Loading...
HomeMy WebLinkAboutGEIST 'A' UNIT-63N67W - Flowline Abandonment Notice - Crestone - 3/4/2019State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 Off-Location Flowline FORM 44 Rev 03/18 Document Number: OGCC RECEPTION Receive Date: 03/04/2019 The Flowline Report, Form 44, shall be submitted to register, report realignment, report removal from service, or report abandonment of Off-Location Flowlines , Produced Water Transfer Systems, Domestic Taps, or Crude Oil Transfer Lines as required by the 1100 Series Rules. The Form shall also be submitted to report Grade 1 Gas Leaks from Flowlines per Rule 1104.k. 401959630 OFF LOCATION FLOWLINE FLOWLINE ENDPOINT LOCATION IDENTIFICATION Location ID:336437 Location Type:Well Site Name:GEIST 'A' UNIT-63N67W Number:32SWNW County:WELD Qtr Qtr:SWNW Section:32 Township:3N Range:67W Meridian:6 Latitude:40.185566 Longitude:-104.919244 FLOWLINE FACILITY INFORMATION Flowline Facility ID:462695 Flowline Type:Wellhead Line Action Type:Abandonment OFF LOCATION FLOWLINE REGISTRATION Flowline End Point Riser Latitude:40.185977 Longitude:-104.918813 PDOP:3.0 Measurement Date:11/27/2018 Equipment at End Point Riser:Separator Flowline Start Point Location Identification Location ID:331851 Location Type:Well Site Name:GEIST MULTI WELL PAD Number:0-2-32 County:WELD Qtr Qtr:NWNW Section:32 Township:3N Range:67W Meridian:6 Latitude:40.186560 Longitude:-104.919680 Flowline Start Point Riser Latitude:40.186800 Longitude : -104.919849 PDOP:1.1 Measurement Date:11/27/2018 Equipment at Start Point Riser:Well No Location ID OGCC Operator Number: City: Company Name: Address: 10633 CRESTONE PEAK RESOURCES OPERATING LLC 1801 CALIFORNIA STREET #2500 DENVER Zip:State:80202 Contact Person:Schuyler Hamilton Phone:(303) 774-4017 CO Email:Schuyler.Hamilton@Crestonepr.com Is the Operator a Tier One member of the Utility Notification Center of Colorado (UNCC) that participates in Colorado's One Call notification system?Yes No Operator Information Date Run: 3/4/2019 Doc [#401959630]Page 1 of 3 Flowline Description and Testing Type of Fluid Transferred:Multiphase Pipe Material:Carbon Steel Max Outer Diameter:(Inches)3.000 Bedding Material:Date Construction Completed:02/11/2009 Maximum Anticipated Operating Pressure (PSI):Testing PSI: Test Date: OFF LOCATION FLOWLINE ABANDONMENT Date:02/04/2019 Description of Abandonment Flowline was disconnected from separator and wellhead. Flowline was flushed with 25bbls fresh water prior to plugging. Line was verified free of hydro carbons with LEL monitor. Line was capped on both ends with 120lbs of slurry per state NTO, then backfilled on both ends. FLOWLINE FACILITY INFORMATION Flowline Facility ID:462694 Flowline Type:Wellhead Line Action Type:Abandonment OFF LOCATION FLOWLINE REGISTRATION Flowline End Point Riser Latitude:40.185965 Longitude:-104.918810 PDOP:2.8 Measurement Date:11/27/2018 Equipment at End Point Riser:Separator Flowline Start Point Location Identification Location ID:331856 Location Type:Well Site Name:GEIST-63N67W Number:32SENW County:WELD Qtr Qtr:SENW Section:32 Township:3N Range:67W Meridian:6 Latitude:40.183726 Longitude:-104.916334 Flowline Start Point Riser Latitude:40.183783 Longitude : -104.916137 PDOP:1.8 Measurement Date:11/27/2018 Equipment at Start Point Riser:Well Flowline Description and Testing Type of Fluid Transferred:Multiphase Pipe Material:Carbon Steel Max Outer Diameter:(Inches)3.000 Bedding Material:Date Construction Completed:02/17/2004 Maximum Anticipated Operating Pressure (PSI):Testing PSI: Test Date: OFF LOCATION FLOWLINE ABANDONMENT Date:02/04/2019 Description of Abandonment Flowline was disconnected from separator and wellhead. Flowline was flushed with 25bbls fresh water prior to plugging. Flowline was verified free of hydro carbons with LEL monitor. Line was cut below ground level. Line was capped on both ends with 120lbs of slurry per state NTO, then backfilled on both ends. No Location ID Comments OPERATOR COMMENTS AND SUBMITTAL Date Run: 3/4/2019 Doc [#401959630]Page 2 of 3 Schuyler.Hamilton@Crestonepr.com EHS Field Technician 03/04/2019 Schuyler Hamilton COGCC Approved:Director of COGCC Date: Based on the information provided herein, this Flowline Report complies with COGCC Rules and applicable orders and is hereby approved. Title: Email:Date: Print Name: Signed: I hereby certify that the statements made in this form are, to the best of my knowledge, true, correct and complete. Attachment Check List Att Doc Num Name Total Attach: 0 Files Date Run: 3/4/2019 Doc [#401959630]Page 3 of 3