Loading...
HomeMy WebLinkAbout 18-37 FP-FDP Oak Meadows Townhomes 092618RESOLUTION N0.18-37 A RESOLUTION APPROVING A FINAL PLAT AND FINAL DEVELOPMENT PLAN FOR OAK MEADOWS TOWNHOMES WHEREAS, there has been submitted to the Planning and Zoning Commission and Board of Trustees of the Town of Firestone a request for approval of a final plat and final development plan for Oak Meadows Townhomes; and WHEREAS, all mater7als related to this application have been reviewed by Town Staff and found with conditions to be in compliance with Town of Firestone subdivision and zoning ordinances, Development Regulations, and related Town ordinances, regulations, and policies; and WHEREAS, the Firestone Planning and Zoning Commission held a properly noticed public hearing on the application, and has forwarded to the Board of Trustees a recommendation of approval with conditions; and WHEREAS, after aduly-noticed public hearing, at which evidence and testimony were entered into the record, the Board of Trustees finds the proposed final plat and final development plan should be approved, subject to certain conditions. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Section 1. The Final Plat and Final Development Plan for Oak Meadows Townhomes are hereby approved, subject to the conditions set forth in Exhibit A attached hereto and incorporated herein by this reference. PASSED AND ADOPTED this 26th day of September, 2018. Town ATTEST: � � AIT ( _ AVTY, Leah Vanarsdall, Town Clerk EXHIBIT A Oak Meadows Townhomes Final Plat and Final Development Plan Conditions of Approval General 1. Provide an updated title commitment when the mylars are provided for recording, dated no later than thirty (30) days prior to submission of mylars. 2. Execute a subdivision agreement, in a form to be approved by the Town Attorney. 3. Provide evidence of formation of homeowners' association. 4. Execute a deed conveying Tract A to the homeowners' association 5. Consolidate the drainage compliance letter, supplemental drainage analysis, and any other drainage reports or updates into the Final Drainage Report for Oak Meadows Townhomes. Include a drainage map and address any questions or concerns of the Town Engineer. 6. Execute off -site drainage easement across the Town -owned Tract T, Oak Meadows PUD Filing No. 1. Final Plat 7. On Sheet 1, revise the ownership of Tract B in the Tract Use Summary Table to read "Owner." 8. In the Notes, regarding dedication of easements over Tract A and Tract B, revise each note to read "is hereby dedicated" (not "shall be dedicated"). Final Development plan —Sheet 1 (Cover Sheet) 9. Provide the name of the technical consultants who prepared the FDP. Final Development Plan —Sheet 2 (General Notes) 10. Confirm whether the townhome units will have basements. 11. Add the following statement to the Parks, Trails and Open Space section: "The regional trail will be constructed at the time that Tract B re -develops." 12. Within the Parks, Trails and Open Space section, provide across -reference to any previously recorded dedication that shows the public land dedication has been previously satisfied. 13. In the Controls section, revise the ownership of Tract B in the land use table to read "Owner." 2 14. In the second to last paragraph of the Water Dedication section, revise "A total of 7 acre- feet" to read "A total of 6.3 acre-feet." 15. Modify Tract B as reflected in Town Engineer's redlines. 16. In the Private Maintenance and Enforcement section, revise "Property Owner's Association" to read "Homeowners' Association." 17. Within the Site Design and Architecture section, Note #7, revise to read "The provided enhanced elevations table identifies the architectural treatments required for the noted lots in the FDP." 18. Within the Elevations and Options Number table, provide an enhance elevation option for the rear elevation of Lot 8. 19. At the end of the third sentence in the last paragraph of the Landscaping section, include an exact date (month and year) for when the temporary irrigation system will be physically disconnected. 20. In the Development Schedule section, provide a sentence that states the following: "This Final Development Plan will expire years from the date of approval." 21. Within the Development Schedule section, provide information on the specific development schedule for all fencing to be constructed by the developer. Final Development Plan —Sheet 8 (Landscape Plan West) 22. Add a reference to Note #2. Final Development Plan —Sheet 14 (Fencing Plan) 23. Under the Vinyl Privacy Fence — 6' Height Detail, revise "Property Owner's Association" to read "Homeowners' Association." 24. Provide information regarding the development and construction responsibility for all fencing shown. Final Development Plan —Sheet 17 (Site Details) 25. Specify the color of the mailbox kiosk. Final Development Plan —Sheet 18 (Overall Utility Plan) 26. Change the inlet numbers to match the Drainage Report. Revise Utility Plans to address Town Engineer redlines. Final Utility Plans 3 27. On Sheets 3 and 4 (Site, Easement), label the 20 existing oil/gas pipeline easement. Remove label that this is a 20' utility and access easement, as the plat dedicates a blanket utility, pedestrian and access easement over all of Tract B. 28. On Sheets 3 and 7 (Site and Utility Plan, Tract B note), modify the Tract B note as directed in Town Engineer redlines. 29. On Sheet 7 (Utility Plan), add lot number to the plan. Install a temporary blow -off valve instead of a temporary fire hydrant between Lots 6 and 7 (note has been updated, but the fire hydrant symbol needs to be removed). 30. On Sheet 8 (Sanitary Sewer Plan and Profile), check the water crossing near Station 4+50, as noted in Town Engineer redlines. 31. On Sheet 9 (Water Plan and Profile), check the sanitary sewer crossing at Station 2+08.82, as noted in Town Engineer redlines. Remove the fire hydrant symbol for the 2" temporary blow -off valve assembly. Replace the blow -off detail with the Town's updated detail W- 4. 32. On Sheet 10 (Storm Plan and Profile), change the inlet numbers to match the Drainage Report. Call out wrap of storm sewer joints over water main as noted in Town Engineer redlines. Increase size of profile text. Add a headwall at the end of the storm sewer. Confirm 274nch RCP is a readily available size. 0