Loading...
HomeMy WebLinkAboutCARMA 23-35 - Well Abandonment Report - Oxy - 8/10/2018Status VISU0554SURF 12+1/4 8+5/8 24 554 260 CBL3,0007,7541ST 7+7/8 4+1/2 11.6 7,754 628 CBL2101,524S.C. 1.1 1,510 255 Casing Type Size of Hole Size of Casing Weight Per Foot Setting Depth Sacks Cement Cement TopCement Bot Casing History Subsequent Report of Abandonment Details: If yes, explain details below If yes, explain details below Yes NoWellbore has Uncemented Casing leaks: NoYesFish in Hole: 195Estimated Depth:NoYesCasing to be pulled: Other Mechanical ProblemsProduction Sub-economicDryReason for Abandonment: -104.97603140.177650 Longitude: GPS Data: Only Complete the Following Background Information for Intent to Abandon Cody Mattson2.409/10/2008 GPS Instrument Operator's Name:PDOP Reading:Date of Measurement: Latitude: 90750Field Number:Field Name:WATTENBERG Federal, Indian or State Lease Number: Meridian:668W Range:Township:3N 35Section:QtrQtr: 23-35 Well Number: SWSW County:WELD Location: CARMAWell Name: 05-123-25189-00API Number This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the abandonment is complete, this form shall again be submitted as a Subsequent Report of the actual work completed. The approved intent shall be valid for six months after the approval date, after that period, a new intent will be required. Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration and the proposed configuration with plugs set. A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent Report are a wellbore diagram showing plugs that were set and casing remaining in the hole, the job summaries from all plugging contractors used, including wireline and cementing (third party verification) and any logs that may have been run during abandonment. State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 WELL ABANDONMENT REPORT FORM 6 Rev 05/18 Notice of Intent to Abandon cheryl.light@anadarko.comEmail: (720) 929-7461Fax: (720) 929-6461Phone: Zip:80217- 3779 COState:DENVER P O BOX 173779 Contact Name: City: CHERYL LIGHT Address: KERR MCGEE OIL & GAS ONSHORE LPName of Operator: 47120OGCC Operator Number: craig.carlile@state.co.usEmail: Tel:(970) 629-8279Name:Carlile, Craig For "Intent" 24 hour notice required, COGCC contact: 08/10/2018 Date Received: Document Number: DE ET OE ES 401730672 Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth CODELL 7598 7618 NIOBRARA 7348 7477 Total: 2 zone(s) Current and Previously Abandoned Zones Page 1 of 3Date Run: 1/9/2019 Doc [#401730672] Well Name: CARMA 23-35 *ATTACH JOB SUMMARY Technical Detail/Comments: 7/8/2019Expiration Date: NoYesFlowline/Pipeline has been abandoned per Rule 1105 Type of Cement and Additives Used: *Cementing Contractor: *Wireline Contractor: Plugging Date:inch casingft. of Additional Plugging Information for Subsequent Report Only Casing Recovered: Plug Tagged: Plug Type: Plug Tagged: Plug Type: Plug Tagged: Plug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASING Plug Tagged: (Cast Iron Cement Retainer Depth) CICR Depth CICR Depth CICR Depth2660 sacks cmt on top.withCIBP #5: Depth sacks cmt on top.withsacks cmt on top. CIPB #4: Depth25with80CIBP #3: Depth Set sacks in mouse holeSetsacks in rat hole NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate 25Set sacks at surface ft.145ft. to805sacks half in. half out surface casing fromSet60 sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casing78ft. withPerforate and squeeze at 2900 ft. ft. tosks cmt fromSet ft. ft. tosks cmt fromSet ft. ft. tosks cmt fromSet ft. 2460ft. to2660sks cmt fromSet12 ft. 6920ft. to7270sks cmt from25Set sacks cmt on top.4010 with 2sacks cmt on top. CIPB #2: Depth25with7270CIBP #1: Depth Plug Type: NOTE: Two(2) sacks cement required on all CIBPs. Plugging Procedure for Intent and Subsequent Report McCoy, Diane Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable orders and is hereby approved. COGCC Approved:Date:1/9/2019 I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete. Signed:Print Name:CHERYL LIGHT Title:Staff Regulatory Analyst Date:8/10/2018 Email:DJREGULATORY@ANADARKO.COM CONDITIONS OF APPROVAL, IF ANY: Page 2 of 3Date Run: 1/9/2019 Doc [#401730672] Well Name: CARMA 23-35 COA Type Description 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon on-location flowlines per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44. 3) After pumping squeeze, shut down and shut well in at minimum 8 hours; verify gas and liquid migration has been eliminated. If evidence of gas migration or pressure remains contact COGCC Engineer for an update to plugging orders. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare. Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. Attachment Check List Att Doc Num Name 401730672 WELL ABANDONMENT REPORT (INTENT) 401730739 PROPOSED PLUGGING PROCEDURE 401730740 WELLBORE DIAGRAM 401899357 FORM 6 INTENT SUBMITTED Total Attach: 4 Files User Group Comment Comment Date Engineer Deepest water well within one mile =500’ DWR’s aquifer determination tool base of Laramie-Fox Hills = 77’ 01/09/2019 Permit Passed permit review 08/15/2018 Well File Verification Pass 08/15/2018 Total: 3 comment(s) General Comments Page 3 of 3Date Run: 1/9/2019 Doc [#401730672] Well Name: CARMA 23-35