HomeMy WebLinkAbout 19-90 PLM Asphalt CO 1-Wooster Ave St Replacement ProjRESOLUTION 19-90 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING A CHANGE ORDER REGARDING THE TOWN OF FIRESTONE AND PLM ASPHALT AND CONCRETE LLC I S AGREEMENT REGARDING THE WOOSTER AVENUE STREET REPLACEMENT PROJECT WHEREAS, in the course of PLM Asphalt and Concrete LLC's ("Contractors") performance of work on the Wooster Avenue Street Replacement Project ("Project"), Town staff became aware of pavement concerns regarding Berwick Avenue; and WHEREAS, through a geo-technical analysis, the Town confirmed that Berwick Avenue is in need of replacement and associated curb and gutter work; and WHEREAS, Contractor is currently staged within the Town and has the skill and experience to perform such work; and WHEREAS, staff recommends that, in accordance with Section 6.2 of the Contractor's Agreement with the Town, the Board of Trustees approve a Change Order authorizing the Berwick Avenue work. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: The Board of Trustees hereby approves the Change Order concerning the Town of Firestone and PLM Asphalt and Concrete LLC's Agreement, and thus authorizes the replacement of Berwick Avenue and associated curb and gutter work, and authorizes the Mayor to execute the Change Order. INTRODUCED, READ AND ADOPTED this 25th day of September, 2019. �a O� 10 ATTEST: `1TY Town Clerk Leah Vanarsdall, TO�WN,OF FIR�ESTONE,�cOLORADO Sinde a •, Mayor AS TO FORM: 'Town Attorney Eel114ZA Is No. 1 Date of Issuance: September 19, 2019 Effective Date: September 26, 2019 Project: Town of Firestone Wooster Owner: Town of Firestone Owner's Contract No.: 100.8000.1000.000.221 Avenue Street Replacement Project Contract: Construction Services Contractor: PLM Asphalt & Concrete, LLC Date of Contract: July 1012019 Engineer's Project No.: 0668.0184.010 The Contract Documents are modified as follows upon execution of this Change Order: Description: See Attached detail. Attachments (list documents supporting change): Items No 1 & 2, and design Sheet 15 (Berwick Avenue Site Plan) CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑Working days ®Calendar days Substantial completion (days or date): October 18 2019 $ 376,704.00 Ready for final payment (days or dale): October 25 2019 Increase from previously approved Change Orders No. 0 Increase from previously approved Change Orders to No, 1: No. 0 to No. 1: Contract Price prior to this Change Order: $376.704.00 Increase of this Change Order: $127.527.60 Contract Price incorporating this Change Order: $504,231.60 MENDED: By: Signature) Date: Approved by unding Agency (if applicable): Substantial completion (days): 0. Ready for final payment (days): 0 Times this Change Order: Contract prior to Substantial completion (days or date): October 18 2019 Ready for final payment (days or date): October 25 2019 Increase of this Change Order: Substantial completion (days or date): November 8 2019 Ready for final payment (days or date): November 15 2019 Contract Times with all approved Change Orders: Substantial completion (days or date): November 8. 2019 Ready for final payment (days or date): November 15 2019 ACCF,.P E By: Jr. ner (Aut zed Signa ure Date: EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. 00941.1 of 3 DESCRIPTION: Item NO. 1 — NET CHANGE = $127,527M An immediate necessity to address a failing road (Berwick Avenue) came to the forefront of Public Works necessary improvements. A design plan was prepared for the improvements and PLM Asphalt & Concrete, LLC (PLM) was asked to prepare a proposal for the additional work. Public Works is asking PLM to complete the improvements in order to ensure they get completed this year. The change order project line items are shown below. BERWICK AVENUE STREET REPLACEMENT 28 ASPHALT/CONCRETE SAW -CUT LF 72 $2.60 $187.20 29 ASPHALT REMOVAL SY 21970 $3.30 $91801.00 30 CONCRETE REMOVAL SF 174 $3.90 $678.60 SUBTOTAL $10,666.80 EROSION CONTROL & EARTHWORK 31 ROCK SOCK EA 3 $180.00 $540.00 32 CONCRETE WASHOUT AREA EA 1 $805900 $805.00 33 STRIP TOPSOIL (4" DEPTH) CY 5.6 $45.00 $252.00 34 CUT CY 506 $15.40 $7,792.40 SUBTOTAL $9,389.40 UTILITIES 35 ADJUST VALVE BOX EA 2 $460400 $920.00 36 ADJUST SANITARY SEWER MANHOLE LIDS EA 4 $345.00 $1,380.00 SUBTOTAL $2,300.00 ROADWAY CONSTRUCTION 37 SUBGRADE PREPARATION- SOIL STERILIZATION SY 3,021 $3.65 $11,026.65 38 HAUL & GRADE RECYCLED ASPHALT MATERIAL (6" DEPTH) CY 495 $27.60 $131662.00 39 ASPHALT PAVEMENT (4" FULL DEPTH) SYI 11,880 $4.35 $511678.00 40 6' CROSSPAN EA 2 $21642.00 $5,284.00 41 CROSSPAN TOE WALL CY 1.5 $1,205,00 $11807.50 42 CURB RETURN WITH HANDICAP RAMP EA 1 $3,237.00 $31237.00 SUBTOTAL $86,695.15 MISCELLANEOUS 43 TRAFFIC CONTROL LS 1 $12,095.00 $12,095.00 44 MOBILIZATION (5%) LS 1 $61381.25 $61381.25 SUBTOTAL $18,476.25 TOTAL CONSTRUCTION CHANGE ORDER COST $127,527.60 EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. 00941-2 of 3 Item No. 2 — CHANGE IN CONTRACT TIME Due to the scope of the project changing and the additional work required, additional time is being grated to the contract's substantial completion date and ready for final payment date. Change in Substantial completion date = November 8, 2019 Change in Ready for final payment date = November 15, 2019 EJCDC C-941 Change Order Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. 00941-3 of 3 fifff ON I AM IF I INN It" All %�� 1� �. '�—% a >Toot lee % % ' N its e�, IN Aw , IN vio IN I ts�y ■, I 1, : �1 t ' N 1 ,,.Is °/ A," t S, 4NINA 1; 1 ADD a. (f, lo F�ANN i1:, i r� I 7C t '' r( r ,. D t y m 3: 0 1 7VAM J �� i" l z I f a �.`s m �� D (■ r ��: 14 �v C / r "� till G h J� 1, pS to a Z N G of Lu 1 � L «% nn to r ! r I It m , NNE 1 At NEA ' 61 �� D� I, 4' t) �, 1[ �� �� , If 41 / I a 9 I p L, �� , z � � � ,•t , luami z t �� IN, IT stir : — r ' �.`if - ,x t. wa �� N Ott MR, fill so Nil IN It I r^ t �a F I It I No T l a-' ~nab— la—w.a_,T IN, 1 i sI ' ! ~.) �1 -.,IN If x 1 IjIN t om �a=m I ai oAm 8qpG5 g�ig m >oaTc �zun . �g �� ��€y Rog F l a 85 flop m It �9 —� Fo q a �b� o °egA IN ,gym"m z Fn 0 D Fe=F SS Rm b 8 Rm >o Rm cn a s 0 s Bitm>m BRa a� b� gP �f aq "� r e A3$v n Is 0 D mF9S>gmm 'H R�m3 _ E M R to DID IF L # 21 �e � �s"" bT to m m€ mm e m2op m Is, DATE Moil Lill K � 4 0 5 TOWN OF FIRESTONE � r� �^ •� WOOSTER AVENUE STREET REPLACEMENT C V�DMI: � GROUP, INC. EIiGINEERIHO Otis as BERWICK AVENUE SITE PLAN 2 P "0"" IDRNE LOWS HD COLORADO ODSJB (970) 27MO29