Loading...
HomeMy WebLinkAbout 18-19 Approving FDP Lot 5 High Plains MarketplaceRESOLUTION NV.18-19 A RESOLUTION APPROVING A FINAL DEVELOPMENT PLAN FOR LOT 5 HIGH PLAINS MARKETPLACE WHEREAS, there has been submitted to the Planning and Zoning Commission and Board of Trustees of the Town of Firestone a request for approval of a final development plan for Lot 5 High Plains Marketplace; and WHEREAS, all materials related to this application have been reviewed by Town Staff and found with conditions to be in compliance with Town of Firestone subdivision and zoning ordinances, Development Regulations, and related Town ordinances, regulations, and policies; and WHEREAS, the Firestone Planning and Zoning Commission held a properly noticed public hearing on the application, and has forwarded to the Board of Trustees a recommendation of approval with conditions; and WHEREAS, after adult' -noticed public hearing, at which evidence and testimony were entered into the record, the Board of Trustees finds the proposed final development plan should be approved, subject to certain conditions. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Section 1. The Final Development Plan for Lot 5 High Plains Marketplace is hereby approved, subject to the conditions set forth in Exhibit A attached hereto and incorporated herein by this reference. PASSED AND ADOPTED this 1 ltl' day of April, 2018. i.% v , . . - Ell ATTEST: Leah Vanarsdall, Town Clerk \ 4/6/2018 11:06 AM [}:mk] R:�Firestone\Subdivisions Lot 5 High Plains Mar}:etplace FDP TB res.docx EXHIBIT A Final Development Plan Lot 5 High Plains Marketplace Conditions of Approval General 1. Update water dedication calculations based on the criteria set forth in Ordinance 908, as directed by the Town Engineer. 2. Submit AWWA water service calculations for approval by the Town Engineer. 3. Provide Site C-Factor calculations referenced in the Drainage Concurrence Letter for review and approval by the Town Engineer, 4. Show a new fire hydrant, to provide primary coverage, in a location to be approved by the Frederick Firestone Fire Protection District, 5. Execute a development agreement, in a form to be approved by the Town Attorney. 6. Provide a metes and bounds legal description and exhibit for the 10' water easement, to be drafted by the Town. Provide executed easement to Town for recording with final documents. 7. Secure an exclusive water easement from the owners of the neighboring property (Lot 7 of High Plains Marketplace), which must be contiguous from the water meter to the existing easement at the water main. 8. Address redlines that accompanied the Town Engineer's December 18, 2017 memorandum. 9. Provide an updated title commitment, dated no later than one month prior to submitting final documents for recording. 10. Provide a detail of the proposed street, parking and wall mounted lights. Street and/or parking lot lights shall be consistent with the existing lots in High Plains Marketplace. 11. Provide a site details sheet to include the following details: (a) All signage: Building, tenant, drive -through, pole sign/monument sign, and any other signage. (b) Bike rack detail. (c) Trash enclosure detail. Sheet 1 over Sheet 12. Correct sheet title discrepancy for Sheet 9 (index uses title "Irrigation Details," but title on Sheet 9 is "h7igation Plan"). 13. Revise legal description as directed by the Town Engineer, 14. Revise the electric service provider to United Power. 15. Verify the site address provided. The address is inconsistent on the Cover Sheet and under the Building Address section on Sheet 2. Sheet 2 -Notes Sheet 16. Provide updated water dedication requirements in the water dedication text. 17. Revise the reference to Quest Communications to read CenturyLink. Sheet 3 -Site Plan 18. Provide the location of the proposed trench drain on the west side of the building. 19. Label the property boundary with bearings and distances, which must match the High Plains Marketplace Final Plat. Sheet 4 —Utility Plan 2us Show the location of the proposed electrical line. Clarify whether there will be any electricity run from the building to the drive-thru menus. 21. Show the location of proposed street lights. Sheet 6 —Landscape Plan 22. Update landscape plan to screen the entire trash enclosure and transformer from the north. Remove plant symbols located on top of proposed transformer location to the east of the trash enclosure. Ensure all map sheets reflect the correct location of the proposed transformer. Sheet 7 —Landscape Details 23. Remove all references to the contractor from Landscape Notes; the Owner is responsible for constructing all improvements shown in the FDP, regardless of whether the Owner chooses to meet this obligation by hiring contractors. Sheet 8 —Irrigation Plan 24. Provide a symbol on the plan of the master valve location and identify in the legend. 25. Revise the irrigation plans to move the backflow preventer into a landscape bed where it will be screened. 3 Sheet 14 — Photometric Plan -Halide Option 26. Remove the second photometric plan showing Halide lamp options, as the lighting provided will be LED.