HomeMy WebLinkAbout 18-33 Gateway N MF Phase 2 FDPRESOLUTION N"* 18-33
A RESOLUTION APPROVING A FINAL DEVELOPMENT PLAN FOR GATEWAY NORTH —
MULTI -FAMILY (PHASE 2)
WHEREAS, there has been submitted to the Planning and Zoning Commission and Board
of Trustees of the Town of Firestone a request for approval of a final development plan for Gateway
North — Multi -Family (Phase 2); and
WHEREAS, all materials related to this application have been reviewed by Town Staff and
found with conditions to be in compliance with Town of Firestone subdivision and zoning
ordinances, Development Regulations, and related Town ordinances, regulations, and policies; and
WHEREAS, the Firestone Planning and Zoning Commission held a properly noticed public
hearing on the application, and has forwarded to the Board of Trustees a recommendation of
approval with conditions; and
WHEREAS, after aduly-noticed public hearing, at which evidence and testimony were
entered into the record, the Board of Trustees finds the proposed final development plan should be
approved, subject to certain conditions.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE
TOWN OF FIRESTONE, COLORADO:
Section 1. The Final Development Plan for Gateway North — Multi -Family (Phase 2) is
hereby approved, subject to the conditions set forth in Exhibit A attached hereto and incorporated
herein by this reference.
PASSED AND ADOPTED ���",day of September, 2018.
ATTEST:
p�aaYV�Jyj�ax-1'
Leah Vanarsdall, Town Clerk
EXHIBIT A
Gateway IS — Multi -Family (Phase 2)
Final Development Plan
Conditions of Approval
General
1. Provide an updated title commitment when the mylars are provided for recording, dated
within thirty (30) days prior to the date of mylar submission.
2. Provide a Traffic Compliance letter, confirming the improvements shown on the FDP are
in compliance with the previously approved TIS titled "Firestone Multi -Family and
Storage" prepared by Eugene G. Coppola dated September 7, 2016.
3. Provide a Drainage Compliance letter, confirming the improvements shown on the FDP
are in compliance with the previously approved Final Drainage Report titled "Drainage
Report Gateway North — Multi -Family" prepared by RidgeTop Engineering and
Consulting dated August 2, 2017.
4. Revise the FDP to address Town Engineer redlines.
5. Revise the provided site area square footage and acreage as necessary to correct conflicts
throughout.
FDP Sheet 1 (Cover Sheet)
6. On all sheets (Sheets 1-20 in current submittal), revise title to read "Gateway North —
Multi -Family (Phase 2)." Underneath the title, add "An Amendment to a portion of
Gateway North — Multi -Family FDP."
7. On all sheets (Sheets 1-20 in current submittal), add the phase number "2" in the
Firestone Information Block.
8. Delete the third sentence of the Project Concept section ("Phases 1 and 3 are shown for
illustrative purposes only.") Revise the remaining text to reflect this is the FDP for Phase
2.
9. Reconcile conflicts between the Land Use Table, Site Data table, and Legal Description.
10. In the Parks, Trails, and Open Spaces section, correct the acreage to match the area in the
legal description (5.817 acres) and update the cash -in -lieu amount ($11,634.00).
11. Revise the Drainage section to address Town Engineer redlines.
12. Revise the water dedication paragraph as directed by the Town Engineer, which will
reflect a raw water dedication of 63 CBT shares.
13. In the Parking Data section, clarify the parking ratio (Town Engineer calculated 1.42).
14. In the Project Concept section, include the zoning and all use information.
15. In the Architecture section, revise the first sentence to read "Our design approach for
Gateway North Multi -Family Phase II was to...."
16. Provide a plan expiration statement in the Development Schedule section.
FDP Sheet 2 (Phasing Plan)
IT On all sheets showing phasing (Sheets 2-3, 5-7, 10, 13 and 14 in current submittal), add
or fix the text labels "Existing Phase 3, Existing Phase 1 and Phase 2."
18. Revise as necessary to reflect the correct site data.
FDP Sheet 3 (Overall Site Plan)
19. Clarify the fencing along the Rural Ditch.
20. Show and label setbacks.
21. Clarify the location of the proposed fence and existing fence. Provide information
regarding who will construct the fence and when.
22. Remove the callouts next to the legend, for clarity.
23. Show location of mailboxes, as applicable.
FDP Sheet 4 (Horizontal Control Plan)
24. On Sheets 4-7, revise Phase 2 dimensions, text, and utility symbols from faded back to
bold or normal pen weight text.
FDP Sheet 5 (Overall Grading Plan)
25. Provide the final ground elevations within 10' of the buildings.
26. On Sheets 5 and 6, several Phase 1 texts need to be faded back.
FDP Sheet 6 (Overall Utility Plan)
27. Show and provide further information about the gas line that runs through the project and
is shown on the First Amendment of the Del Camino Central Outline Development Plan.
FDP Sheet 8 (Photometric Plan)
28. Update the quantities in the table for Phase 2 (quantities shown are for Phases 1 and 3)
and remove the old Phase 2 note that appeared on the FDP for Phases 1 and 3.
Sheet 9 (Detail Sheet)
29. Provide details of mailboxes, as applicable.
FDP Sheets 14 and 15 (IrrirMation DesirMn)
30. Remove the old Phase 2 note.
4