Loading...
HomeMy WebLinkAbout 17-05 - Approving Murphy Express FDPRESOLUTION NO. A RESOLUTION APPROVING A FINAL DEVELOPMENT PLAN FOR MURPHY EXPRESS AT FIRESTONE CITY CENTRE WHEREAS, there has been submitted to the Board of Trustees a request for approval of a final development plan for Murphy Express at Firestone City Centre; and WHEREAS, all materials related to this application have been reviewed by Town Staff and found with conditions to be in compliance with Town of Firestone subdivision and zoning ordinances, Development Regulations, and related Town ordinances, regulations, and policies; and WHEREAS, the Firestone Planning and Zoning Commission held a properly noticed public hearing on the application, and has forwarded to the Board of Trustees a recommendation of approval with conditions; and WHEREAS, after aduly-noticed public hearing, at which evidence and testimony were entered into the record, the Board of Trustees finds the final development plan should be approved subject to certain conditions. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FIRESTONE, COLORADO, Section 1. The final development plan for Murphy Express at Firestone City Centre is hereby approved, subject to the conditions set forth on Exhibit A attached hereto and incorporated herein by reference. PASSED AND ADOPTED this 25th day of January, 2017. Medina, Town Clerk 1 Paul Sorensen, Mayor EXHIBIT A Final Development all Murphy Express at Firestone City Centre Conditions of Approval 1. Address Town Engineer comments memo dated November 11, 2016, attached hereto as Exhibit A-1. 2. Revise FDP to show all above -ground details, including materials and colors, of retaining wall and any fencing or railing on the wall, to be constructed along Firestone Boulevard. The materials and colors for the wall, as well as any fencing, railing and other improvements in such details, shall be subject to review and approval by Town staff. 3. Correct the typo in the Town Approval Block ("Town"). 4. Revise "Aliquot Description" to read "Legal Description." 5. Revise the percentages in the Land Use Table so that they total 100%. 6. Correct discrepancy between the parcel area shown in the Land Use Table and in the Legal Description. 7. Clarify why a category has been included in the Land Use Table for Oil/Gas Well Setback Area, when it appears there is none within the FDP. 8. A title commitment for the property within the FDP needs to be provided to confirm ownership at the time of recording the FDP. 9. Revise title of Sheet 16 to read "Civic Details." 10. Revise the Project Concept section on Sheet 2 to refer to the platted lot. 11. In the Water Demand Calculation section on Sheet 2, fifth line, delete the extraneous "the" at the beginning of the line. 12. In the Circulation section on Sheet 2, revise the end of this section to read "Murphy Express development" rather than "Developments." 13. In the Parking Information table on Sheet 3, delete the "Required" portion of the table. (Required parking is not "TBD"; the required parking will be as set forth in the "Spaces" section of the table of the approved FDP.) 2 14. Add sidewalk connection into site from City Centre Road; the details for the connection shall be subject to review and approval by Town staff. 1/202017 4:00 PSI [hmF:] R:�Firestone�.Subdivisions�Niufphy Express FDP TB res.docx 3 EAH115IT A-1 Town Engineer Comments Memo dated November 11, 2016 COLORADO CIVIL GROUP, INC. Englneeting Consultants TO: Mr. Bruce Nickerson, Town Manager FROM: Dave Lindsay, Colorado Civil Group, Inc., Town Engineer Lindsey Green, Colorado Civil Group, Inc., Town Engineer c' DATE: SUBJECT: PROJECT No.: November 11, 2016 Murphy Express FDP 0668.0425.00 We have completed our review of the Murphy Express FDP submittal. We offer the following engineering comments: General: 1. A Subdivision Plat will be submitted by THE and process separately. The Plat will create a lot for Murphy Express. The Murphy Express Application should be revised accordingly. Submittal Binder: 2. (10.3.2 Development Application) —The application date was left blank. The site has been addressed as 4615 City Centre Road, Firestone, CO 80504 3. (10.3.5 Title Commitment) —THE Firestone Development, L.L.C., a Missouri limited liability company is listed as the owner in fee simple of the property according to the Title Commitment with an effective date of September 7, 2016. An updated title commitment dated no later than 1 month prior to recording will be required. 4. (10.3.10 Water Dedication) —The domestic demand for the CBT Shares was calculated correctly, which results in a 1.08 CBT Share dedication. The landscape demand was calculated based on the Town's standard of 2.5 CBT Shares/acre of irrigation area. The land use table on the FDP coversheet states that there is 14,028 square feet of landscaped area, this results in a 0.81 CBT Share dedication. The commercial demand and landscape demand will require the Murphy 0 Express site to dedicate 2.0 CBT Shares. The CBT dedication for this FDP shall be met by deducting 2 shares from the 100 share pool originally created by THE with the Firestone City Centre development. 5. (10.3.11 Water Service Calculations) — It doesn't appear the hose bibs were correctly added to the fixture count total, please revise. Based on the water sizing spreadsheet, the site will require a 11/2" meter. 6. (10.3.13 Traffic Impact Study) —The Traffic Conformance letter dated October 10, 2016 states that while the proposed improvements increase the developable land and site trips from the originally approved traffic report, there will be no adverse impacts to the existing transportation network due to the other future developable lots within the City Centre complex are anticipated to result in smaller footprints, which will result in an overall reduction. We recommend approval of the Traffic Conformance dated October 10, 2016 for the Murphy Express Gas Station — Firestone City Centre. Final Drainage Report: 7. The total runoff from the developed site does not exceed the approved amount of runoff from the Master Plan created for the Firestone City Centre site. The storm detention is offsite, requiring no onsite detention pond for this FDP. 8. Please provide calculations for the 10 and 100 year storm events for the site, including the time of concentration, runoff coefficient calculations and rational method calculations for each basin. The Town of Firestone rainfall intensity curve needs to be utilized for the calculations. 9. Please provide the storm sewer and inlet calculations based on runoff calculations (comment #8) in order to confirm the site's interior storm system is adequately sized. 10. Basin D appears to be draining offsite, please confirm that the existing inlet intercepting the flow has adequate capacity. 11. The proposed storm sewer system needs to discharge into the channel as opposed to the existing storm inlet in City Centre Road. 12. Calculations need to be provided in order to ensure the existing channel north of the facility will not be negatively impacted by the proposed retaining wall. Final Development Plan: 13. (10.5.2/10.6.2 Title Block) —Please adjust the title of the documents to state "A Portion of Tract 14. (10.5.4 Owner/Developer) —Please list the owner as the name appears exactly in the title commitment. Currently, the title commitment lists THE Firestone Development, L.L.C., a Missouri limited liability company as the owner. If the intent is to sell the parcel and Murphy Oil USA, Inc., a Delaware corporation is to be the new owner, the title commitment needs to reflect such, prior to recording. 5 15. (10.5.6 Legal Description) — The provided legal description has a closing error of 0.111 please revise. The distance and bearings on the site plan need to match the legal description provided. The applicant can also choose to provide an aliquot description based on the Subdivision Plat that will be submitted by THF. 16. (10.5.8 Land Use Table) — It appears there is a mathematical error in the land use table, the current land use areas do not add up to the proposed lot size. 17. (10.5.15 Utilities) —There is a 2" water service stub, 6" fire line stub and 6" sanitary sewer service stub already installed for the parcel due east of the east entrance to Tract D. These existing service stubs need to be used. The water service will be reduced to 1 1/2" in the meter pit. 18. (10.5.15 Utilities) —Please add the following table to the general notes page: WATER METER TABLE QUANTITY SIZE TYPE 1 1 Y2" COMMERCIAL 19. (10.5.16 Water Dedication) -Please fill in the required CBT dedications required for this parcel. Irrigation Demand = 0.81 Domestic Demand = 1908 Also include the following verbage after the demand requirements: "A TOTAL OF 2 SHARES SHALL BE TRANSFERRED TO THE TOWN PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. THE CB DEDICATION FOR THIS FDP SHALL BE MET BY DEDUCTING 2 SHARES FROM THE 100 SHARE POOL ORIGINALLY CREATED BY THE WITH THE FIRESTONE CITY CENTRE DEVELOPMENT." 20. (10.5.22 Acceptance Block and Notary) —Please label the owner's name beneath the signature block and verify that the Owner's name matches the Title Commitment exactly. See Comment 10. 21. (10.6.5 Parcel Boundaries) —The distance and bearings need to clearly be shown for the entire proposed portion of Tract D. 22. (10.6.9 Site Plan) —Note 7J proposes a chain link fence on top of a retaining wall. A detail should be provided of both. 23. (10.6.20 Mailboxes, Signs, Lighting and Advertising Devices) — It is recommended that a sign directing traffic to I-25 be placed across the road (South side of City Centre Road), in order for the egress traffic to clearly be directed through the site. 24. (10.6.22 Utilities) —There are currently utility stubs west and east of the existing east access to Tract D. The services for this FDP need to connect to the existing stubs. The required meter size for this FDP will be 1 %'1 Please include a note on the plans that states the meter setter includes a 2" x 1 Y2" reducer. 0 Misc: 25. (10.6.22 Utilities) — Please label the storm sewer system components including sizes, types, inverts, etc. 26. (10.6.32 Landscape Plan) —The landscape plan may need to be modified due to the utility service relocations. Please show both sets of existing utility stubs and ensure no landscaping is located above them. The Town's criteria is no trees within 10' and shrubs within 5' of utility lines. 27. (10.6.54 Lighting and Photometric Plan) — It appears the parking lot lights are flat lens LED lights. The style matches the style of the lights at Burger King and the Inline Shops, both at Firestone City Centre. It should be noted however that the proposed lights in this FDP have a 18' pole height and Burger King and Inline Shops have pole heights of 351 . 28. See returned redlines for any additional comments. 29. Need to make independent submittals to St. Vrain Sanitation District and Frederick- Firestone Fire Prevention District. These comments are provided to assist in the preparation of the FDP for this project. The Applicant's consultant should return their responses to the comments with their next submittal. We will be happy to meet with the applicant and their consultants to review these comments. Let us know if there is anything else that we can help you with. 7