Loading...
HomeMy WebLinkAbout 19-50 St Vrain Water Trmnt Plant Pipeline Alignment Study-CCGIRESOLUTION 19-50 A RESOLUTION OF THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, APPROVING AN AGREEMENT BETWEEN THE TOWN OF FIRESTONE AND COLORADO CIVIL GROUP, INC. REGARDING ENGINEERING SERVICES FOR THE ST. VRAIN WATER TREATMENT PLANT TRANSMISSION PIPELINE ALIGNMENT STUDY WHEREAS, the Town of Firestone (the "Town") is in need of certain engineering services for a study involving a transmission pipeline alignment from the proposed St. Vrain Water Treatment Plant to the existing storage tanks in the Town (the "Project"); and WHEREAS, Colorado Civil Group, Inc., is duly accredited and has the skill and experience to perform the engineering services required for the Project, and desires to perform the engineering services required for the Project. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: The Agreement between the Town of Firestone and Colorado Civil Group, Inc., for engineering design study services for the St. Vrain Water Treatment Transmi enssion Pipeline Alignment is approved in substantially the same form as the copy attached hereto and made a part of this resolution, and the Mayor is authorized to execute the Agreement on behalf of the Town. INTRODU ATTEST:;. Leah Vanarsdall, Town Clerk AS TO FORM: riayashr, Town Attorney ADOPTED this 12th day of June, 2019. bi Mayor 1