Loading...
HomeMy WebLinkAboutADAM GEORGE GU 1 - Well Abandonment Report - Kerr McGee - 4/13/2021Casing History Subsequent Report of Abandonment Details: If yes, explain details below If yes, explain details below Yes NoWellbore has Uncemented Casing leaks: NoYesFish in Hole: Estimated Depth:NoYesCasing to be pulled: Other Mechanical ProblemsProduction Sub-economicDryReason for Abandonment: -105.00427040.171317 Longitude: GPS Data: Only Complete the Following Background Information for Intent to Abandon 3.5 12/16/2006GPS Quality Value:Date of Measurement: Latitude: Type of GPS Quality Value:PDOP 90750Field Number:Field Name:WATTENBERG Federal, Indian or State Lease Number: Meridian:668W Range:Township:2N 4 Section:QtrQtr: 1 Well Number: SWNE County:WELD Location: ADAM, GEORGE GUWell Name: 05-123-08503-00API Number This form is to be submitted as an Intent to Abandon whenever an abandonment is planned on a borehole. After the abandonment is complete, this form shall again be submitted as a Subsequent Report of the actual work completed. The approved intent shall be valid for six months after the approval date, after that period, a new intent will be required. Attachments required with the Intent to Abandon are wellbore diagrams of the current configuration and the proposed configuration with plugs set. A Subsequent Report of Abandonment shall indicate the actual work completed. Attachments required with a Subsequent Report are a wellbore diagram showing plugs that were set and casing remaining in the hole, the job summaries from all plugging contractors used, including wireline and cementing (third party verification) and any logs that may have been run during abandonment. State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894 -2109 WELL ABANDONMENT REPORT FORM 6 Rev 11/20 Notice of Intent to Abandon christina_hirtler@oxy.comEmail: Fax: (720) 929-6301Phone: Zip:80217- 3779 COState:DENVER P O BOX 173779 Contact Name: City: Christina Hirtler Address: KERR MCGEE OIL & GAS ONSHORE LPName of Operator: 47120OGCC Operator Number: robbie.revas@state.co.usEmail: Tel:(720) 661-7242Name:Revas, Robbie For "Intent" 24 hour notice required, COGCC contact: 04/09/2021 Date Received: Document Number: DE ET OE ES 402653847 Formation Perf. Top Perf. Btm Abandoned Date Method of Isolation Plug Depth CODELL 7343 7362 J SAND 7802 7820 01/17/2006 SAND PLUG 7426 Total: 2 zone(s) Current and Previously Abandoned Zones Type of Well Abandonment Report: Page 1 of 4Date Run: 4/12/2021 Doc [#402653847] Well Name: ADAM, GEORGE GU 1 Technical Detail/Comments: 10/11/2021Expiration Date: NoYesFlowline/Pipeline has been abandoned per Rule 1105 Type of Cement and Additives Used: *Cementing Contractor: *Wireline Contractor: Cut and Cap Date: inch casingft. of Additional Plugging Information for Subsequent Report Only Casing Recovered: Plug Tagged: Plug Type: Plug Tagged: Plug Type: Plug Tagged:ANNULUSPlug Type: Plug Tagged:CASINGPlug Type: Plug Tagged:CASING Plug Tagged: (Cast Iron Cement Retainer Depth) CICR Depth CICR Depth CICR Depth2760 sacks cmt on top.withCIBP #5: Depth sacks cmt on top.withsacks cmt on top. CIPB #4: DepthwithCIBP #3: Depth Set sacks in mouse holeSetsacks in rat hole NoYesAbove Ground Dry-Hole Marker:Cut four feet below ground level, weld on plate Set sacks at surface ft.ft. tosacks half in. half out surface casing fromSet sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casingft. withPerforate and squeeze at sacks. Leave at least 100 ft. in casing215ft. withPerforate and squeeze at 3200 ft. ft. tosks cmt fromSet ft. ft. tosks cmt fromSet ft. 0ft. to50sks cmt fromSet11 ft. 0ft. to580sks cmt fromSet50 ft. 2575ft. to2760sks cmt from15Set sacks cmt on top.6976 with 2sacks cmt on top. CIPB #2: Depth2with7260CIBP #1: Depth Plug Type: NOTE: Two(2) sacks cement required on all CIBPs. Plugging Procedure for Intent and Subsequent Report Casing Type Size of Hole Size of Casing Grade Wt/Ft Csg/Liner Top Setting Depth Sacks Cmt Cmt Btm Cmt Top Status SURF 12+1/4 8+5/8 J-55 24 0 262 250 262 0 VISU 1ST 7+7/8 4+1/2 I-80 10.5 0 7919 200 7919 7000 CBL S.C. 1.1 7+7/8 4+1/2 7000 150 7000 6080 CBL S.C. 1.2 7+7/8 4+1/2 4810 560 4810 3458 CBL S.C. 1.3 7+7/8 4+1/2 1440 524 1440 96 CBL Haverkamp, Curtis Based on the information provided herein, this Well Abandonment Report (Form 6) complies with COGCC Rules and applicable orders and is hereby approved. COGCC Approved:Date:4/12/2021 I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete. Signed:Print Name:Christina Hirtler Title:Admin Date:4/9/2021 Email:christina_hirtler@oxy.com CONDITIONS OF APPROVAL, IF ANY: Surface Plug Setting Date: Number of Days from Setting Surface Plug to Capping or Sealing the Well: Page 2 of 4Date Run: 4/12/2021 Doc [#402653847] Well Name: ADAM, GEORGE GU 1 COA Type Description Confirm existing J-Sand plug with tag. Contact COGCC if deeper than 7734'. Verify existing cement coverage by CBL - submit to COGCC for verification of plugging orders prior to continuing plugging operations. 1) Provide 2 business day notice of plugging MIRU via electronic Form 42. 2) After placing the shallowest hydrocarbon isolating plug (6976'), operator must wait a sufficient time to confirm static conditions. 3) After placing plug at 3200¶assure that all fluid migration has been eliminated by monitoring the well for a minimum of 8 hours before proceeding to the next plug. If at any time after placing this plug there is evidence of pressure or of fluid migration, contact COGCC engineering before continuing operations. 4) Prior to placing the 580¶plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 5) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug ±must be at 212¶or shallower and provide at least 10 sx plug at the surface. 6) Leave at least 100¶of cement in the wellbore for each plug. 7) Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines. 8) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed. Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure. Condition of Approval Page 3 of 4Date Run: 4/12/2021 Doc [#402653847] Well Name: ADAM, GEORGE GU 1 1. Operator will implement measures to control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare, and the environment. 2. Prior to commencing operations, at a minimum, operator will contact the neighborhood HOA and offer information regarding the nature and timing of the P&A operations. 3. Prior to commencing operations, at a minimum, the operator will post signs in conspicuous locations coordinated with the neighborhood HOA or City of Firestone. The signs will indicate plugging and abandonment operations are being conducted, the well name, well location information, and the Operator's contact information. Signs must not create a traffic hazard. 4. Prior to commencing operations, at a minimum, the operator will provide an informational sheet to the Building Units that are adjacent to the parcel on which the well is located. The sheet will include the Operator's contact information, the nature and timing of the P&A operations. 5. This oil and gas location is within a CPW-mapped bald eagle roost or communal roost High Priority Habitat. The P&A activities must not take place between November 15 to March 15 if there is direct line of sight between the active roost to the plugging activity. If plugging activities take place from November 15 to March 15, the Operator must coordinate with CPW in advance and conduct a pre-plugging roost survey to assess roost activity and distance from the roost to the location. 6. This oil and gas location is located in the proximity of CPW-mapped High Priority Habitat for Aquatic Native Species Conservation Water. Operator will review stormwater program and implement stormwater best management practices or erosion control measures as necessary to prevent sediment or impacted stormwater from entering Boulder Creek. 5 COAs Attachment List Att Doc Num Name 402653847 WELL ABANDONMENT REPORT (INTENT) 402653864 PROPOSED PLUGGING PROCEDURE 402653865 WELLBORE DIAGRAM 402655284 FORM 6 INTENT SUBMITTED Total Attach: 4 Files User Group Comment Comment Date Permit -Confirmed as-drilled well location. -No other forms in process. -Production reporting up-to-date. -Confirmed productive intervals and TA, docnum: 574072, 1516901, 1318825. -Reviewed WBD and procedure. -Pass. 04/12/2021 Engineer Deepest water well within 1 mile: 700'04/12/2021 Total: 2 comment(s) General Comments Page 4 of 4Date Run: 4/12/2021 Doc [#402653847] Well Name: ADAM, GEORGE GU 1 26 MIRU cementers. Pump Fox Hills Balance Plug: Pump 50 sx (10.3 bbl or 58 cf) of the Neat G Cement (15.8 ppg & 1.15 cf/sx). Volume is based on 580' in 4-1/2", 10.5# production casing with no excess. The plug is designed to cover 580'-0'. Plug length exceeds 500'. Consult with Foreman or Engineer on splitting up the plug. Verify and document cement to surface. Collect wet and dry samples of cement to be left on rig. 27 COA: If cement was not circulated to surface, then WOC 4 hours. Tag TOC. TOC must be 25' or shallower. If tag is too deep or there is evidence of pressure or fluid migration, contact Engineering. 28 Pull out of cement. TOOH, LD all 2-3/8" tbg. PU and TIH with 16' of tbg subs. Top off cement to surface. Circulate clean. TOOH and LD tbg subs. RDMO cementers. ND BOP. Install night cap. RDMO WO rig. 29 Instruct cementing and wireline contractors to e-mail copies of all job logs/job summaries to rscDJVendors@anadarko.com within 24 hours of completion of the job. 30 Supervisor submit paper copies of all invoices, logs, and reports to VWP Engineering Specialist. 31 Excavation crew to notify One Call to clear excavation area around wellhead and for flow lines. 32 33 Welder cut casing minimum 5' below ground level. 34 Fill 8-5/8", 24# surface casing from 50' to surface with 11 sx (2.2 bbl or 12.4 cf) of cement (15.8 ppg & 1.15 cf/sx). Top off production casing as needed. 35 Spot weld on steel marker plate. Marker should contain Well name, Well number, legal location (1/4 1/4 descriptor) and API number. 36 Obtain GPS location data as per COGCC Rule 215 and send to rscDJVendors@anadarko.com. 37 Properly abandon flow lines per Rule 1103. File electronic Form 42 once abandonment is complete. 38 Back fill hole with fill. Clean location, and level. 39 Submit Form 6 to COGCC ensuring to provide 'As performed' WBD identifying operations completed. Deepest WW 1 mile: 480'; FHM: 523'; Sussex Top: 3997'; Sussex Base: 4241'; Shannon Base: 4615'; Niobrara Top: 7076' WELL HAS GYRO. Gyro was run on 12/13/13. NIO SQZ @ 7000' SUSSEX/SHANNON NOT PRODUCTIVE WITHIN 1 MILE Well was drilled by Amoco. Directional Well.