Loading...
HomeMy WebLinkAbout 18-23 Approving FP & FDP Barefoot Lakes F3RESOLUTION 11N 0.18- 23 A RESOLUTION APPROVING A FINAL PLAT AND FINAL DEVELOPMENT PLAN FOR BAREFOOT LAKES FILING NO. 3 WHEREAS, there has been submitted to the Planning and Zoning Commission and Board of Trustees of the Town of Firestone a request for approval of a final plat and final development plan for Barefoot Lakes Filing No. 3; and WHEREAS, all materials related to this application have been reviewed by Town Staff and found with conditions to be in compliance with Town of Firestone subdivision and zoning ordinances, Development Regulations, and related Town ordinances, regulations, and policies; and WHEREAS, the Firestone Planning and Zoning Commission held a properly noticed public hearing on the application, and has forwarded to the Board of Trustees a recommendation of approval with conditions; and WHEREAS, after aduly-noticed public hearing, at which evidence and testimony were entered into the record, the Board of Trustees finds the proposed final plat and final development plan should be approved, subject to certain conditions. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COL ORADO: Section 1. The Final Plat and Final Development Plan for Barefoot Lakes Filing No. 3 are hereby approved, subject to the conditions set forth in Exhibit A attached hereto and incorporated herein by this reference. PASSED AND � is ra day of May, 2018. °�` 0 C® 00 bi sindelgk, Mayor cou ATTEST: Leah Vanarsdall, Town Clerk 5/18/2018 2:59 PM [}:mk] R:Tirestone\Subdivisions�Barefoot F3 FP and FDP TB res.docx EXHIBIT A Final Plat Final Development Plan Barefoot Lakes Filing No. 3 Conditions of Approval General 1. Provide an updated title commitment when the mylars are provided for recording, to confirming all owners have signed the final plat and FDP. 2. Include reception numbers for Barefoot Lakes Filing No. 1 and Barefoot Lakes Filing No. 2 on the final plat, FDP, and final utility plans. 3. Confirm, or coi7ect as necessary, the areas for OS-B1 and OS-B2 in the Runoff Summary Table and the Final Drainage Plan Map, 4. Revise the Drainage Map as directed by the Town Engineer and provide a signed and stamped copy. 5. In the Final Drainage Report Filing No. 2-Amendment No. 1, provide the Type C area inlet calculation. 6. In the Final Drainage Report Filing No. 2-Amendment No. 1, include the calculation requested by the Town Engineer and provide a signed and stamped copy. 7. Execute a subdivision agreement, in a form to be approved by the Town Attorney. 8. The location of the pipeline in the Kelm -McGee right -of --way in Tract D needs to be shown and the required setback labeled on both the final plat and the FDP. Final Plat 9. Revise the owner information in the Ownership and Dedication block as necessary to conform with the updated title commitment. 10. On Sheets 4-6, label an additional sight distance easement in Tract B to preserve the sight line along Barefoot Lakes Boulevard and add the following note: "The variable width sight distance easement is a no -build area and restricts vegetation and permanent structures more than three feet tall." Final Development Plan 11. Coi�•ect the sheet index on Sheet 1; Sheet 24 is missing and all subsequent sheets after are incorrectly numbered. 2 12. The font size for the first two words in the Project Narrative (Project Concept) section on Sheet 2 needs to be adjusted. 13. no eeL2, the final sentence in the second paragraph of the Proj ect Concept section should be revised to read as follows (words to be deleted str4eke; words to be added underlined): "Following the Regional Park Filing No. 1 FDP, this FDP is the f ,,, t p 4 e continues what is becoming a robust active and passive recreation program...." 14. Revise the Enhanced Elevation Table on Sheet 3 to reflect the following: ENHANCED ELEVATION TABLE LOT NUMBER ENHANCEMENT LOCATION RIGHT LEFT REAR BLOCK 1 12 X 13 X 14 X 15 X 16 X 17 X 18 X 19 X 20 X 21 X 22 X 23 X 24 X X 15. On Sheet 3, Accessory Structure, note 3, add the following: "All accessory buildings shall be located on the ground." 16. On Sheet 10, provide a description of the procedure, method, timing and general water demand impacts of any landscape phasing plan within the FDP sheets. Final Utility Plans 17. On Sheet 3.1 (Details), provide a detail of the spillway located in Tract C behind the 10' Inlet and provide erosion protection. 18. On Sheet 4.0, revise to reflect the storm sewer manhole will be installed 6"below the gravel road surface and add a carsonite marker post to locate the center of the manhole. 3 19. On Sheets 5.1-5.4 (Street Plan & Profile), add the existing grade to the profiles and fade any existing or future improvements and features to clearly depict what is being built with this Filing No. 3. 20. On Sheets 8.6 and 8.10 (Details), identify where the sidewalk chase is located and revise all details to reflect current Town details. 21. Revise the plans to include detail for perimeter fencing, consistent with perimeter fence design used for prior filings. The Subdivider shall install the perimeter fencing as part of the Filing No. 3 improvements. 22. Side yard setbacks for attached units shall comply with standards in the Development Regulations, except that the Planning Department is authorized to approve revisions to the setback table to allow uncovered deck and patio encroachments for specified lots of not more than two feet into a side yard setback (but in no event into required utility or structure separation areas). All revised side yard setback details shall be added to the plans after staff review and approval and prior to recording. L!