HomeMy WebLinkAboutHurt 1, IONE 43-4, LONE 6-8-4 - Flowline Abandonment Notice - Crestone - 7/8/2024State of Colorado
Energy & Carbon Management Commission
1120 Lincoln Street, Suite 801, Denver, Colorado 80203
Phone: (303) 894-2100 Fax: (303) 894-2109
Flowline System
FORM
44
Rev
02/20
Document Number:
ECMC RECEPTION
Receive Date:
07/08/2024
The Flowline Report, Form 44, shall be submitted to register, report realignment, report removal from service, provide pre-
abandonment notices, or report abandonment of Off-Location Flowlines, Flowline Systems, Produced Water Transfer Systems,
or Crude Oil Transfer Lines or Systems as required by the 1100 Series Rules. The Form 44 shall also be submitted to register,
report realignment, or report abandonment of Domestic Taps, and to report Grade 1 Gas Leaks from Flowlines per Rules 610 and
906.
403786062
FLOWLINE DESCRIPTION AND TESTING
Type of Fluid
Transfered:
Multiphase
Pipe Material:Carbon Steel
Max outer Diameter
(inches):
2.000
Bedding
Material:
Native Materials
Date Construction
Completed:
07/18/2015
Max Anticipated Operating
PSI:
Testing
Pressure:
125 Test Date:03/06/2023
Description of Corrosion Protection:
Crestone pipelines are covered in a protective external coating. Flowlines are subject to thorough inspections and
fabrication standards during installation to minimize coating and pipe defects. Crestone maintains a chemical program
to reduce internal corrosion. If a flowline is found to lack integrity, Crestone will investigate, report, and remediate any
spills in accordance with the 900 series rules.
Description of Integrity Management Program:
125
FLOWLINE SYSTEM
FLOWLINE SYSTEM IDENTIFICATION
Facility ID Number:485466 Flowline System
Name:
CPR Flowline System
FLOWLINE SYSTEM REGISTRATION
A representative legal location and associated latitude and longitude near the center of the Flowline
System.
County:WELD
Qtr Qtr:SENE Section:9 Township:2N Range:67W Meridian:6
Latitude:40.154619 Longitude:-104.892886
GPS Quality Value:Type of GPS Quality Value:Measurement Date:03/10/1978
ECMC Operator Number:
City:
Company Name:
Address:
10633
CRESTONE PEAK RESOURCES OPERATING LLC
555 17TH STREET SUITE 3700
DENVER Zip:State:80202
Contact Person:James Miller
Phone:(720) 984-7460
CO
Email:jmiller@civiresources.com
Is the Operator a Tier One member of the Utility Notification Center of Colorado (CO811) that participates in Colorado's
One Call notification system?Yes No
Operator Information
Date Run: 7/8/2024 Doc [#403786062]Page 1 of 3
Crestone flowlines are pressure tested prior to placing flowlines into service. Flowlines are tested on an annual basis
in accordance with COGCC 1104 series rules. If a flowline is found to lack integrity, Crestone will investigate the root
cause, as well as report and remediate any spills in accordance with the 900 series rules. All repairs will be completed
in accordance with COGCC 1102 Series rules.
Description of the construction method used for public by-ways, road crossings, sensitive wildlife habitats,
sensitive areas, and natural and manmade watercourses (i.e., open trench, bored and cased, or bored only), if
applicable.
The majority of flowlines are not near any known and defined public receptors or road crossings. Those that are,
county permits are acquired prior to construction of county road crossings. Permit conditions contain minimum
construction requirements.
FLOWLINE SYSTEM ABANDONMENT VERIFICATION
Date:04/09/2024
Description of Abandonment Verification:
Form 44 filed to report POST-ABANDONMENT verification. The following flowlines were partially abandoned in
place:
12310093_FL: serviced the Hurt 1 (05-123-10093) was partially abandoned in place as per Rule 1105.d and
verified by a third party. The remainder of the flowline was removed, and bellholes were backfilled and the land
surface was graded.
I12319986_FL: The flowline segment servicing IONE 43-4 that was co-located with Ione 6-8-4 (12331571_FL) was
partially abandoned in place as per Rule 1105.d and verified by a third party. The remainder of the flowline was
removed, and bellholes were backfilled and the land surface was graded.
Third party verifications are attached.
Updated GIS data attached.
All other flowline statuses in this system will remain as previously reported.
The abandoned Flowline System was located within the jurisdiction(s) of the following local government(s).
Abandonment Verification
(No Jurisdiction)
flowlines@civiresources.com
Sr. Regulatory Analyst
07/08/2024
Stephany Olsen
ECMC Approved:Director of ECMC Date:
Based on the information provided herein, this Flowline Report complies with ECMC Rules and applicable orders and is hereby
approved.
Title:
Email:Date:
Print Name:
Signed:
I hereby certify that the statements made in this form are, to the best of my knowledge, true, correct and complete.
Form 44 filed to report POST-ABANDONMENT verification. The following flowlines were partially abandoned in place:
12310093_FL: serviced the Hurt 1 (05-123-10093) was partially abandoned in place as per Rule 1105.d and verified by
a third party. The remainder of the flowline was removed, and bellholes were backfilled and the land surface was
graded.
I12319986_FL: The flowline segment servicing IONE 43-4 that was co-located with Ione 6-8-4 (12331571_FL) was
partially abandoned in place as per Rule 1105.d and verified by a third party. The remainder of the flowline was
removed, and bellholes were backfilled and the land surface was graded.
Third party verifications are attached.
Updated GIS data attached.
All other flowline statuses in this system will remain as previously reported.
Comments
OPERATOR COMMENTS AND SUBMITTAL
Date Run: 7/8/2024 Doc [#403786062]Page 2 of 3
ATTACHMENT LIST
Att Doc Num Name
403786063 THIRD PARTY VERIFICATION
403842996 FLOWLINE SYSTEM GIS SHP
403843124 THIRD PARTY VERIFICATION
403848002 ABANDONMENT IN PLACE DOCUMENTATION
Total Attach: 4 Files
COA Type Description
CONDITIONS OF APPROVAL, IF ANY LIST
User Group Comment Comment Date
Stamp Upon
Approval
Total: 0 comment(s)
General Comments
Date Run: 7/8/2024 Doc [#403786062]Page 3 of 3