the Contract Price; and
c. The extent of the adjustment to the Contract Times(s).
Page 6 of 12
FIRESTONE
B. All changes in the Work authorized by applicable Change Order shall be performed under
the applicable conditions of the Contract Documents. Town and Contractor shall negotiate
in good faith and as expeditiously as possible the appropriate adjustment such changes.
XVI. MISCELLANEOUS
A. Governing Law and Venue. This Construction Contract shall be governed by the laws of the
State of Colorado, and any legal action concerning the provisions hereof shall be brought in Weld County,
Colorado.
B. No Waiver. Delays in enforcement or the waiver of any one or more defaults or breaches of
this Construction Contract by the Town shall not constitute a waiver of any of the other terms or obligation of
this Construction Contract.
C. Integration. This Construction Contract and any attached exhibits constitutes the entire
agreement between the Parties, superseding all prior oral or written communications.
D. Third Parties. There are no intended third -party beneficiaries to this Construction Contract.
E. Notice. Any notice under this Construction Contract shall be in writing, and shall be deemed
sufficient when directly presented or sent pre -paid, first class U.S. Mail to the Party at the address set forth
on the first page of this Agreement.
F. Severability. If any provision of this Construction Contract is found by a court of competent
jurisdiction to be unlawful or unenforceable for any reason, the remaining provisions hereof shall remain in
full force and effect.
G. Modification. This Construction Contract may only be modified upon written agreement of
the Parties.
H. Assignment. Neither this Construction Contract nor any of the rights or obligations of the
Parties shall be assigned by either Party without the written consent of the other.
I. Governmental Immunity. The Town and its officers, attorneys and employees, are relying
onI and do not waive or intend to waive by any provision of this Agreement, the monetary limitations or any
other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, C.R.S. § 24-
10-101, et seq., as amended, or otherwise available to the Town and its officers, attorneys or employees.
J. Rights and Remedies. The rights and remedies of the Town under this Construction
Contract are in addition to any other rights and remedies provided bylaw. The expiration of this Construction
Contract shall in no way limit the Town's legal or equitable remedies, or the period in which such remedies
may be asserted, for work negligently or defectively performed.
Page 7 of 12
FIRESTONE
K. Subject to Annual Appropriation. Consistent with Article X, § 20 of the Colorado Constitution,
any financial obligation of the Town not performed during the current fiscal year is subject to annual
appropriation, shall extend only to monies currently appropriated, and shall not constitute a mandatory
charge, requirement, debt or liability beyond the current fiscal year.
Page 8 of 12
t^ �
FIRESTONE
Date.
IN WITNESS WHEREOF, the Parties have executed this Construction Contract as of the Effective
Koenig CMC, T
APPROVED AS TO FO
William P. Hayashi, Town
STATE OF E-OL-E3f�tflE3 )
MISSOURI )
ss.
COUNTY OF Jackson )
OF FIRESTONE, COLORADO
Bobbi Slfidelar
BLUESCOPE CONSTRUCTION, INC.
GOVERNMENT SERVICES
14
Brian Air
ich
Director, Government Services
The foregoing instrument was subscribed, sworn to and acknowledged before me this�day of
April , 2021, by Brian Aldrich aS Director, Government Svcs Of
BlueScope Construction. Inc..
I!�y commission expires:/I1citr'dVl+��
(SEAL)
Notary Public
Page 9 of 12
SHARON K. ISAACS
Notary Public -Notary Seal
STATE OF MISSOURI
Commissioned for Jackson County
My Commission Expires: March 11, 2025
ID*#13458679
FIRESTONE
NO EMPLOYEE AFFIDAVIT
To be completed only if Contractor has no employees
1. Check and complete one:
❑ I,
am a
I do not currently employ any i
during the term of my Agreement with the Town of Firestone NI
lawful presence verification requirements outlined in that A
❑ I,
sole proprietor
duals. Should I
corporation, limited liability company], tha d currently empl
individuals during the term of my Agreer thIlAe T/esident.
verification requirements outlined in th�gr ement.
2. Check one. O
❑ I am a United States citiz or legal permanen
I certify th
doing business as
�m by any employees
I will comply with the
sole ,owner/member/shareholder of
� [specify type of entity — i.e.,
ny individuals. Should I employ any
I will comply with the lawful presence
The Town must verify this statement by reyfewing one of the following items:
■ A valid Colorado driver's lice e or a Colorado identification card;
■ A United States military ca or a military dependent s identification card;
■ A United States Coast and Merchant Mariner card;
■ A Native American tri I document,
■ In the case of a re dent of another state, the driver's license or state -issued identification
card from the st of residence, if that state requires the applicant to prove lawful presence
lother
ance of the identification card; or
■ cuments or combination of documents listed in the Town's "Acceptable
or Lawful Presence Verification" chart that prove both Contractor's
ful presence and identity.
OR
I am oth present in the United States pursuant to federal law.
must verify this statement through the federal Systematic Alien Verification of Entitlement
program, and provide such verification to the Town.
Date
Page 10 of 12
FIRESTONE
DEPARTMENT PROGRAM AFFIDAVIT
To be completed only if Contractor participates in the Department of Labor Lawful Presence
I, , as a public contra contract with the
"Town"), hereby affirm that: _ OP
I have examined or will exam
for employment to perform work under
20 days after such hiring date;
2.
Agreement; and
I have reta' P
retain file
ment and iden
I work
contract for
of Firestone (the
fall employees who are newly hired
("Agreement") with the Town within
co ' s of all documents required by 8 U.S.C. § 1324a, which
of newly hired employees who perform work under this
3. I have not twill not alter or falsify the identification documents for my newly hired
employees who pe
Signatu
STATE OF COLORADO
COUNTY OF
under this Agreement.
ss.
Date
The foregoing instrument was subscribed, sworn to and acknowledged before me this
2020, by as
My commission expires:
(SEAL)
Notary Public
Page 11 of 12
FIRESTONE
EXHIBIT A
March 26, 2021 Proposal
Page 12 of 12
FIRESTONE
400*0
BLUESCOPE
CONSTRUCTION
March 26, 2021
Ms. Raelynn Ferrero
Town of Firestone
151 Grant Avenue
Firestone, CO 80520
RE: Public Works Building Addition Proposal
Firestone, CO
Dear Raelynn:
BlueScope Construction, Inc.
1540 Genessee Street
Kansas City, MO 64102
P.O. Bax 419917
Kansas City, MO 64141
Telephone: 816, 245.6000
facsimile: 816,245.6099
wrvw.bluescopeconstr uction.com
BlueScope Construction is pleased to present our proposal for the above referenced facility. Our history of service includes
the successful competition of over 1,000 projects without termination, litigation or liquidated damages. We hope this type of
service history will be part of the evaluation of each competitive offer as you review "best value" for this project. We look
forward to offering our service to your agency for this new facility.
By purchasing this facility through the Sourcewell contract, you can buy the building and construction services without going
through the traditional bid process, saving you time and money. Additionally, the design -build process is collaborative and
ensures you get the facility you desire at the price you have funded. Under this offering, we provide a firm fixed price so you
can avoid the high cost of multiple change orders. You'll still get the local execution on the project you desire along with
factory -direct pricing on the building shell. You'll find this method is much easier than typical procurement methods and helps
you avoid the pitfalls of the low bid process.
As General Contractor, BlueScope Construction is teaming with Baker Builders local builder in the role of Prime
Subcontractor. As the prime subcontractor Baker Builders will be responsible for coordinating all local on -site vendors, trades
and subcontractors This is our typical project approach, utilizing local specialists known and trusted to perform at a high level
of quality and service. We believe this approach will be the best value: national experience and oversight from BlueScope
Construction and local presence and small business participation from Baker Builders.
We believe our proposal is the best value based on the following:
• BlueScope Construction is the preeminents"Pr lierof pre-engineered buildings (PEB) with multiple North American
manufacturing plants. BlueScope Buildings a member of the Metal Building Manufacturers Association, Design -Build
Institute, and US Green Building Council.
• BlueScope Building PEB brands, including Varco Pruden Buildings, are the world's most popular brands with more
total in -place square footage than any other manufacturer.
• As part of BlueScope Buildings, BlueScope Construction offers factory -direct pricing on the PEB at most favored
customer pricing.
• BlueScope Construction is a national contractor with a direct connection to a local general contractor network
giving you a local presence and small business participation on your project.
• Our experienced team has built over 1,000 government projects.
• We offer unparalleled customer service with more than 85% of our business each year from repeat customers.
• BlueScope Construction and BlueScope Buildings have outstanding quality control and the capability to build to
the highest levels of construction performance.
Copyright. BlueScope Construdw, Inc. 2021, This Proposal contains information confidential and proprietary to BlueScope Confection, Inc. Anyinbrnation, data and drawings
included in this Proposal are supplied to yvu Mh the understanofng that they will be held confidentially, used only for the purpose ofevabating this Proposal, and m7l not be disdosed
to third parties without the prior written consent of BlueScope ConstrudbR, Inc.
3-26-2021
Page 2 of 2
For these and many other reasons noted throughout this proposal, we believe you will receive the best value building by
utilizing BlueScope Construction, Attached are the Scope of Work, Schedule of Values, and proposal schedule to complete
our proposal. Please note that this offer is based on a design -build solution and the Scope of Work defines the intent of our
proposed offer to furnish and install this Project for the price listed on the Schedule of Values document as per our Sourcewell
purchasing cooperative contract vehicle.
Thank you for your interest in our BlueScope Construction team and our Sourcewell contract for your facy needs.
We welcome any questions or comments you may have regarding this proposal. Please contact Rasa at the number stated
below.
Regards,
Rasa Kozak
Project Manager
Phone: 816.245.6421
Cell: 816.681.4328
rasa.kozak cDbluescopeconstruction,com
)w
Brian Aldrich
Director, Government Services
Phone: 816.245.6886
Fax: 816,24546899
bnaldrich6 bluescopeconstruction.com
Copyright: BlueScx�pe Construdan, Ina 2021. This Proposal contains information confic'ential and proprietary to BlueSocrpe Ca>sbuction, Inc. Myinformation, data and drawings
included in this Proposal are supplied to yixr with tl�e urxlerstanding that they will be held cnnfidenGally, used orYy fortlre purpo� ofevaluating this Proposal, and will not be d�sdosed
to third parties without the prrorwmten consent of B1ueSc�oe Conshudia�,Inc.
Town of Firestone
Firestone, CO
20616 — Public Works Building Addition
26 March 2021
ATTACHMENT A
SCOPE OF WORK
VARCO PRUDEN BUILDING MATERIALS
Division 13—SPECiA . CONSTRUCTION
VARCOV/IPRUDEN
Building Structural System
General
The Building Structural System furnished by Varco Pruden 1 BlueScope Construction shall be as follows:
Structural Type Description —General
Pre-engineered Building Systems (PEB)
The design of the Rigid Frame System (RF) (a clear span structural system), shall consist of a rigid frame with tapered or
straight exterior columns and tapered or straight roof beams. Roof beams will be solid web.
The endwall of the structural systems consist of rigid frames. Depending on the design requirements, endwalls do not have load
capacity included for future bung expansion.
In the longitudinal direction of these structural systems, rod bracing, portal frames will be used to resist lateral loads.
This primary framework supports roof structurals and wall structurals, which, in turn, support the roof panels and wall panels,
respectively. Roof structurals will consist of cold form Zs and or Cs appropriately designed to meet design criteria. The wall
structurals consist of cold form Z's or C's designed to resist horizontal loads from the walls.
Unless specified otherwise, BlueScope Construction will determine the structural system and the type and configuration of
components that make up the structural system that satisfy the requirements necessary to meet codes, loads, building layout and
clearances.
Copyright:
BlueScope Construction, Inc. 2021. Any information,
data and drawings inGuded
in this Proposal are supplied to you
with the understanding that they will
be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disGosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
Design Criteria
Building Code International Building • • -
Edition (Year)2446
Use Category _Standard Occupancy
Roof Loa_ ds/Other Building Shell Loads
Live Load 20 •sf (reducible per code)
Structural Dead Load 5 •sf (or actualmwhiche vergreater)
Ground Snow Load •
Collateral Load - Basic •
Wind Speed 107 mph• •
Wind Enclosure • • •
Seismic Acceleration
Factory Mutual (FM) requirement •
Deflection/Sidesway Criteria
Deflection -roof beams U180 (Live load
Sidesway frames Uff year wind)
Deflection -roof structurals • • •
Deflection -wall structurals •
Structural Steel Design
All structural mill sections or welded -up plate sections shall be designed in accordance with the loth Edition of the AISC
Specifications for the Structural Steel Buildings. Cold -formed steel structural members shall be designed in accordance with
AISI Specification for the Design of Cold -Formed Steel Structural Members.
Welding
Welding procedures shall be in accordance with the American Welding Society Structural Welding Code.
Structural Painting
All Varco Pruden structural steel components shall be factory cleaned to remove all loose mill scale and other foreign material
generally conforming to SSPC-SP 2 (Hand Tool Cleaning). The parts are shop coated with a single coat of gray corrosion inhibiting
primer keeping with Steel Structures Painting Council (SSPC) Paint Specification 15. This primer is considered a temporary and
provisional coating. This single coat primer is not an intermediate or finish coat,
Cold formed Z's and C's will be G-30 galvanized and clear acrylic coated.
Anchor Bolts and Miscellaneous Steel
Unless requested by client, anchor bolts, embedded plates, handrail, pipe bollards, and other miscellaneous steel components are
excluded from the building shell unless specifically included in our proposal.
Exceptions/Clarifications
Use of ESFR sprinkler systems will require coordination of the sprinkler heads and the roof secondary members. If this coordination
does not occur during the design of the steel building, field modifications may be required. The engineering and any field
modifications required will be billed as a change order.
Copyright:
BlueScope ConsWdion, Inc. 2021. Any information,
data and drawings inGuded
in this Proposal are supplied to you
with the understanding that they will be held wnfidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disGosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
VARCOr/IPRUDEN
SSR Metal Roof System
General
The roof shall be SSR metal roof system as furnished by VP Buildings as follows:
Panels shall be factory roll -formed, 24" wide, with 2 major corrugations that are
each 3" high.
Panel Material and Finish
Panel material and finish shall be 24-gauge steel coated both sides with a layer of
acrylic coated Galvalume° aluminum -zinc alloy (approximately 55% aluminum,
45% zinc) applied by the continuous hot dip method. Minimum 0.55-ounce coated
weight per square foot as determined by the triple spot test per ASTM
Specification AJ92, A clear acrylic film is applied for additional protection.
System Design
SSR panels are factory -formed and field -machine seamed in place yielding a single
unit membrane. The patented SSR ridge system is efficiently installed with
only one weather sealed joint. (+
Fasteners and Provision for ExpansionlContraction
The special clips used to attach SSR panels to structural members are
designed to allow panel movement up to 1-5/8" inch in either direction (full
31/1
I movement) to compensate for thermal effects. The concealed clips
minimize the need for through -the -roof fasteners. The panels are
mechanically seamed to a full 3600 interlock for superior weathertightness,
SEALANT
(61O mm)
STRIATIONS
TYP.
Copyright:
BlueScope ConsWGion, Inc. 2021. Any information,
data and drawings inGuded
in this Proposal are supplied to you
with the understanding that they will be
held confidentially,
used only
far the purpose of evaluating this Proposal, and will not
be disGosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
--
Town of Firestone
Firestone, CO
20636 - Public Works Building Addition
26 March 2021
VARCOWPRUDEN
Roof Accessories and Flashings
All accessories (gutters, downspouts, gable and eave trims) and roof flashings are VP standard materials.
VARCOV/fPRUDEN
Panel RibT"^ Wall System
General
Precision roll -formed Panel RibTM wall panels shall be as furnished by Varco Pruden as
follows:
Panels provide 36" wide nef coverage and have 13/16"high major ribs at 12" on center
with minor ribs spaced between the major ribs. Side laps are at least one full major rib.
The wall overlapping rib utilizes anti- capillary groove. All panels are continuous from
sill to eave except where the length exceeds 41' or otherwise becomes prohibitive
for handling purposes, in which case, end laps are provided. End laps
occur at a support member.
Panel Design
Panel design shall be in accordance with AISI Specifications for the Design of Light -
Gauge, Cold Formed Steel Structural Members, CAN/CSA-S136 Cold -Formed Steel
Structural Members — latest editions, and in accordance with sound engineering methods
and practices.
Panel Material and Finish (Standard VP Colors)
Panel material and finish shall be 26, gauge painted Galvalume° aluminum -zinc alloy
as per ASTM Specification A-792 with exterior colors of a KXL finishes consist of a 1
mil 70% Kynar (KYNAR 500) based coating applied to the exterior surface of G90
galvanized or Galvalume steel. The interior surface is coated with an off-white 0.5-mil
wash coat. Kynar 500 is a registered trademark of Atochem North America, Inc..
Manufacturer shall warrant that coating shall not peel, crack or chip for 25 years. Chalking shall not exceed ASTM D4214 #8
rating and will not fade more than 5 color difference units per ASTM D2244. Interior color shall be light gray polyester color coat
not formulated for exterior weathering.
rhnunum eun �� nnnerwaw ace �'
Fasteners
Exposed wall fasteners are self -drilling hex head stainless steel capped with washer.
The color of the fastener heads is to match the wall panel color.
Sealants, mastics and closures are manufacturer's standards.
Copyright:
BlueScope Construction, Inc, 2021. Any information,
data and drawings included
in this Proposal are supplied to you
with the understanding that they will
be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disclosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 - Public Works Building Addition
26 March 2021
VARCOVV/YPRUDEN
Wall Accessories
Overhead Door Openings (Building Extension)
Overhead door openings shall be provided as follows:
Eight (8) each -14' x 16'
Overhead door openings shall be as per VP standard details complete with structural secondaries forjambs and head, drip gutter
trim for head, and trims for jambs as appropriate for the VP metal wall panels,
Flat Stock
Flash over exposed door post.
Forty (40) 24 ga 431/4" x 120" (std color)
VARCON` PRUDEN
Insulation (Building Extension)
General
Roof and wall insulation shall be faced fiberglass blanket insulation furnished as follows:
Roof — R25 (8" Faced over purlins with spacers)
Wall — R19 (6" Faced with standoff fasteners)
UOILHPOW-]E .JQPOIR X,]OIR]OX R2,]OIOKNJKJKLKJKGYIUHIOI0
The R-values listed above are not continuous where compressed at the purlins and girts.
Insulation
Fiberglass shall be as outlined in the North American Insulation Manufacturing Association (NAIMA 202-96) specification, or equal.
The fiberglass shall be faced with WMP-50 on one side. The composite of fiberglass and facing shall have surface burning
characteristics not to exceed 25 flame spread and 50 smoke developed when tested in accordance with U.L. 723 test method or
ASTM E84 test method.
Facing
The facing shall be WMP-50. WMP-50 is composed of PSKP, white polypropylene film, fiberglass and polyester scrim, 30# natural
kraft, metallized polyester. The resulting facing shall have a water vapor transmission rate of 0.02 US perm (ASTM E96).
Copyright:
BlueScope ConsWction, Inc. 2021. Any information,
data and drawings included
in this Proposal are supplied to you
with the understanding that they will
be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disGosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
Sky -Web® Fall Protection & Insulation Support System
General
The exclusive Sky -Web® fall protection system shall be installed to provide
additional job -site safety and insulation support for the VP roof system.
Physical Properties
The Sky -Web system basic mesh shall be a 1,000 denier polyester yarn
interwoven on a nominal square grid coated with a fire retardant and
ultraviolet stabilized PVC based binder. The mesh shall have a tensile strength
(pounds/yarn) of 15 pounds in each direction and a weight between 0.28 and
0.32 ounces per square foot.
System Application
The roof structural system shall be in place prior to installation of the Sky -Web
system. The Sky -Web system shall remain in place after the metal roofing is
installed.
System protects workers from falls from the leading
edge of the roof while also protecting workers below
from dropped tools. It increases worker productivity
while improving safety. After construction it serves
as a virtually invisible insulation support system.
Copyright:
BlueScope Construction, Inc. 2021. Any information,
data and drawings inGuded
in this Proposal are supplied to you
with the understanding that they will
be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disGosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
ANCILLARY SERVICES
Structural Design and Engineering of the Pre-engineered Metal Building
INSTALLATION AND SITE PREPARATION
Division 01 —PROCUREMENT ANC �'ONTRACTING REQUIREMENTS
General Conditions
Field supervision scheduled 100%full time on site
Project management
Project coordination
Site signage
Temporary facilities
Project trailer
Debris removal, dumpsters as required
Periodic and final site/building cleanup
Temporary partitions and dust control as needed at the renovated portions of the existing building
All safety compliance and quality control testing
No taxes included — Town will provide Tax Exempt Certificate
Performance and Payment Bonds
Division 02 —EXISTING CONDTITIONS
Demolition
Demolition of existing interior offices at the ground floor and existing mezzanine and all finishes
Demolition of existing end wall to facilitate addition construction
Demolition and removal of existing overhead doors to be replaced
Demolition, saw -cutting, and patching of areas of the existing concrete slab at the office area for new
mezzanine foundations and trench as required for connection to the existing sanitary waste line for the new
plumbing scope at the offices
Provide survey services for the layout of the new building addition including establishing benchmarks, building
corners and gridlines, addition foundation layout, and sub -excavation stakes for sub -grade at slab
Division 03 - r'ONCRETE
Concrete work to be performed per drawings provided include
Thirty-five (35) new concrete filled bollards set in form as shown
Six (6") thick concrete slab with 6x6 w 2.9 x w2,9 rebar in the new addition
Six (6") thick concrete slab with 6x6 w 2.9 x w2.9 rebar sloped to manhole at new wash bay
Concrete Foundations including pads and pilasters as designed for the new addition.
Concrete Pads/Pilasters & Footings as shown for the Mezzanine structural steel columns
Concrete foundations for new wash bay
Concrete Infill patch for plumbing trench
Control Joints as required
Dowel new concrete to existing as detailed
Patch existing concrete slab below new Mezzanine for the mezzanine concrete footers/structural steel
Copyright:
BlueScope Construction, Inc. 2021. Any information,
data and drawings included
in this Proposal are supplied to you
with the understanding that they will
be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disGosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
Division 05 ® METALS
All material for the renovation scope for the existing bung, which includes metal bung panels, secondary framing
members, and all flashings
Furnish and install two wall mounted stair railings at wood stairs to mezzanine
Structural steel beams and columns for new mezzanine floor framing
Anchor Bolts for the new addition for the Metal Building
Division 06 —WOOD, PLASTICS AND COMPOSITES
Mezzanine Floor framing per specifications
11 7/8" LVL and 360 Series TJI's as designed
3/4' thick OSB Subfloor
Fasteners and Hangers
Stair Framing, treads and risers
Backing and Blocking as needed for bathrooms, break room, etc.
Breakroom Cabinets — Black Melamine — Upper and Lower Cabinets, furnished and Installed Countertops for
Breakroom, Men's and Women's Restrooms and Service Counter — Solid Surface — Corian Group # 1 colors only
included.
Solid Surface Windowsills at three exterior Windows and one interior window — Corian Group # 1 colors only included.
Division 07 - THERMAL � o*��OISTURE PROTECTION
See Varco Pruden Building materials for roof and wall insulation
Installation labor under Division 13
Rigid insulation at the exterior walls at the office area on the ground floor and the North wall only at the mezzanine
Vapor Barrier at the exterior walls and ceiling of the renovated Office area at the ground floor. No vapor barrier will be
installed at the mezzanine
Chalk exterior windows, doors, and interior chalking as required
Division 08 -OPENINGS
See Varco Pruden Building materials listed above for exterior personnel doors
Interior doors, frames and Hardware per schedule furnished and installed
New Qty one (1) — at 12' x 12' Overhead Door with Operator as specified — Located at section one
New Qty four (4) — at 16' x 14' Overhead Doors with Operators as specified — Located at section two
New Qty eight (8) — at 14' X 16' Overhead Doors with Operators as specified — Located at section three — the new
addition
Overhead Coiling doors — Qty two (2) at Tx T with Operators
Service Window — Type B — Qty one (1) Hollow metal frame and pass thru single glazing. Size per drawings
Qty three (3) New Exterior Type "A" windows — Size per Drawings — Storefront Framing system/Glazing per the
drawings, - All three are Fixed Lite - Non -Operable Windows
Solitude Solamaster 750DS open ceiling model with pitched flashing and prismatic diffuser four (4)
Man -door clarifications:
Door # 116.2 is excluded as it is not on any of the floor plan
Door # 118.1 will remain, but new hardware will be installed.
Doors # 115.1, and 115.2 are included as flush doors. There are no type "G" doors shown
Card readers at doors are excluded
Copyright:
BlueScope Construction, Inc. 2021. Any information,
data and drawings included
in this Proposal are supplied to you
with the understanding that they will be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disclosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
Division 09 FINISHES
Metal Z Furring and Metal Stud Framing of all exterior walls in offices as detailed at the ground floor and mezzanine
(north wall only) to accommodate new drywall finishes.
Drywall shall be Level 3 Finish
Thermal Batt insulation at the Office perimeter walls and Sound Batt insulation at office partition walls FRP Paneling -
Wall Finish in Restrooms (both), Shower room, and two (2) walls in the Janitors closet will be FRP paneling to a
height of 514', then painted drywall above to ceiling — Marlite standard.
Ceramic Tile floor in Men's and Women's restrooms and the Shower room with ceramic tile base — Daltile volume one
(1) series 12'x12' intensity pebble, reverb ash colors
Luxury Vinyl plank flooring on the mezzanine level — Shaw Solitude 0648V series, 6"x48"
Wood stair to mezzanine, treads, exposed stringers, and riser, natural wood finish (stain)
Concrete Overlay- Product to be used is Dur-A-Flex Poly Crete MDB at the Offices as specified at the
Ground Floor only. Owner/Architect to select color from the Standard Color choices
Concrete sealer to be applied at the New Addition Slab Only
Rubber Cove base to be installed in Offices and on Mezzanine with exception of the Restrooms two (2) and Shower
room.
Paint — Interior Office/Mezzanine area Walls, Ceilings (ground floor only), Door Frames/Doors at the exterior doors to
be replaced, Exterior Doors /Frames at new Addition, and New Bollards Qty thirty two (32) — paint steel structural
members in South building: ten (10) columns, five (5) crossmembers, centerline beam
Paint interior of wash bay with Sherwin Williams Macropoxy — two (2) part epoxy paint
Finish work is not included at the existing metal buildings locations between column lines 6 and 14. Work at these
locations is limited to MEP and OH door replacement with the exception of the single office construction located
between columns 9 and 10 plus the drywall separation between the new addition and the existing building at column
line 5-6
Division 10 -SPECIALTIES
Furnish and install Toilet Partitions and Grab Bars as specified
Install Bath accessories specified to be supplied by the "Owner" per Notes # 6 and 8 on A50.
Furnish and Install two (2) Mirrors in Restrooms per size specified
We have included furnishing and installing Accessible/ID plastic Signs at seventeen (17) Locations per the detail on
drawing A50.
We have included an allowance of $1,700 to furnish and install seventeen (17) total signs for this proposal as there is a
lack of specificity for signage.
We have included an allowance of $1,000.00 to furnish and install Fire Extinguishers as none are shown on the
drawings.
One (1) Knox Box
Division 13 —INSTALLATION OF VP �>>I! PEA ,KING &SPECIAL CONSTRUCTION
Installation of Varco Pruden Buildings Materials, Summarized Above
Complies with BlueScope Construction Safety practices
Copyright:
BlueScope Construction, Inc. 2021. Any information,
data and drawings inGuded
in this Proposal are supplied to you
with the understanding that they will be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disclosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
Division 21 — FIKE SUPPRESSION
Extend Existing Sprinkler system to new addition assuming existing Sprinkler Main/Branch Line can accommodate the
additional Sq. Footage (8,160 Sq Ft).
Reinstall Sprinkler system at the reconfigured Offices and Mezzanine Locations. Our proposal is predicated upon tying
I
nto the existing Sprinkler Main or Branch line at this location. If either a New Main or Branch line is required, then
that will be an additional charge over and above our proposal amount.
Install new Fire Alarm System for both the Existing Building and the New addition
Division 22 �!PLUMBING
All piping and fixtures per plan for two new Restrooms, Shower Room and Breakroom
Install underground waste and vent to new Restrooms, Breakroom, Janitor's Closet with water heater, washer box:
labor pipe, fittings, hardware.
Install rough waste and vent and water supply to plumbing fixtures: labor pipe, fittings, hardware
Install fixtures and trim: labor pipe, fittings, hardware
Install new elevated pressure gas line to new appliances: labor pipe, fittings, hardware
Install new 1 ''/s' backflow preventer and PRV on incoming water service: labor pipe, fittings, hardware
Install new hose bib in garage: labor pipe, fittings, hardware
Install new tankless water heater, vent and components: labor pipe, fittings, hardware
Install new trench drain and discharge to just outside foundation wall: labor pipe, fittings, and hardware
Install Sand/Oil Separator including stubbing the sanitary piping thru the building foundation to the GCO clean -out
Plumbing fixtures furnished and installed per the "Plumbing Fixture Schedule" on drawing P-0
Shower Stall per note # 2 on "General Restrooms Notes" on drawing A50 is included as specified condensate piping
for HVAC
Pipe insulation per specifications
Division 23 —HEATING, VENTILATING AND AIR CONDITIONING
Install HVAC equipment as indicated on drawings
90%+ furnaces with cased coils, remote condensers, refrigeration piping and PVC vent piping
PTAC unit
Gas Fire Unit Heaters with B-vent flue piping
GRDs
Ceiling mounted exhaust fans
Wall propeller fans
Louvers with Mill finish
Motorized control dampers with 120v 2-1211Dsition actuators (interlocks by the EC)
Fire damper
Manual volume dampers
Individual CO/NO2 monitoring systems with control panels, remote sensors and testing for municipal jurisdiction
Lot of square and round duct with thermal insulation as required.
Rigging and Hoisting
Fire Caulking
Layout
Coordination with other trades
Certified Air Balance Report
Electronic close out documents
Copyright:
BlueScope ConstruGion, Inc. 2021. Any information,
data and drawings inGuded
in this Proposal are supplied to you
with the understanding that they will
be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disGosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
Division 26 — Ell.ECTRICAL
Demo existing service feeders per One - line
Demo existing panel L1 and Disconnect feeder for replacement with new wireway/gutter
Relocate the location of panel L1 — Circuitry to remain for reuse of new fixtures and power devices as practical at the
Office area.
New Nema 3R Wireway including disconnects and panels with associated feeders as designed and detailed on the
Electrical drawings. Ten (10) insulated splice blocks for wireway
L3 200amp single phase disconnect, 208v/120v, 4W, Nema 3, fused at 150 amp
L3150amp, Main breaker panelboard, 208v/120v, single phase
LIB 200amp single phase disconnect, 208v/120v, 4W, Nema 3, fused at 150amp
L1 B 150amp, main lug panelboard, 208/120v, single phase
200 ft run of 2" panel L3 in new addition
20 ft run 2" to panel L1 B (re -feed)
Minimum conduit size required to be diameter
No specification on the Time Clock —We are including one (1) Wattstopper RTw200 Astronomic Time Switch in our
Scope.
Lighting Materials and labor as shown on the Electrical drawings
Materials and labor for lighting installation per plan
All rooms will have wall occupancy sensors as shown
Large rooms will have ceiling mount occupancy sensors only
Mechanical switches per plan
Installation of all Emergency/Exit lighting per plan
Furnish Lighting Fixtures per "Luminaire Schedule" shown on drawinq # E-0.2
General power to all offices as shown on the Electrical drawings
General office 20 amp duplex receptacles
Shop 20 amp quad receptacles
Dedicated circuits
Overhead door circuits with openers
Bath GFCI receptacles
Exterior GFCI Receptacles
Water cooler, 20a, 120v
Waterproof fixtures in the wash bay
C fixture in upstairs mechanical closet
Disconnect and timer switch for the infrared heater in the wash bay
50A receptacle in the wash bay
Receptacle in the break room for microwave
Missing garage door motor disconnects and circuity in existing vehicle storage
Refrigerator circuit
Disposal circuit
Dishwasher Circuit
Kitchen countertop GFCI outlets
Emergency eye wash locations
Washer Receptacle
Dryer Receptacle
Blade sharpener, 30amp, 208v, shop power
Copyright:
BlueScope Construction, Inc. 2021. Any information,
data and drawings inGuded
in this Proposal are supplied to you
with the understanding that they will be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disclosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
Power to Mechanical Svstems as shown on the Electrical drawinas
CU1, 30a111p, 208v
CU2, 20 amp, 208v
PTAC, 20 amp, 208v
DWH-1, 120v, 20 amp
DWH-1, 120v, 20 amp
EF 112,319
EF 4,5,6,7,8 (interlock with L 1-5)
AHU-1, 120v, 20 amp
AHU-2, 120v, 20 amp
UH 14, 120v, 20 amp
L 1-5, 120v, 20 amp (via EF 4-8)
E*1, 120v, 20 amp
DIVISION 27 — COI!?11VIUNICATIONS
Furnish and Install conduit stubs to accessible ceilings, boxes, and pull string "Only" to the eighteen (18) tele/data
locations shown on the Electrical drawings,
DIVISION 31 — EARTHWORK
The Only Site Work included in our proposal is as follows;
Excavate and Backfill the New Addition Foundations,
Grade the new addition slab with existing On -Site Soils Only including soils displaced by the addition foundations.
Final Grade addition slab to =/-.1
DIVISION 33 9 UTILITIES
Installation of sewer line starting at Frontier Street and ending within 5' of Town of Firestone Public Works
buildings.
Mobilization/demobilization included
Install approximately 3,360 LF of 8" sewer line included
Excavate approximately 51,000 CY for install of 8" sewer line included eleven (11) 48" sewer manholes
Existing utility crossing for 8" sewer line included
North sewer services included
South sewer service included
ASSUMPTIONS, CLARIFICATIONS AND EXCLUSIONS
Assunip11•ions
A Standard VP Color will be specified
Delivery date: Refer to Proposed Schedule
Warranty includes one (1) Year Materials and Installation
Progress Payment Invoicing, according to Schedule of Values, submitted with no more than one invoice per month
This proposal is contingent upon reaching mutually agreeable terms
Builder's Risk Insurance shall be by owner
Copyright:
BlueScope Construction, Inc. 2021. Any information,
data and drawings included
in this Proposal are supplied to you
with the understanding that they
will be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disclosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 — Public Works Building Addition
26 March 2021
Halcyon Design approved using the IECC 2012 provision that allows the use of ASHRAE 90.1 in place of IECC for
commercial buildings
ClarifioC)l ions
This offer is based on plans and specifications related to this project, If there is a discrepancy between plans or
specifications provided for this project and this proposal, the descriptions included in this Scope of Work shall take
precedence. If there are any questions regarding clarity of our proposal, please contact us prior to issuance of a
Contract
Construction joint detail 10/S3.1 included only where the new addition slab abuts the existing building slab at column
lines # 5 and 6
Temporary electric usage and construction trailer power to be provided by the owner from the existing building
electrical service. We will install the temporary electric line to the construction trailer
Mezzanine does not have a finished ceiling, but is open to the roof structure
To complete the office/mezzanine renovation this area of the existing Building (column Line 14 thru 16) must be
vacated in total by Firestone Public Works. We have provided an add alternate to supply an office trailer for the
Firestone Public Works staff during this part of the project.
Exclusions
Identification of and protection of existing utilities
Prevailing Wages
Taxes
Unforeseen Conditions
Hazardous Materials
Permits (including schedule allowance for permit approval process)
Permit fees and processing
Compliance with LEED Certification or Air Infiltration requirements
Site work is limited to the items detailed under Division 31 above
Erosion control measures
Temporary Fencing
Testing and inspections
Structural Steel Painting except that is noted above
Materials and Labor not specified above
Design Services
Any work required to bring existing building up to current code
Proposal includes the low voltage conduit only. We have not included any low voltage work other than the specified
conduit/boxes/pull string along with HVAC low volt control wiring.
Site work except for work related to the new addition foundations and slab
Hauling in additional soils for the addition slab subgrade or hauling off existing soils currently on site.
Rock removal/mitigation
Seismic design requirements except as noted on the drawings
Any future "Tariff' material price increases
Upgrading the existing electrical service
Wood benches at the Locker room on the mezzanine
All appliances
Toilet accessories
Any work at the existing Infra -Red heaters currently installed
Furnishing any bollards at the existing or new overhead doors, except at the new building addition
Grinding the existing concrete slab at the ground floor offices (at the new Dur"XFlex Polycrete MDB floor finish install
location)
Copyright:
BlueScope Construction, Inc. 2021. Any information,
data and drawings included
in this Proposal are supplied to you
with the understanding that they will be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disclosed to third parties
without the prior written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
_ Firestone, CO
20636 — Public Works Building Addition
26 March 2021
Moisture testing and any possible modifications to the existing slab, if moisture is present (at the new Dur-A-Flex
Polycrete MDB floor finish install location)
Any "explosion proof' devices
Concrete floor sealer installation except at the new addition concrete slab
Electric service upgrade noted on drawing E-0.1
Medical grade electrical items (E=0.1)
"Force Majeure Conditions" based on Covid —19
Concrete mezzanine floor is excluded. The mezzanine shall include 3/4' thick plywood
Dewatering is excluded
Company Information for Order Entry Includes
BlueScope Construction, Inc.
Sourcewell Contract Number: 013019-13SC
Tax ID Number: 43-0949971
Copyright:
BlueScope ConstruGion, Inc. 2021. Any information,
data and drawings inGuded
in this Proposal are supplied to you
with the understanding that they will
be held confidentially,
used only
for the purpose of evaluating this Proposal, and will not
be disGosed to third parties
without the prior
written consent of
BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
Town of Firestone
Firestone, CO
20636 - Public Works Building Addition
26 March 2020
ATTACHMENT B
SCHEDULE OF VALUES
Schedule of Values per Division, as defined above:
Division 1 General Requirements
1A Design and Ancillary Services
1 B Performance & Payment Bond
Division 2 Demolition
Division 3 Concrete
Division 4 Masonry
Division 5 Miscellaneous Metals
Division 6 Wood & Plastics (Carpentry)
Division 7 Thermal & Moisture Protection
Division 8 Doors and Windows
Division 9 Interior Finishes
Division 10 Miscellaneous Specialties
Division 13 Special Construction (PEMB Installation)
13A Special Construction (BBNA Materials)
Division 21 Fire Suppression
Division 22 Plumbing
Division 23 HVAC
Division 26 Electrical
Division 28 Electronic Safety and Security
Division 31 Site Earthwork
Division 33 Utilities
TOTAL =
This quote is valid for30 days at which time a new quote must be obtained.
ALTERNATE PRICING
To furnish rental office trailer 56x12' with bathroom including weekly waste pump -out for
four months
Upgrade (13) thirteen insulated overhead doors
Tile finish on restroom walls instead of fiber -reinforced polymer (FRP) system
Reroof existing standing seam metal roof & snow guard (labor and material)
$331,323
$10,874
$17,248
$42,481
$222,669
$970
$47,440
$60,318
$10,387
$174,844
$209,738
$12,321
$1873572
$170,371
$33,865
$1821443
$136,331
$1611854
$8,204
$49,017
$1,141,037
$3,211,307
ADD $14,013
ADD $18,236
ADD $10,729
ADD $161,862
Copyright: BlueScope Construction, Inc. 2021. This Proposal contains information confidential and proprietary to BlueScope Construction, Inc. Any information,
data and drawings included in this Proposal are supplied to you with the understanding that they will be held confidentially, used only for the purpose of evaluating
�, this Proposal, and will not be disclosed to third parties without the prior written consent of BlueScope Construction, Inc.
BLUESCOPE
CONSTRUCTION
4WI400
Bwescore
CONSTRUCTION
March 26, 2021
Public Works Building Addition Proposal
Firestone, CO
Attachment C Proposal Schedule
BlueScope Constructon, Inc.
1540 Genessee Street
Kansas City, MO64102
PO Box419917
Kansas City, M064141
Telephone 816.245,6000
vnwr.BlueScopeconstruction.com
Schedule, Phasing, and Construction Durations
We anticipate the overall project duration shall be 2&30 weeks, following all approvals and contingent upon how
construction is staged, while optimizing concurrent tasks. The proposal schedule / phasing plan shall be:
• Anticipated Project Start Date during the time frame of 4/10/21 - 5/19/2021.
• The sanitary sewer scope that has been added to the project will take 72 days, we will start this as soon as the
project begins.
• The Owner will need to totally vacate the existing Office/Mezzanine areas including removal of all office
equipment, etc., prior to any work being performed in the existing building,
• We will start at both the Office/Mezzanine and the construction of the new addition simultaneously. This part of the
project should be completed in 12 -16 weeks from the start date assuming the owner has vacated the space at the
existing office/mezzanine areas.
• We would then perform the renovation at the two (2) "Vehicle Storage Areas" in between column lines 6 thru 8 and
11 to 14. This work will be completed in 6 - 8 weeks.
• We would then build the new wash bay in 3 - 4 weeks
• The Final Phase will be the renovation work at the "Vehicle Repair Area located in between column lines 8 and
10. This work will be completed in 3 — 4 Weeks.
• These Schedule durations are based upon the base proposals, any Add Alternates such as "Replacing the
Existing Standing Seam Roof' at the Existing Building or Change Orders could result in addition time being added
to the schedule.
Copyright: BlueScope Construction, Inc. 2021. This Proposal contains information confidential and proprietary to BlueScope Construction, Inc. Any intornalion, data and drawings
inGuded in this Proposal are supplied to you with the understanding that they will be held confidentially, used only for the purpose of evaluating this Proposal, and will not be disGosed to
third parties withoutthe prior written consent of BlueScope Construction, Inc.
Public Works Facility Expansion and Remodel
Construction Contract - BlueScope (002)
Final Audit Report
Created: 2021-04-11
By: Sharon Isaacs (skisaacs@bluescope.com)
Status: Signed
Transaction ID: CBJCHBCAABAAFFUB4VQACi9NM4tX6ylEFZnczU1105V4
2021-04-12
"Public Works Facility Expansion and Remodel Construction Co
ntract - BlueScope (002)" History
� Document created by Sharon Isaacs (skisaacs@bluescope.com)
2021-04-11 - 9:46:40 PM GMT- IP address: 75.81.16.97
C'-. Document emailed to Brian Aldrich (bnaldrich@bluescopeconstruction.com) for signature
2021-04-11 - 9:48:08 PM GMT
� Email viewed by Brian Aldrich (bnaldrich@bluescopeconstruction.com)
2021-04-12 - 2:01:51 PM GMT- IP address: 104.47.70.126
FSQ Document e-signed by Brian Aldrich (bnaldrich@bluescopeconstruction.com)
Signature Date: 2021-04-12 - 2:02:38 PM GMT -Time Source: server- IP address: 12,203,131.130
�i Agreement completed.
2021-04-12 - 2:02:38 PM GMT
0 Adobe Sign