HomeMy WebLinkAbout 19-73 Cesare Geotechnical A1-Wooster Ave St ReplacementRESOLUTION 19-i3
A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF
FIRESTONE, COLORADO, APPROVING THE FIRST AMENDMENT
TO THE AGREEMENT BETWEEN THE TOWN OF FIRESTONE AND
CESARE, INC., FOR GEOTECHNICAL SERVICES (WOOSTER
AVENUE STREET REPLACEMENT)
WHEREAS, Cesare Ines ("Cesare')
geotechnical engineering field services for
("Project"); and
services pursuant to the Agreement are for
the Wooster Avenue Street Rehabilitation
WHEREAS, the Town recently became aware of pavement issues on Berwick Avenue
that require immediate geotechnical services which Cesare can expeditiously provide in
conjunction with its Project duties.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
The First Amendment to the Agreement between the Town of Firestone and Cesare, Inc.,
for Geotechnical Engineering Services (Wooster Avenue Street Replacement) is approved in
substantially the same form as the copy attached hereto and made a part of this Resolution and
the Mayor is authorized to execute the First Amendment,
INTRODUCED, READ AND ADOPTED this 14th day of August, 2019.
BbAi SindeW, Mayor
ATT jE,S�T�:
:/J I Ul f )G CS
Leah Vanarsdall, Town Clerk
AS TO FORM:
l'own Attorney
FIRST AMENDMENT TO AGREEMENT BETWEEN Tl
AND CESARE, INC.
FOR GEOTECHNICAL ENGINEERING
(WOOSTER AVENUE STREET REPLA
OWN OF FIRESTONE
VICES
THIS FIRST AMENDMENT TO AGRgEMENT FOR GEOTECHNICAL
ENGINEERING SERVICES is made and entered into effective as of the day of
t , 2019, by and between the TOWN OF FIRESTONE, a Colorado municipal
coipo ation, hereinafter referred to as the ("Town"), and CESARE, INC., a Colorado
corporation, hereinafter referred to as the ("Consultant,") with reference to that certain Service
Agreement between the Town and Consultant executed by the Town on July 24, 2019 and
hereinafter referred to as the ("Original Agreement"),
WHEREAS, Consultant's services under the Original Agreement are for the
geotechnical engineering services for the Wooster Avenue Street Replacement ("Project"); and
WHEREAS, the Town recently became aware of pavement issues on Berwick Avenue
which require geotechnical engineering services which Consultant can expeditiously provide in
conjunction with its Project duties.
NOW, THEREFORE, for good and valuable consideration, the Parties agree as follows:
1. Section 4.1 of the Original Agreement is hereby amended to read as follows
(words added are underlined; words deleted are shown in &t4keout):
4.1 The Town shall pay the Consultant for services requested and rendered
under this Agreement at the hourly rates plus expenses set forth in Exhibit "A;"
provided, however, that the total amount payable for Services under this Agreement
shall in no event exceed $9,°�0-$12,1 00.00. For services compensated at hourly
rates, or on a per -task basis, such rates or costs per task shall not exceed the amounts
set forth in Exhibit A as amended. The foregoing amounts of compensation shall
be inclusive of all costs of whatsoever nature associated with the Consultant's
efforts, including but not limited to salaries, benefits, overhead, administration,
profits, expenses, and outside consultant fees. The Scope of Services and
payment therefore may only be changed by a properly authorized amendment to
this Agreement. No Town employee has the authority to bind the Town with
regard to any payment for any services which exceeds the amount payable under
the terms of this Agreement.
2. Exhibit A of the Original Agreement is hereby amended by addition of the
attached Supplement which is hereto made a part of this First Amendment.
3. The Original Agreement, except as amended by this First Amendment, remains in
full force and effect in accordance with its terms and conditions.
IN WITNESS WHEREOF, the Parties have executed this First Amendment to the
Geotechnical Engineering Services Agreement effective as of the day and year first set forth
above.
TOWN OF FIRESTONE,
BY:
obbi Sindelar, Mayor
ATTEST:,I�Y(.�4C(�Y1�(�� dyff
Leah Vanarsdall, Town Clerk
CONSULTANT:
CESARE, INC.
a Colorado corporation,
By:
Title: Principal Engineer
AIVED AS TO FORM:
William P. Hayashi, Town Attc
Date: August g 2019
EXHIBIT A
c
Ms, Lindsey Green
Colorado Civil Group, Inc.
2204 Hoffman Drive
Loveland, CO 80538
JUIy 23, 2019
Revised July 31, 2019
Subject: Proposed Geotechnical Study
Berwick Avenue (between Florence Avenue and Farmdale Street)
Firestone, Colorado
Proposal Agreement No. F190709
Dear Ms. Green:
Cesare, Inc. (Cesare) is pleased to submit this proposal to the Town of Firestone for a geotechnical
study on a section of Berwick Avenue between Florence Avenue and Farmdale Street. The asphalt
pavement has developed distress in some areas of the street. This section of residential street is
approximately 500 feet in length consisting of two traffic lanes. The purpose of this investigation will
be to obtain subsurface data to help evaluate the probable causes of the severe pavement distressed
observed. Two test holes will be performed to provide some useful information about the existing
pavement section, soil classifications, moisture contents, engineering properties of the subsoils and
possible depths to water. The information obtained will allow us to offer an opinion about the primary
reasons for the pavement failure and present some guidance for a suitable repair or replacement
section.
Based on the existing data and our understanding of the project requirements, we propose the
following scope of services:
1. Contact the Utility Notification Center of Colorado (811) to have publicly owned utilities
identified and marked prior to performing any drilling or excavation in the street. The
Client/Owner is responsible for having the locations of any private utilities or subterranean
structures identified and clearly marked prior to Cesare initiating drilling or excavation
services.
2. Drill a total of 2 borings in Berwick Avenue, both to be located adjacent to areas of
distress. Borings will be drilled to depths of about 5 to 10 feet below the existing ground
surface. This proposal is based on the site being accessible by a standard truck mounted,
rubber tired drill rig, equipped with continuous flight, solid stem auger. In the event site
access or difficult drilling requires use of a different rig or drilling equipment, additional
costs will apply. This proposal assumes right of way permitting will either not be required
or will be provided by the client.
3. Perform penetration resistance tests on the in -place soil/bedrock during drilling to help
identify pertinent material layers and obtain samples of the materials encountered.
CESARE, INC.
4. Check for the presence of groundwater in our borings during drilling and once within 3
days after drilling. Cesare will leave both of the borings open but covered with steel plate
to allow for water checks.
5. Backfill all borings with cuttings/spoils obtained from the borings and/or other suitable
materials upon completion of the last groundwater level check. Borings will be surface
patched with cold -patch asphalt mix.
6. Conduct laboratory testing to classify and characterize the soil/bedrock materials
encountered in the borings. Testing may include grain size distribution, plasticity, natural
moisture content and density, swell -consolidation and R-value.
7. Present interim data verbally as the field and laboratory study progresses, if requested.
8. Evaluate the data obtained from field investigations and laboratory testing.
9. Perform data review of existing pavement for information that includes history of
pavement design through construction and recent repairs.
10. Summarize the field and laboratory data and present results of our evaluation and
analyses in an engineering report that will include:
a. A site plan showing the existing site and locations of borings;
b. Summary logs of the borings that show existing pavement and road base
thickness, soil/bedrock types encountered, locations and types of samples
obtained, results of penetration tests performed, and groundwater levels;
c. Laboratory test results in graphic and tabular form;
d. Descriptions of existing site conditions;
e. Opinions on sources) of pavement distress and failures;
f. Repair/replacement recommendations.
g. Surface drainage precautions.
11. Submit the geotechnical study report in electronic format (pdf) signed by a Colorado
registered professional engineer upon completion of these services. Printed copies will not
be provided unless specifically requested prior to report preparation. Additional fees will
apply if printed copies are requested.
Cesare will perform the proposed services on a time and materials basis for an estimated fee of
$2,200.
ADDITIONAL SERVICES
Should it become necessary to revise the scope of services from that described herein, Cesare will
revise the estimates/fees provided herein accordingly and submit for written authorization prior to
performing the revised scope. Consultation, engineering, and/or additional testing required or
requested to be performed after submittal of our report (draft or final) will be invoiced at the hourly
and/or laboratory testing rates listed in our schedule of fees.
The proposed services will require drilling through existing pavement. Cesare will repair the pavement
with cold patch. If the Client/Owner requires and requests repair beyond this, Cesare will submit a
separate proposal for the cost of conducting the requested repair.
2
SCHEDULE OF FEES
Senior Principal................................................."give.......................... $185/hour
Principal........................................................................................... $165/hour
Senior Consultant.... 0064 womsbAl I 1 5044460 60440466sa RAO to $150/hour
Senior Project Engineer or Senior Project Geologist ............................. $130/hour
Senior Project Manager. . A a a a a a a a a a a a 0 A a b a 0 A a A S a 0 0 6 a a a 0 0 a 0 1 6 0 a a a 4 4 a 4 a 4 4 a 0 a A a 6 4 a a 0 a a a a 0 a 0 8 0 a * I $130/hour
Project Engineer or Project Geologist..... $115/hour
Project Manager,,,,. 44 poommoopmes 000 $moo $0944 660660*6 9409066as Batiste message go $115/hour
Staff Engineer or Staff Geologist........................................................ $100/hour
Special Inspector................................................................................. $85/hour
Master Technician............................................................................... $78/hour
FieldEngineer................Safes BORN ...........................................................$78/hour
Senior Technician... I Nooms a osoavoto 606046@65 a 1644144m. 1 0 "@AVG $68/hour
Technician.......................................................................................... $58/hour
TechnicalSupport............................................................................... $52/hour
Computerized Drafting.. a 6 a a a a a a a as as it I A k a I a a a a 6 a a a a b a I at a a I a as as a a a a A at a I a of a a a a A a a a a I IN a a a a. $78/hour
MIT-SCAN2 (Dowel and Tie Bar) Scanning ......................... Quoted upon request
Foundation Construction Observations
(E ivatiorgOpdn Hod, Foo g, Reinforcing Steel,
Perimeter Drain, Void, Dampproofing, Waterproofing),.... Is Iskagam .... Quoted upon request
Concrete Maturity Data Loggers..... woo 0 IV ONON401 *Sao*$** 060681*2 *A.. .......466/each
Coring Operations ................................................ $92/hour
Expenses and Outside Services.....................................................At cost +13%
Mileage...........................................................................At current Federal rate
Equipment Rental. 2 1 a 9 0 1 0 0 a 1 0 a a 0 a a I a 0 6 0 a * a 0 D a 0 a Iota Quoted upon request
Overtime Premium (1).........................................................................1.3 x rate
Cesare Holiday Rate �3}....................................................................... 2.0 x rate
Night Shift Premium (6 PM to 6 AM) ........................................... Rate + $5/hour
IN Payment is due within thirty (30) days of our invoice date. Cesare reserves the right to apply a service charge
of 1.5% per month to unpaid balances commencing thirty (30) days from the date of invoice and/or to cease
service on any continuing project where invoices are more than sixty (60) days past due and/or to not issue
final documents for projects where invoices are more than sixty (60) days past due.
cz� Overtime Premium applies to hours exceeding 8 hours per day or 40 hours per week charged to a single
project, and any hours worked on weekends.
�3)Cesare holidays are New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day, and Christmas
Day.
The above fees are for 2019, Yearly fee increases are typically 3% to 5%; usually determined at year end.
2019 Cesare, Inc. Schedule of Fees 01,01.19 Effective January 1, 2019
Corporate Of fiice% 7108 South Alton Way, Building 0 Centennial, CO 80112
Locations: Centennial FrederickSiiverthorne ,, Salida/CrestedSalida/Crested Butte
Phone 303-220-0300 .c reioc.corn
SOIL`TESTING
Sail Tests Accreditetl Test Procedure Fea each"($)
Atterberg Limits (LL, PL, and PI), Method A (multi -point) D4318/T89 and 90 68
Atterberg Limits (LL, PL, and PI), Method B (1-point) D4318/T89 and 90 58
California Bearing Ratio ASTM D 883/7193 300
Chloride 35
Density and Moisture by Nuclear Methods D6938/T310
Direct Shear (CU Test) 3-Point Envelope - in situ
(California Liner "2" dia.) T236 375
Direct Shear (CU Test) 3-Point Envelope
(includes specimen remolding) T236 425
Direct Shear (CU Test) 3-Point Envelope
(includes Proctor and specimen remolding) T236 475
_w.,. _ - .... ,
Double hydrometer (includes gradation and minus #200 wash, and
specific gravity) 250
Gradation with Minus #200 Wash D6913, C136 and D1140/T27 80
Hydrometer (includes�gradat11 ion and minus #200wash, _ T -
and specific gravity) D422/T88 180
Minus #200 Wash D1140 35
Moisture Content D2216/T265 20
D6981 1557, and D4718/
Moisture/Density Relationship (Proctor) T99, 180, and T224 125
Natural Moisture and Density 25
Natural Moisture and Density -Shelby Tube 35
Organic Content (ASTM D2974) 68
pH D189 25
Pinhole Dispersion 300
Proctor Check Point 58
Relative Density (maximum/minimum wet or dry method) D4253 195
Resistivity (Field ASTM G57, Lab AASHTO T288) T288 90
R-Value D2844/T190 275
Soil Suction 70
T100 75
Swell only D4546 45
Swell/Consolidation D4546 60
Swell/Consolidation-Shelby Tube _ 90
Swell/Consolidation (remolded) D4546 85
Timed Consolidation D2435/T216 350 Ll
Unconfined Com
Unconfined Com
ncludes
Cu
(remolded, includes moisture/density) D2166/T208 90
USCS (Unified Soil Classification System) D2487 15
Water SolUhle SUM3teS 35
(ASTM D1633-cement or D5102-lime) field developed 35
(ASTM D1633-cement or D5102-lime) laboratory developed 45
Freezing/Thawing 250
Mixture Design (cement, fly ash, or lime), 1 point 1,500
Mixture Design (curves w/Proctors, swells, daily breaks), 3-point 21600
Moisture/Density Relationship D558IT134 150
pH for estimating lime proportions (ASTM D6276) 200
Wetting/Drying 250
L. �'
2019 LABORATORY SCHEDULE OF FEES
NOT MDC ASPHALT (HMA) TESTING
HMA Tests Accredited Test Procedure Pee each. j�)
Binder Ignition Oven (BIO) AC Content D6307/T308 60
with Gradation D5444/T30 130
BIO AC Correction Factor D6307%1-308 300
Chemical Extraction AC Content D2172/T164 (plant control) 160
v�ith Gradation DS444/T30 240
Density by Nuclear Methods D2950
Hveem Stability D1560 (stability)/T296/CP-L 5106 150
Coltman (tensile strength ratio) D4867/T283 400
Marshall Mixture Design - MS 2 3,000
Marshall Mixture Design Verification (1-point) 1,750
Marshall Tests
and air
6927 and
and 269 165
Maximum Theoretical Specific Gravity (Rice value) D2041/T20� 80
SMA Asphalt Drain Down (AASHTO T305) 75
Specific Gravity (bulk), Air Voids, and Thickness D2726 and 3203/T166 and 269 35
SuperPave Mixture Design R35 3,000
SuperPave Mixture Design Verifications (1-point) R35 1,750
Thickness 20
Volumetric Properties D6925/T312/CP-L 5115 300
* per
personnel
hourly
rates
Page 2 of 5
2019 LABORATORY SCHEDULE OF FEES
Concrete Tests.
(sample delivered) C779, Procedure C 450
Absorption and Density (unit weight) 85
Accelerated Cure Specimens 35
Compressive Strength (core) C42/T24 30
Compressive Strength (cylinders) C31, 617, 1231 and 39/T23, 231 and 22 15
C617, 1231, and 39/
Compressive Strength (cylinders) cast by others T23, T231, and 22 20
Concrete Maturity Data Logger 66
Cracking Tendency Test (AASHTO T334) 950
in conjunction v�ith mixture verification 1-point 650
Flexural Strength (beam) C78/T97 40
Flexural Strength (beam) cast by others C78/T97 50
Making and Curing Test Specimens in Laboratory C192
Mixture Design (compression)
(additional charges may apply for aggregate tests) 3,000
Mixture Design (flexural)
(additional charges may apply for aggregate tests) 3,50D
Mixture r)eslan (high early. maturity, or optimized)
(additional charges may apply for a
Mixture Design (optimized maturity)
tests)
Mixture Design Verification Compression (1-point) 2,000
Mixture Design Verification Flexural (1-point) 2,500
Rapid Chloride Permeability, 2 specimens C1202/T277 500
Restrained Shrinkage (ASTM C878) `�0
Scaling Resistance (ASTM C672) at 50 cycles, 2 specimens 1,000
Shrinkage Measuring (03300 modified ASTM C157), per bar C157/T160 30
Sh�inkaae Measuring, 3 bars C157/T160 350
Slab -on -Ground Moisture and HumidltyTesting
(E 1907, Electrical Impedance; F 1869, CaCI and F 2170, RH) *
C143, 138, 172, 231, and 1064/
Slump, Unit Weight, Air Content, and Temperature T119, 121, 152, and 309
Specimen Saw Cutting/Trimming *
Static Modulus of Elasticity (ASTM C 469), per reading set 195
Sulfate Durability (ASTM C 1012) 650
Tensile Strenoth C496/T198 45
--
Thickness (core)
Underwater Abrasion Resistance Testing, 3 specimens per set C1138 1,650
Undennrater Abrasion Resistance Testing, per disk
vvithout mixture sample verification C1138 650
Water Soluble Chloride Ion in Concrete (ASTM C1218), drilled sample 75
Masonry Tests Fee each ($)
Absorption and Density (unit weight) full size specimen 7S
Absorption and Density (unit weight) coupon specimen 35
CMU Coupon Compressive Strength (ASTM C140) 45
CMU Freeze/Thaw (ASTM C1262) at 100 cycles 900
CMU Freeze/Thaw (ASTM C1262) at 150 cycles 1,20D
CMU Prism Compressive Strength 120
Grout and Mortar Cubes (3 cubes/set) C780 (Annex 6) 45/set
Prism Grout C1019 (sampling and testing) 35
Specimen Saw Cutting/Trimming
*
Page 3 of 5
per
personnel
hourly
rates
,........
.
_ . _._
_.- _
....
- . ,-
....
. .........
�:�
2019 LABORATORY SCHEDULE OF FEES
Atterberg Limits (LL, PL, and PI), Method B (i-point) D4318/T89 and 90 58
Clay Lumps and Friable Particles (per procedure grading) C142/T112 55
Compressive Strength of Rock Cores (ASTM D7012) 75
_Compressive Strength of Rock Cores (v�ith stress/strain) 250
and Voids
remolding)
T236
m
425
Fractured Faces (per
procedure
grading)
D5821/T335 55
Freezing/Thawing of
Aggregate
(AASHTO T103), 50 cycles
400
Gradation with Minus #200 Wash
Gradation with Minus #200 Wash -Pit Run
T27, 11, T2, and T248
T27, il, T2, and T248
:i
150
specific gravity) 180
Lightweight Particles Ci_23 175
Los Angeles Abrasion u � �� � � C131/1'96 �� li5
Los Angeles Abrasion (ASTM C535) 135
Micro-Devai Abrasion 150
Minus #200 Wash Ci17%fll 35
.. .. ......... _,, _._,.,,___ _. _ ..,.,. .. _�_...,.�.�.., __.,.... w_
..
Moisture Content C566/T255 20
D4718, D698, and 1557J
Moisture/Density Relationship (Proctor) T99, 180, and T224 125
_� ..
Organic Impurities �� C40/T21 � 55
Potential Alkali Reactivity (mortar bar method) C1260 675
of cementitious materials and
C1567
775
FAA Modified ASTM C1260
775
_��w.��� , _ . _. �- r _. _.. _. ,..
FAA Modified ASTM C1567 ��� - _ w. � � a � ..w. �.� �� _.
875
Relakive Density (maximum/minimum, wet or dry method) D4253/D4254 195
Riprap Wetting/Drying (ASTM D5313) 1,200
Riprap Freezing%Thav�ing (ASTM D5312), 35 cycles 850
.. _,_..
R-Value D2894/T1�90 �� � �� � � � � �275
Sand Equivalency D2419/T176 g0
Sodium/Magnesium Sulfate Soundness (per procedure grading) C88/T104 75
Specific Gravity and Absorption C127 and 128/T85 and 89 75
* per
personnel
hourly
rates
� �;b
2019 LABORATORY SCHEDULE OF FEES
PERSONNEL and MISCELLANEOUS FEES
Miscellaneous Fee ($)
hot mix asphalt (HMA) or concrete
Equipment Rental Quoted upon request
rintcnurrinn Cost t 13%
Process
Miscellaneous Tests
Fee each
Freproofing/Density (ASTM E605) 30
Laboratory unit prices include the test, review, and initial reporting.
Please contact Cesare, Inc, for combination test packages and volume discounts.
This 2019 Laboratory Schedule of Fees supersedes all previous versions.
Payment is due within thirty (30) days of our invoice date. Cesare reserves the right to apply a service charge of 1.5% per month to unpaid
balances commencing thirty (30) days from the date of Invoice and/or to cease service on any continuing project where Invoices are more than
sixty (60) days past due.
Integrity, Reliability, and Innovation
CUHPORATE C)FFICE: � P: 303-22C�-03t1t?
7108 S. Altan Way, f3tdg 6 Centennial, Cp 801 f2
Frederlclu CO => Sltverthorne, CO -• Crested Butts C4
fur award winning team has been providing
engineering services since' 1987.
rre has a highly experienced and dedicated team.
We make a difference)
our website
www.cesaretnc.com
SAE RTD Cade k's 925-17, 9I5.55, 961-48, 9G r-50 SBE Code ti's 541380, 547330
,--
.' r I �� i ceoraottsswn�s �'�/ � � � C
.. ,.e, .: s,...' Or 9 _ IIU:Nif35 11�.A,.�����
. "� rr .,umn.. „rrcn � f550C1ATtON ve.me+.a A+wcrn .:. . �.., .� A.A5HTr7
per
Page5of5
personnel
hourly
rates
..,......
_ ..
...
...
........
..�.
.........