Loading...
HomeMy WebLinkAboutMCHALE, HAZEL UNIT B 1 - Start of Plugging Operations - Peterson Energy Operating Inc - 7/31/2024State of Colorado Energy & Carbon Management Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 FIELD OPERATIONS NOTICE FORM 42 Rev 01/21 Document Number: ECMC RECEPTION Receive Date: 07/31/2024 403872496 Ryan Dornbos Signature:Title: Print Name:Email: Date: Ryan@PEOperating.com I hereby certify all statements made in this form are, to the best of my knowledge, true, correct and complete. 07/31/2024President ECMC Operator Number: City: Company Name: Address: 68710 PETERSON ENERGY OPERATING INC PO BOX 2169 LOVELAND Zip:State:80539-2169 Contact Person:Ryan Dornbos Phone: ( ) (970) 669-7411 CO Email: Fax: Ryan@PEOperating.com Entity Information 05 - 123 - 08332 - 00 240544 318068 Sec:Twp:Range:QtrQtr:32 Lat:Long:3N 67W SWNE 40.185890 -104.910000 API #:Facility ID:Location ID: Facility Name:MCHALE, HAZEL UNIT B 1 Submit By Other Operator Update of a previous Form 42 Notice NO START OF PLUGGING OPERATIONS - 48-hour notice required Date:08/05/2024 Time:07:00 (HH:MM) Are Plugging Operations for this Well anticipated to last for longer than one day? If YES, briefly describe the planned activities and the estimated duration of these operations: This well resides inside an active gravel mine and currently stands about 25 ft above the mine floor and is planned to be removed to enhance the safety of the gravel mining operations. The well will be cut and capped near the mine floor at an estimated total depth approximately 30' from surface elevation. The well is not being re-entered and nothing downhole is to be completed or re- plugged in any fashion, it is proposed to remove approximately 25 ft of the well and install a cap. No The Form 42 shall be submitted as required by Rule, Notice to Operators, Policy, or Condition of Approval. A Form 42 Update shall be submitted to revise the scheduled date or time on a previous Form 42 - Advance Notice of Field Operations. A Form 42 Update must be for the same well, location, or facility and for the same Field Operation as a previous Form 42. NOTE: Operator's Contact for Advance Notices of Field Operations should be available 24 hours a day, 7 days a week and should have the most current scheduling information for the operation. Operator's Contact for other notices should be able to respond to questions regarding the reported information. Date Run: 7/31/2024 Doc [#403872496] Well Name: MCHALE, HAZEL UNIT B 1 Page 1 of 1