HomeMy WebLinkAbout 17-33 Approving a FDP for KFC at Firestone City CentreRESOLUTION N0.17MOO A RESOLUTION APPROVING A F11NAL DEVELOPMENT PLAN FOR KFC Al FIRESTONE CITY CENTRE WHEREAS, there has been submitted to the Planning and Zoning Commission and Board of Trustees of the Town of Firestone a request for approval of a final development plan for KFC at Firestone City Centre; and WHEREAS, all materials related to this application have been reviewed by Town Staff and found with conditions to be in compliance with Town of Firestone subdivision and zoning ordinances, Development Regulations, and related Town ordinances, regulations, and policies; and WHEREAS, the Firestone Planning and Zoning Commission held a properly noticed public hearing on the application, and has forwarded to the Board of Trustees a recommendation of approval with conditions; and WHEREAS, after aduly-noticed public hearing, at which evidence and testimony were entered into the record, the Board of Trustees finds the proposed final development plan should be approved, subject to certain conditions. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO. Section 1. The Final Development Plan for KFC at Firestone City Centre is hereby approved, subject to the conditions set forth in Exhibit A attached hereto and incorporated herein by this reference. PASSED AND ADOPTED this 9th day of August, 2017. ATTEST: Leah Vanarsdall, Town Clerk EXHIBIT A Final Development Plan KFC at Firestone City Centre Conditions of Approval General 1. Revise application materials to address comments set forth in the Town Engineer's memorandum dated June 29, 2017, a copy of which is attached hereto as Exhibit A- I. 2. Revise Sheet numbers 4-8 to "FDP-#." Sheet 1 3. Correct discrepancy in building size of building noted on Sheet 1 (3,161 sf) and Sheets 2 and 3 (3,168 sf). Sheet 2 4. In the Project Concept section, last line of first paragraph, revise "Subdivisions" (plural) to read "Subdivision" (singular). 5. Provide raw water requirement in the Water Demand Calculation section, as directed by the Town Engineer. 6. In the Architecture section, last sentence, reference Sheets 13-15 (Elevation sheets). 7. In the Setbacks section, first sentence, reference Sheet 3 (Site Plan sheet). 8. Correct alignment of services and providers in the Service Requirements section; revise "Power" to read "Electric." 9. Revise Water Demand Calculations with landscape ii7igation requirement. Sheet 5 10. Specify how roof drainage will be handled. 11. Add approximate locations of electrical feeds to and ,from Transformer; verify and indicate distances for access by man and vehicle as well as for shut -down by use of pole. Sheet 9 12. Revise location of street trees to a minimum of five feet away from frontage of City Centre Road. Sheet 11 13. Revise the sheet title in the Firestone Information Block to match the sheet title block (h7igation Plan). Sheet 12 14. Revise the sheet title in the Firestone Information Block to match the sheet title block (Landscape Plan). Sheet 19 15. Add sidewalk, curb and gutter, and any other site features, to Site Detail. Sheet 20 16. Remove all references to the City of Grand Junction. 17. Coi7ect numbering in the Exterior Lighting Notes. 18. Clarify the statement that post -curfew light levels will be reduced by "at least 50%%%." 19. Clarify time parking lot lights will be turned off (close of business is 10:00 pm according to the Site Operations section on Sheet 2). 20. Delete Acceptance Blocic. 21. Provide detail of the double -headed lamp. Additional Conditions 22. Revise FDP to provide details of retaining wall along Firestone Boulevard, the materials of which must match the existing retaining wall on the Burger King site. 7/24/20172:52 PM �I;nil:] R:�Firestone�Subdivisions�KFC FDP TB res.doc 3 EXHIBIT A-1 COLORADO CIVIL GROUP, INC. Engineering Consultants TO: Mr. Bruce Nickerson, Town Manager FROM: Dave Lindsay, Colorado Civil Group, Inc., Town Engineer Amber Messersmith, Colorado Civil Group, Inc., Town Engineer( E DATE: June 29, 2017 SUBJECT: KFC at Firestone City Centre PROJECT No.: 0668.0426.00 We have completed our review of the KFC at Firestone City Centre (FCC) Final Development Plan that was received on June 2, 2017 and offer the following engineering comments: Submittal Binder: 1. Title Commitment (10.3.5) —Harman Management Corporation, a Utah Corporation is listed as the owner in fee of the property according to the Title Policy dated November 10, 2016. An updated title commitment dated no later than one month prior to recording will be required. 2. Water Dedication (10.3.10) — The domestic demand is calculated to be 3.14 CBT shares. The irrigation demand is calculated to be 0.74 CBT shares. A total of 4 CBT shares will be deducted from the 100 share Firestone City Centre water pool. 3. Water Service Calculations (10.3.11) — It appears that IPC fixture counts were used. The irrigation demand needs to be included since there is not a separate irrigation tap/meter. The calculations need to be revised and re -submitted. However, it appears that a 1.54ch water meter is adequate for this FDP. (repeat) The comment response states that irrigation will be done overnight and does not need to be included in the water service sizing calculations. The Town has no way of "policing" overnight watering. The irrigation demand must be included in the calculations. It appears that this added demand will not cause a change in the water service meter size. 4. Final Drainage Report (10.3.15) -The Drainage Conformance Letter titled "Firestone KFC Drainage Letter" prepared by Perception Design Group dated March 2, 2017 was reviewed. The narrative of the report needs to discuss the 100-year WSEL in the existing drainage channel and site where the information came from (include necessary sheets from previous drainage reports). Add a statement about the retaining wall. Add a statement about the storm inlet and the elevation of ponding in the parking lot during the 100-year event. Add a vicinity map. Refer to drainage letter & map redlines. 5. Water Meter Easement — We will send the Applicant the executable water easement agreement for the water meter. We have reviewed the metes and bounds legal description and no problems were found. Final Development Plan: 6. Sheet 2 (10.5.16 Water Dedication) —Fill in the water dedication demands as follows: IRRIGATION DEMAND = 0.74 CBT SHARES DOMESTIC DEMAND = 3.14 CBT SHARES THE CBT DEDICATION FOR THIS FDP SHALL BE MET BY DEDUCTING 4 CBT SHARES FROM THE 100 SHARE POOL ORIGINALLY CREATED BY THE WITH THE FIRESTONE CITY CENTRE OFDP. 7. Sheet 2 (Address) —Add "Firestone, Colorado, 80504" to the address. 8. Sheets 3-5, 9, 11 & 20 (Existing Storm Sewer) —The existing storm sewer system in the access road to the northeast of the building is shown incorrectly. Refer to redlines on Sheet 4 for the correct configuration. This needs to be corrected through the FDP. 9. Sheet 3 (10.6.20 Site Plan, retaining wall) — A retaining wall has been added to the FDP along the north side of the parking lot. A detail must be provided for the retaining wall specifying the wall material, color, etc. A section view of the retaining wall should also be included in the FDP. The Applicant should be prepared to present wall materials and details at the public hearings. 10. Sheet 3 (10.6.20 Site Plan, signs) -The I-25 directional sign language is cut-off. The MUTCD sign numbers need to be added to the Site Plan. 11. Sheet 4 (10.6.26 Grading Plan, retaining wall) —The finished floor elevation of the building has been raised 2' to accommodate the water elevation in the channel. The retaining wall is 3.26' high and will require a handrail. A handrail detail needs to be added to the FDP specifying the material and color. 12. Sheet 4 (in .6.26 Grading Plan) —During the 100-year event, it appears that water will pond in the parking lot around the storm sewer inlet from the existing drainage channel. The 100-year ponding limits in the parking lot need to be graphically shown on the Grading Plan and the FDR Drainage Plan with the elevation labeled, see redlines. 13. Sheet 8 (Details) —The Type R Inlet detail provided is for a modified Type R Inlet detail which has a grated lid to be used for interim arterial roadway projects. Replace these details with the standard Type R Inlet detail (CDOT details can be used). 5 Misc: 14. Sheets 12-13 (1WSA Firestone Information Block) — The sheet title needs to be corrected in the Firestone Information Block on these sheets. (repeat) 15. Sheets 12-14 (10.15 Building Elev(;1tions) —Show where the building address will be displayed on the building, coordinate with the FFFPD. (repeat) 16. Sheet 20 (10.6.54 Lighting and Photometric Plan) —The acceptable block on this sheet should be removed. 17. See returned redlines for any additional comments. 18. Need to make independent submittals to the St. Vrain Sanitation District and the Frederick - Firestone Fire Protection District. These comments are provided to assist in the preparation of the FDP for this project. The Applicant's consultant should return their responses to the comments with their next submittal. Engineering has no objections to the next submittal being Mylar (after the public hearings). Let us know if there is anything else that we can help you with. 0