Loading...
HomeMy WebLinkAbout 17-22 Approving FDP for Gateway NRESOLUTION NO. 17-22 A RESOLUTION APPROVING A FINAL DEVELOPMENT PLAN FOR GATEWAY NORTH —MULTI -FAMILY WHEREAS, there has been submitted to the Planning and Zoning Commission and Board of Trustees of the Town of Firestone a request for approval of a final development plan for Gateway NorthMulti-Family; and WHEREAS, all materials related to this application have been reviewed by Town Staff and found with conditions to be in compliance with Town of Firestone subdivision and zoning ordinances, Development Regulations, and related Town ordinances, regulations, and policies; and WHEREAS, the Firestone Planning and Zoning Commission held a propezly noticed public hearing on the application, and has forwarded to the Board of Trustees a recommendation of approval with conditions; and WHEREAS, after aduly-noticed public hearing, at which evidence and testimony were entered into the record, the Board of Trustees finds the proposed final development plan should be approved, subject to certain conditions. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO: Section 1. The Final Development Plan for Gateway North —Multi -Family is hereby approved, subject to the conditions set forth in Exhibit A attached hereto and incorporated herein by this reference. PASSED AND ADOPTED this 269' day of April, 2017. ` — Paul Sorensen, Mayor ATTEST: kChy town cklk. U��� Esr®A41� EXHIBIT A Final Development Plan Gateway North —Multi -Family Conditions of Approval 1. In the third line of the Project Concept section on Sheet 1, revise "building" to read "buildings.' 2. Revise the Private Maintenance and Enforcement section on Sheet 1 to reflect no private maintenance agreements are anticipated, as the site will be under unified ownership and maintenance. 3. Revise the Water Dedication section on Sheet 1 to reflect dedication amount as confirmed by the Town Engineer, in whole numbers of CB-T shares. 4. In the Parking Data section on Sheet 1, provide total of parking internal landscaping. 5. On Sheet 5, add a note that final elevations shall not exceed minimum FFE by more than 2 feet. 6. Add sheet title names to the Firestone Information Block on Sheets 10-24. 7. On Sheet 12, include details for ornamental grasses, including the maximum height. 8. On Sheet 13, include information on the condition of the plant material to be used. 9. On Sheet 13, provide a note on landscape phasing and include a description of the procedure, method, timing and general water demand impact. 10. Add a north arrow and scale on irrigation plan sheets (Sheets 16-18). 11. Revise application materials to address comments set forth in the Town Engineer's memorandum dated March 27, 20175 a copy of which is attached hereto as Exhibit A-1. 12. Confirm the adequacy of the water line to the pool/clubhouse to the satisfaction of the Town Engineer. 4/28/2017 11:66 AM [kmlc] R:\Firestone\Subdivisions\Crateway North Multi -Family FDP 1B res (final).dce 2 EXIIIBIT A-1 3 COLORADO CIVIL GROUP, INC. Engineering Consultants TO: Mr. Bruce Nickerson, The Town of Firestone, Town Manager FROM: Dave Lindsay, Colorado Civil Group, Inc., Town Engineer Amber Messersmith, Colorado Civil Group, Inc., Town EngineerQ LNA.%, . DATE: March 27, 2017 SUBJECT: Gateway North -Multi Family PROJECT No.: 0668.0047.04 We have completed our review of the Gateway North - Multi -Family Final Development Plan 4th submittal received on February 27, 2017. We offer the following comments: General: 1. The Del Camino Central Filing No. 2 Final Plat will need to be recorded prior to this site specific FDP. 2. The public improvements for this FDP are included in the Gateway North Final Utility Plans (FUP) GMd the DCC F2 Subdivision Agreement. Submittal Binder: 3. Title Commitment (10.3.5) -The Title Commitment lists the owners in fee as Sand Land, Inc. a Colorado corporation and Sand Land Properties, LLC aka Sand Land Properties LLC with an effective date of December 16, 2015. An updated Title Commitment is required, dated no later than one month, prior to recording. 4. Water Dedication (10.3.10) —This submittal included the requested 12 months of actual water bills for the clubhouse/pool. The re -submittal did not include any actual water bills for a similar sized Maintenance bldg. or the irrigation usage for the drip system. DOMESTIC DEMAND - Apartments -The domestic demand for the apartments will be 0.37 CBT shares per unit (0.37 CBT shares * 405 units) = 149.85 CBT shares. Clubhouse/Pool — Based upon the 12 months of actual water bills from a similar clubhouse/pool facilities the domestic demand is calculated to be to 0.49 CBT shares. 3 Maintenance Bldg. - We need the annual usage or actual water bills for the maintenance building. (repeat) If this information is not received with the next submittal, we use a domestic demand of 0.5 CBT shares. We will calculate the total domestic demand with the next submittal. IRRIGATION DEMAND he Turf Irrigation demand is calculated to be 2.74 CBT shares (based on 47,797 SF at 2.5 CBT shares/acre). For the Drip Irrigation, the Town will consider a reduced demand based on the estimated annual drip usage. (The Applicant's irrigation consultant will need to provide us with an estimated annual usage for the drip system with all assumptions clearly stated). (repeat) If this information is not provided, then the irrigation demand will be calculated to be 9.27 CBT shares (based 161,613 SF at 2.5 CBT shares/acre). TOTAL CBT SHARES — We will calculate the Total CBT water shares with the next submittal. 5. AWWA Water Service Calculations (10.3.11) — AWWA water service sizing calculations were reviewed. The MF-24-plex building calculations were previously approved and a 1.5" tap/meter is acceptable. The MF-21-plex building calculations are still missing the page 2 fixtures counts. Since the 21-plex should have less fixture counts than the 24-plex and the same tap/meter size is proposed, a 1.5" tap/meter is acceptable. The MF Maintenance building calculations are approved and a 5/8" tap/meter is acceptable. The MF Clubhouse/pool calculations (fixtures counts) were not included with this submittal. Refer to our previous comments/redlines. Final Drainage Report (FDR) (10.3.15): 6. The Drainage Report is titled "Drainage Report Gateway North -Multi -Family" prepared by RidgeTop Engineering and Consulting dated February 23, 2017 was reviewed. 7. (Outlet Pipe) - A plan &profile of the 30" outlet pipe must be included in the FUP's as it will be built with Phase 1.0 and Arbor St. 8. (Arbor St Culverts, public improvements) —The last two paragraphs of Section 6 on Page 8 regarding the culverts in Arbor St need to be removed from this FDR and put in the Drainage Conveyance Report for the Gateway North Final Utility Plans (FDR-FUP). These culverts will be built with Phase 1.0, not with the MF phase. In addition, the Drainage Map for this FDR, the hydrology calculations (rational) and the 18" culvert ROW pipe flow for design points 5;14 need to be removed from this FDR and added to the FUP-FDR (this are public improvements). 9. Detention Calculations —The southern detention pond appears to be deeper than the northern pond was with the last submittal. Do the detention calculations need to be updated (Total available Detention Depth of 4.55' instead of 4')? 10. Drainage Map —The storm sewer pipes need to be labeled on the MF site. 11. Refer to the FDR for additional redlines. Gateway North Multi -Family Final Development Plan (Furl Map: 12. Sheets 10-24 (10.5.1 Firestone Information Block) —The total sheet # of "25" needs to be updated on these sheets. Sheets 21-24 need the sheet # of # filled in. 13. Sheet 1 (10.5 FDP Text) — We have redlined several of the text sections that have typos and with the Town Attorneys comments. 14. Sheet 1 (10.5 Private Maintenance and Enforcement) —This section needs to be revised. Any maintenance agreements for the private open space must be done now with this FDP. Provide any agreements to the Town. 15. Sheet 1 (10.5 Parks, Trails, and Open Space) —Replace the last sentence of this section with the following: "The Public land dedication requirement will be met by cash -in -lieu payment to the Town due prior to recording the FDP. The cash4dieu amount is calculated to be $40,426.00 (based on $25,000.00/acre * 20.213 acres * 8%). 16. Sheet 1 (Note) —Change the title of the note at the bottom of the page from "REQUIREMENT FOR CENTIFICATES OF OCCUPANCY" to read "REQUIRMENTS FOR BUILDING PERMITS AND CERFICATES OF OCCUPANCY". Change the order of the notes, the building permit note should be #1. 17. Sheet 1 (10.5.14 Drainage) — In the first sentence change "The grading will be designed..." to read The grading is designed...". Update the FDR date to read "February 23, 2017. (update this date as necessary until the FDR is approved. 18. Sheet 1 (10.5.16 Water Dedication) —Change the text "bases" to read "based" in the first and last sentences. We will calculate the water dedication if the requested information from Comment #4 is submitted. 19. Sheet 1 (Water Meter Table) —Edit the water meter table as follows: WATER METER TABLE QUANTITY SIZE TYPE 18 1.5" MultkFamil 1 3/4" Commercial Clubhouse/Pool 1 5/8" Commercial Maintenance Bldg. 1 1.53' Irrigation We cannot confirm the clubhouse meter size until the calculations are revised and resubmitted per our last review. 20. Sheet 1 (10.5.20 Development Schedule) The dates need to be updated. 5 Misc: 21. Sheet 5 (10.6.26 Overall Grading Plan) — A storm plan and profile of the 30 outlet pipe must be added to the FUP's. This pipe will be constructed when Arbor St. is built. Z. Sheet 6 (10.6.52 Overall Utility Plan) — Refer to the Del Camino Central Filing No, 2 FP/Gateway North FUP comments memo and redlines. The water main near the MF building H needs to be moved out of the sidewalk and located in the asphalt. We cannot confirm the clubhouse/pool meter size until the calculations are revised and resubmitted per our last review comments. 23. Sheets 6 & 11 (Maintenance Meter) —The meter note needs to be moved on Sheet 6. The maintenance meter needs to be moved to the correction location on Sheet 11. 24. Sheet 8 (10.6.54 Photometric Plan) —The finish and height of the light poles needs to be called out. Confirm that this lights are consistent with the proposed adjacent Self -Storage lights. 25. Sheet 15 (10.6.40 Irrigation) —Add public works phone number of "303-833-3544" to Note #14, as redlined. 26. Sheet 25 (10.6.50 Building Elevation Plans) —The building elevations for the Maintenance Building and the Pool Building should be labeled as such. 27. See scanned FDP redlines for any additional comments. 28. Need to make independent submittals to the Frederick- Firestone Fire Protection District, the St. vrain Sanitation District and Weld County Public Works. The Applicant should return their responses to the comments and any original redlined drawings with their next submittal. COLORAbO CIVIL GROUP, INC. Engineering Consultants PTO: FROM: DATE: SUBJECT: EXHIBIT A-1 Mr. Bruce Nickerson, The Town of Firestone, Town Manager Dave Lindsay, Colorado Civil Group, Inc., Town Engineer Amber Messersmith, Colorado Civil Group, Inc., Town Engineer �A) March 27, 2017 Gateway North -Multi Family PROJECT No.: 0668.0047.04 We have completed our review of the Gateway North - Multi -Family Final Development Plan 4th submittal received on February 27, 2017. We offer the following comments: General: 1. The Del Camino Central Filing No. 2 Final Plat will need to be recorded prior to this site specific FDP. 2. The public improvements for this FDP are included in the Gateway North Final Utility Plans (FUP) and the DCC F2 Subdivision Agreement. Submittal Binder: 3. Title Commitment (10.3.5) -The Title Commitment lists the owners in fee as Sand Land, Inc. a Colorado corporation and Sand Land Properties, LLC aka Sand Land Properties LLC with an effective date of December 16, 2015. An updated Title Commitment is required, dated no later than one month, prior to recording. 4. Water Dedication (10.3.10) —This submittal included the requested 12 months of actual water bills for the clubhouse/pool. The re -submittal did not include any actual water bills for a similar sized Maintenance bldg. or the irrigation usage for the drip system. DOMESTIC DEMAND - Apartments -The domestic demand for the apartments will be 0.37 CBT shares per unit (0.37 CBT shares * 405 units) = 149.85 CBT shares. Clubhouse/Pool — Based upon the 12 months of actual water bills from a similar clubhouse/pool facilities the domestic demand is calculated to be to 0.49 CBT shares. 3 11. Refer to the FDR for additional redlines. Gateway North Multi -Family Final Development Plan (FDP) Map: Z. Sheets 10-24 (10.5.1 Firestone Information Block) — The total sheet # of "25" needs to be updated on these sheets. Sheets 21-24 need the sheet # of # filled in. 13. Sheet 1 (10.5 FDP Text) — We have redlined several of the text sections that have typos and with the Town Attorneys comments. 14. Sheet 1 (10.5 Private Maintenance and Enforcement) —This section needs to be revised. Any maintenance agreements for the private open space must be done now with this FDP. Provide any agreements to the Town. 15. Sheet 1 (10.5 Parks, Trails, and Open Space) —Replace the last sentence of this section with the following: "The Public land dedication requirement will be met by cash -in -lieu payment to the Town due prior to recording the FDP. The cash -in -lieu amount is calculated to be $40,426.00 (based on $25,000.00/acre * 20.213 acres * 8%). 16. Sheet 1 (Note) —Change the title of the note at the bottom of the page from "REQUIREMENT FOR CENTIFICATES OF OCCUPANCY" to read "REQUIRMENTS FOR BUILDING PERMITS AND CERFICATES OF OCCUPANCY". Change the order of the notes, the building permit note should be #1. 17. Sheet 1 (10.5.14 Drainage) — In the first sentence change "The grading will be designed..." to read "The grading is designed...". Update the FDR date to read "February 23, 2017. (update this date as necessary until the FDR is approved. 18. Sheet 1 (10.5.16 Water Dedication) —Change the text "bases" to read "based" in the first and last sentences. We will calculate the water dedication if the requested information from Comment submitted. 19. Sheet 1 (Water Meter Table) —Edit the water meter table as follows: WATER METER TABLE QUANTITY SIZE TYPE 18 1.5" Multi -Family 1 3/4" Commercial Clubhouse/Pool 1 5/8" Commercial Maintenance Bldg.) 1 1.5" Irrigation We cannot confirm the clubhouse meter size until the calculations are revised and resubmitted per our last review. 20. Sheet 1 (10.5.20 Development Schedule) —The dates need to be updated. 5 EXHIBIT A Final Development Plan Gateway North —Multi -Family Conditions of Approval 1. In the third line of the Project Concept section on Sheet 1, revise "building" to read "buildings." 2. Revise the Private Maintenance and Enforcement section on Sheet 1 to reflect no private maintenance agreements are anticipated, as the site will be under unified ownership and maintenance. 3. Revise the Water Dedication section on Sheet 1 to reflect dedication amount as confirmed by the Town Engineer, in whole numbers of CB-T shares. 4. In the Parking Data section on Sheet 1, provide total of parking internal landscaping. 5. On Sheet 5, add a note that final elevations shall not exceed minimum FFE by more than 2 feet. 6. Add sheet title names to the Firestone Information Block on Sheets 10-24. 7. On Sheet 12, include details for ornamental grasses, including the maximum height. 8. On Sheet 13, include infoirnation on the condition of the plant material to be used. 9. On Sheet 13, provide a note on landscape phasing and include a description of the procedure, method, timing and general water demand impact. 10. Add a north arrow and scale on irrigation plan sheets (Sheets 16-18). 11. Revise application materials to address comments set forth in the Town Engineer's memorandum dated March 27, 2017, a copy of which is attached hereto as Exhibit A-1. 12. Confirm the adequacy of the water line to the pool/clubhouse to the satisfaction of the Town Engineer. 4/28/2017 11:56 AM [hmk] R:�Firestone�.Subdivisions\Gateway Noah Multi -Family FDP TB res (final).doc COLORADO CIVIL GROUP, INC. Engineering Consultants TO: Mr. Bruce Nickerson, The Town of Firestone, Town Manager FROM: DATE: SUBJECT: Dave Lindsay, Colorado Civil Group, Inc., Town Engineer ' t `- Amber Messersmith, Colorado Civil Group, Inc., Town Engineer March 27, 2017 Gateway North -Multi Family a PROJECT No.: 0668.0047.04 We have completed our review of the Gateway North - MultkFamily Final Development Plan 4th submittal received on February 27, 2017. We offer the following comments: General: 1. The Del Camino Central Filing No. 2 Final Plat will need to be recorded prior to this site specific FDP. 2. The public improvements for this FDP are included in the Gateway North Final Utility Plans (FUP) and the DCC F2 Subdivision Agreement. Submittal Binder: 3. Title Commitment (10.3.5) -The Title Commitment lists the owners in fee as Sand Land, Inc. a Colorado corporation and Sand Land Properties, LLC aka Sand Land Properties LLC with an effective date of December 16, 2015. An updated Title Commitment is required, dated no later than one month, prior to recording. 4. Water Dedication (10.3.10) —This submittal included the requested 12 months of actual water bills for the clubhouse/pool. The re -submittal did not include any actual water bills for a similar sized Maintenance bldg. or the irrigation usage for the drip system. DOMESTIC DEMAND - Apartments -The domestic demand for the apartments will be 0.37 CBT shares per unit (0.37 CBT shares * 405 units) = 149.85 CBT shares. Clubhouse/Pool — Based upon the 12 months of actual water bills from a similar clubhouse/pool facilities the domestic demand is calculated to be to 0.49 CBT shares. 3 Maintenance Bldg. - We need the annual usage or actual water bills for the maintenance building. (repeat) If this information is not received with the next submittal, we use a domestic demand of 0.5 CB shares. We will calculate the total domestic demand with the next submittal. IRRIGATION DEMAND - The Turf Irrigation demand is calculated to be 2.74 CB shares (based on 47,797 SF at 2.5 CBT shares/acre). For the Drip Irrigation, the Town will consider a reduced demand based on the estimated annual drip usage. (The Applicant's irrigation consultant will need to provide us with an estimated annual usage for the drip system with all assumptions clearly stated). (repeat) If this information is not provided, then the irrigation demand will be calculated to be 9.27 CBT shares (based 161,613 SF at 2.5 CB shares/acre). TOTAL CBT SHARES — We will calculate the Total CBT water shares with the next submittal. 5. AWWA Water Service Calculations (10.3.11) — AWWA water service sizing calculations were reviewed. The MF-24-plex building calculations were previously approved and a 1.5" tap/meter is acceptable. The MF-21-plex building calculations are still missing the page 2 fixtures counts. Since the 21-plex should have less fixture counts than the 24-plex and the same tap/meter size is proposed, a 1.5" tap/meter is acceptable. The MF Maintenance building calculations are approved and a 5/8" tap/meter is acceptable. The MF Clubhouse/pool calculations (fixtures counts) were not included with this submittal. Refer to our previous comments/redlines. Final Drainage Report (FDR) (10.3.15): 6. The Drainage Report is titled "Drainage Report Gateway North -Multi -Family" prepared by RidgeTop Engineering and Consulting dated February 23, 2017 was reviewed. 7. (Outlet Pipe) - A plan &profile of the 30" outlet pipe must be included in the FUP's as it will be built with Phase 1.0 and Arbor St. 8. (Arbor St Culverts, public improvements) —The last two paragraphs of Section 6 on Page 8 regarding the culverts in Arbor St need to be removed from this FDR and put in the Drainage Conveyance Report for the Gateway North Final Utility Plans (FDR-FUP). These culverts will be built with Phase 1.0, not with the MF phase. In addition, the Drainage Map for this FDR, the hydrology calculations (rational) and the 18" culvert ROW pipe flow for design points 5.14 need to be removed from this FDR and added to the FUP-FDR (this are public improvements). 9. Detention Calculations —The southern detention pond appears to be deeper than the northern pond was with the last submittal. Do the detention calculations need to be updated (Total available Detention Depth of 4.55' instead of 4')? 10. Drainage Map —The storm sewer pipes need to be labeled on the MF site. 11. Refer to the FUR for additional redlines. Gateway North Multi -Family Final Development Plan (FDP) Map: 12. Sheets 10-24 (10.5.1 Firestone Information Block) —The total sheet # of "25" needs to be updated on these sheets. Sheets 21-24 need the sheet # of # filled in. 13. Sheet 1 (10.5 FDP Text) — We have redlined several of the text sections that have typos and with the Town Attorney's comments. 14. Sheet 1 (10.5 Private Maintenance and Enforcement) —This section needs to be revised. Any maintenance agreements for the private open space must be done now with this FDP. Provide any agreements to the Town. 15. Sheet 1 (10.5 Parks, Trails, and Open Space) —Replace the last sentence of this section with the following: "The Public land dedication requirement will be met by cash -in -lieu payment to the Town due prior to recording the FDP. The cash -in -lieu amount is calculated to be $40,426.00 (based on $25,000.00/acre * 20.213 acres * 8%). 16. Sheet 1 (Note) —Change the title of the note at the bottom of the page from "REQUIREMENT FOR CENTIFICATES OF OCCUPANCY" to read "REQUIRMENTS FOR BUILDING PERMITS AND CERFICATES OF OCCUPANCY". Change the order of the notes, the building permit note should be #1. 17. Sheet 1 (10.5.14 Drainage) — In the first sentence change "The grading will be designed..." to read "The grading is designed...". Update the FDR date to read "February 23, 2017. (update this date as necessary until the FDR is approved. 18. Sheet 1 (10.5.16 Water Dedication) —Change the text "bases" to read "based" in the first and last sentences. We will calculate the water dedication if the requested information from Comment #4 is submitted. 19. Sheet 1 (Water Meter Table) —Edit the water meter table as follows: WATER METER TABLE QUANTITY SIZE TYPE 18 1.5" Multi -Family 1 3/4" Commercial Clubhouse/Pool 1 5/8" Commercial (Maintenance Bldg.) 1 1.5" Irrigation We cannot confirm the clubhouse meter size until the calculations are revised and resubmitted per our last review. 20. Sheet 1 (10.5.20 Development Schedule) —The dates need to be updated. E Misc: 21. Sheet 5 (10.6.26 Overall Grading Plan) — A storm plan and profile of the 30 outlet pipe must be added to the FUP's. This pipe will be constructed when Arbor St. is built. 22. Sheet 6 (10.6.52 Overall Utility Plan) — Refer to the Del Camino Central Filing No. 2 FP/Gateway North FUP comments memo and redlines. The water main near the MF building H needs to be moved out of the sidewalk and located in the asphalt. We cannot confirm the clubhouse/pool meter size until the calculations are revised and resubmitted per our last review comments. 23. Sheets 6 & 11 (Maintenance Meter) —The meter note needs to be moved on Sheet 6. The maintenance meter needs to be moved to the correction location on Sheet 11. 24. Sheet 8 (10.6.54 Photometric Plan) —The finish and height of the light poles needs to be called out. Confirm that this lights are consistent with the proposed adjacent Self -Storage lights. 25. Sheet 15 (10.6.40 Irrigation) —Add public works phone number of "303-833-3544" to Note #14, as redlined. 26. Sheet 25 (10.6.50 Building Elevation Plans) —The building elevations for the Maintenance Building and the Pool Building should be labeled as such. 27. See scanned FDP redlines for any additional comments. 28. Need to make independent submittals to the Frederick- Firestone Fire Protection District, the St. vrain Sanitation District and Weld County Public Works, The Applicant should return their responses to the comments and any original redlined drawings with their next submittal. 0